Pole Foundation Design

แชร์
ฝัง
  • เผยแพร่เมื่อ 15 ต.ค. 2024
  • In this session, foundation design for pole structure based on the International Building Code (IBC) Method is explained.
    Flagpole, traffic sign poles, light poles, etc. are some examples of structures who are being supported on pole foundations.
    Pole foundations are generally drilled shaft, bored pile or caisson foundation types. The lateral loads on pole foundations are more significant compared to the vertical loads.

ความคิดเห็น • 19

  • @zackpe
    @zackpe 13 วันที่ผ่านมา +1

    WHY DID YOU USE Kn IN YOUR EXAMPLE NOT LBS?

    • @CyrusSolutions
      @CyrusSolutions  13 วันที่ผ่านมา

      Thanks for your comment. There's no specific reason for my choice. I'm comfortable using both the metric and imperial systems, so it wasn't meant to imply anything.

  • @myke0101
    @myke0101 9 หลายเดือนก่อน +1

    Thank you. insightful video. May i suggest to provide example for constrained condition. Thanks

    • @CyrusSolutions
      @CyrusSolutions  7 หลายเดือนก่อน

      thanks for your comments. We will provide that as soon as possible

  • @keykan53
    @keykan53 ปีที่แล้ว +1

    Thank you for the video, very nice way to explain it. Can you please suggest how you design anchor bolts connection for the same structure instead of embedding pole inside the concrete?

    • @CyrusSolutions
      @CyrusSolutions  ปีที่แล้ว +2

      I am glad you liked it.
      Anchor bolt design for the poles is very similar to AB design for columns base plate with overturning moment. You can simply calculate the tensile force in the anchor bolts by dividing the overturning moment by the AB spacing. It is a bit conservative, but simple and easy. Then you can calculate the required AB size and development length based on the calculated tensile force.

  • @designsteelconcrete4783
    @designsteelconcrete4783 9 หลายเดือนก่อน +1

    thanks FOR YOUR VIDEO, It is very Useful, May ask foundation for imbedded Poles is it required Top reinforcement??and COde reference pls if available?

    • @CyrusSolutions
      @CyrusSolutions  7 หลายเดือนก่อน

      thanks for your comments.
      I am not sure if I quite understand your question. what do you mean by top rebar?

  • @RaGRoG904
    @RaGRoG904 ปีที่แล้ว +1

    good job thanks, keep posting those videos

    • @CyrusSolutions
      @CyrusSolutions  7 หลายเดือนก่อน

      thank you very much for your review and comments.
      we will prepare more contents soon.

  • @smokiibear01
    @smokiibear01 8 หลายเดือนก่อน +1

    Please provide design for foundation element itself. What should the reinforcement design be based on? Between D/3 to 2D/3?

    • @CyrusSolutions
      @CyrusSolutions  7 หลายเดือนก่อน

      thanks for your view and comments.
      The focus on this session was on the sizing of the drilled shaft. we will provide more contents on the structural design of the shaft itself.

  • @mwirigimarete2231
    @mwirigimarete2231 ปีที่แล้ว +2

    thank you for this awesome video. The total applied base shear in your calculations is not correct.

    • @CyrusSolutions
      @CyrusSolutions  11 หลายเดือนก่อน

      Thanks a lot for your comment. The focus on this session is not shear calculation on the pole, it is more about sizing the concrete shaft, but out of curiosity, why do you think the base shear is not correct?

  • @davidpatterson5426
    @davidpatterson5426 ปีที่แล้ว +3

    How were forces on pole, arms, and light fixtures calculated?

    • @CyrusSolutions
      @CyrusSolutions  ปีที่แล้ว +1

      Thanks for you comment. I hope the presentation was useful.
      The loads have been calculated in accordance with the IBC standard. The details of load calculations was not provided as it was of secondary importance to the main goal of the presentation which is the foundation design based on the IBC.

    • @telestruct
      @telestruct 5 หลายเดือนก่อน

      Hello, The forces on the pole and its appurtenances should be calculated based on respective effective projected area (EPA) and the shape factor (Cf) for each item, the resulted area (m2) multiplied by the velocity pressure (KN/m2) shall give you force (KN).

  • @maherhaddad6455
    @maherhaddad6455 ปีที่แล้ว +1

    The shear value is correct, but the placement must be at the base of the pole.

    • @CyrusSolutions
      @CyrusSolutions  11 หลายเดือนก่อน

      The total shear force will be transferred to the concrete shaft at its connection with the pole, right on the top.