I'm a lone worker myself. For me, other people around disrupts my concentration. Of course, no one knows everything, so I get my human input from TH-cam. I can start, take breaks, quit, at my own convenience which I like the most. Having things like skidloaders and laser levels make it possible.
No footer drains and the foundation and footer are raised up about 2 feet from the surrounding grade. Rain spouts will be ran into 4 inch piping and into the nearby drainage ditch.
I would build a castle on a well tamped bed of crusher
About 8 inches of CR1 and rake out 2 inches of washed 1 inch and she's perfecto!
I'm a lone worker myself. For me, other people around disrupts my concentration. Of course, no one knows everything, so I get my human input from TH-cam. I can start, take breaks, quit, at my own convenience which I like the most.
Having things like skidloaders and laser levels make it possible.
DID YOU INSTALL FOOTER DRAINS? AND WHAT ARE YOU DOING WITH RAIN SPOUTS?
No footer drains and the foundation and footer are raised up about 2 feet from the surrounding grade. Rain spouts will be ran into 4 inch piping and into the nearby drainage ditch.