Nice video. I hope this event stay on the calendar for next year I had hoped to get this year but by the time it had all been announced I wasn't able to. No.2 was doing a nice bit of banking looked like it was pushing Lucie along aswell
Isn't this the Railway Mr John Beesley volunteers @ that used to run the Footplate supply Co and made the lanterns, double home boxes, oilers, and all the other neat stuff?!?!?!???
It's not just a matter of rebuilding the platforms etc.....its the 6 figure sum required to do all the other work required as well. Signalling connections are required etc....the quarry branch is currently operated as a long siding.
Not gonna lie this event kinda just... happened. It wasn't very well advertised and feels like a gala yeah you've got locos from Tanfield, KESR and somehow NYMR but I dunno when I saw the lack of videos on this superb gala I was very surprised
Nice 👍 I'm going on that Railway this Sunday!
A very enjoyable video from the railway rally event. Excellent shots from the line.
Nice video. I hope this event stay on the calendar for next year I had hoped to get this year but by the time it had all been announced I wasn't able to. No.2 was doing a nice bit of banking looked like it was pushing Lucie along aswell
Was a fun event, Lucie definitely did its share of the work too through the day, although didn't make as much of a show with steam effects.
Super great video from the event :)
Isn't this the Railway Mr John Beesley volunteers @ that used to run the Footplate supply Co and made the lanterns, double home boxes, oilers, and all the other neat stuff?!?!?!???
yep, John beesley owns 16in Hunslet Beatrice!
great little railway........might call in next time in the dales......:-)
Great shots of the event, nice mix of stock in use👍
A really nicely done video! It was a fantastic event!
Great video! I’m surprised the E&BASR hasn’t extended into Skipton. Rebuilding platforms five and six at Skipton would be all that difficult.
It's not just a matter of rebuilding the platforms etc.....its the 6 figure sum required to do all the other work required as well. Signalling connections are required etc....the quarry branch is currently operated as a long siding.
@@darkfrag83 Ah right. That’ll need to be split.
11:15 an electric autocar?! 😲🤩
yep!
@@SteamingThroughYorkshire nice one.....:-)
Not gonna lie this event kinda just... happened. It wasn't very well advertised and feels like a gala yeah you've got locos from Tanfield, KESR and somehow NYMR but I dunno when I saw the lack of videos on this superb gala I was very surprised
I see me on shed 😂
double header
you could do with a bit more support from the visiting puplic.....can't the NYMR or Keighley give you some "tips"....?