Calculating Belt Length (Screencast)

แชร์
ฝัง
  • เผยแพร่เมื่อ 15 ม.ค. 2025

ความคิดเห็น • 6

  • @tzb05
    @tzb05 ปีที่แล้ว

    I appreciate your help in providing me a brief equation or rule of thumb to calculate the specific energy consumption as Kwh/Mt/Km , belt speed = 2.5 meter per second, trough angle = 30 , surcharge = 25, material = excavated soil (sand) , lump size less than 150 mm , density =1,550 kg/M3 , belt length = 5 Km (multiple flights ) , Flow = 3500 to 4,000 Mt/Hr , Route inclination= zero inclination, Width = 1,200 mm , considering these inputs , how much electricity will be consumed in electrical motor as Kwh per metric ton (Weight) per Km (distance)

  • @PatrickHemmes
    @PatrickHemmes หลายเดือนก่อน

    This is a nice estimation, but i dont think it would be graded correctly on my exam.

  • @sadiqahmed-mg6or
    @sadiqahmed-mg6or ปีที่แล้ว +1

    I have belt timing I need help me for about siz

  • @hosseinhayati9820
    @hosseinhayati9820 2 ปีที่แล้ว

    I will calculate to figure out the pullys and thiming belt I need to order. When you say pully diameter, do you mean outer diameter/edge of the timig pulley?

    • @wisconline
      @wisconline  2 ปีที่แล้ว +3

      Yes. The outer edge where the inside of the belt will be touching the outer edge of the pulley.

  • @elcomandante9299
    @elcomandante9299 6 หลายเดือนก่อน

    Pi? Did sumone say pi?