Building an ICP Savannah S. Ep. 83: windshield
ฝัง
- เผยแพร่เมื่อ 29 ส.ค. 2024
- Welcome to a new episode of "My aeronautical corner, building an ICP Savannah S".
In this episode I am going to install the windshield. One of the things I was most worried about installing. The assembly manual does not explain this work very well, and I only found these videos on the internet:
• Savannah S windshield ...
• Savannah S windshield ...
But with the help of the ICP engineer, assembly was very easy and it turned out very well.
Apoya la continuidad de este canal. Gracias / Support the continuity of this channel. Thank you.
- buymeacoffee.com/mirinconaeronautico
Ahí se ve todo el empeño que le pones a la construcción de ese ICP. Mide, marca, comprueba, protege, taladra, desmonta, quita rebabas, monta, copia, desmonta, taladra, monta... Es todo un trabajazo y requiere paciencia y muchas ganas. Muy buen trabajo, Manolo. Enhorabuena. Y no tengas reparo en que se alargue un poco más de la cuenta el vídeo. Con tan buen contenido se nos hace corto. Un abrazo y adelante!
Gracias Javier. El kit dice que se fabrica en 350-400 horas. Ja ja ja ja. llevo 1064.
Envidia sana de ese avión.
Saludos
Ja ja ja.
Espero que AESA no obligue a hacer la prueba del pato... 😅 . Gran trabajo 👏 👏
Espero que no. Je je je.
Eso. Pregúntales si les valdría con un abejorro. 😅