  • Dangling Logic in Project Schedules
    Logic Driven project schedules can suffer from two kinds of open-ended or Dangling Logic, which makes the resulting schedule unreliable for dates or float analysis.
    Project schedules need robust logical bases to reach two primary objectives:
    1- A schedule that accurately represents a true and achievable plan for executing the work - including technological and resource constraints.
    2- A schedule that supports accurate forecasting of consequences when the work does not proceed as originally planned - for example when activities fail to start or finish on time.
    Planning - P6 Channel videos Link:
    / planningp6
    50- How to use Filldown Option in primavera p6 | Copy and duplicate activities values in p6 | primavera
    • How to use Filldown Op...
    51- How to Assign and Remove Multiple Resources in Primavera P6 Schedule | Multiple Activities P6 | Tips
    • How to Assign and Remo...
    52- How to Assign Cost Loading from Excel to Primavera P6 Import and Export | Tips and Tricks | Planning
    • How to Assign Cost Loa...
    53- How to add Assign and change Resource Rate Type in Primavera P6 | Add resource Rates in P6 | P6 |
    • How to add Assign and ...
    54- How to Assign Overtime Factor to Resources in primavera P6 | Calculate overtime cost in primavera p6
    • How to Assign Overtime...
    55- What is the difference between Retained Logic and Progress Override and Actual Dates in Primavera P6
    • What is the difference...
    56- How to track and trace out of sequence activities in primavera p6 | apply filter in p6 | Planningp6
    • How to track and trace...
    57- How to assign and change Relationships by using Excel to primavera P6 | lag and type relationships
    • How to assign and chan...
    58- How to Assign and change and remove Relationship of activities from Gantt Chart in Primavera P6 | P6
    • How to Assign and chan...
    59- How to Use Trace Logic In Primavera P6 | Save Layout and Print Trace Logic | Planning P6 | Projects
    • How to Use Trace Logic...
    60- How To Add Assign Calculate Est Weight Apply Top Down Estimation In Primavera P6 | Weightages | p6 |
    • How To Add Assign Calc...
    61- How to Create Assign and filter Activity Codes in Primavera P6 | Activity codes for schedule P6 |
    • How to Create Assign a...
    62- How to Create Assign Group and Sort Project Codes in Primavera P6 | Create Filters for Project code
    • How to Create Assign G...
    63- How to Renumber Activity IDs To Arrange Activities in Primavera P6 | Change Activity IDs | Tips P6
    • How to Renumber Activi...
    64- How to Show Customize and Print WBS Chart View In Primavera P6 | Print Setup | P6 Tips and Tricks |
    • How to Show Customize ...
    65- How to do Resource Leveling in Primavera P6 | Level overallocation of Resources in P6 | Planning P6
    • How to do Resource Lev...
    66- How to Add and create column Total Budgeted Units In primavera P6 by using Global Change option p6
    • How to Add and create ...
    67- How to create activities in excel and import to primavera p6 | Add export activities p6 | Planningp6
    • How to create activiti...
    68- How to remove individual selected multiple and all relationships from activities in primavera p6
    • How to remove individu...
    69- How to remove the schedule log file error in primavera p6 | Tips and Tricks Primavera | PlanningP6 |
    • How to remove the sche...
    70- How to extract create and generate lag report in primavera p6 | PlanningP6 | Tips and Tricks P6 | P6
    • How to Create Extract ...
    71- How to create and remove dangling logic in primavera p6 | Planningp6 | Logics in primavera | Tricks
    • How to create and remo...
    #danglinglogic,#relationships,#primaverap6

ความคิดเห็น • 2

  • @ahmedabdelfatah92
    @ahmedabdelfatah92 2 ปีที่แล้ว +1

    thank u for good explain
    but i need to know how to find all dangling activity at schedule not one by one
    and how to solve it automatic if u have method because one by one take more time if u have mega project
    thanks

    • @PLANNINGP6
      @PLANNINGP6  2 ปีที่แล้ว

      *_You are Welcome🙂
      The best way is to catch the dangling activities one by one, by this method error chances are nil._*
      *_However, you can use the lag filter on the SS relationship and after applying the filter then check the dangling logic.
      Secondly, you can filter the processor and successors of activities. but we are totally against these methods because we faced a lot of errors._*
      *_Thus, the best practice is to consume time and check the activities one by one to avoid the mistakes and errors._*