Maybe this is their best route because of what equipment is available...seems a good way to beat a grader to early sale/scrap with high repair costs along the way
Given the cost of fuel for heavy construction equipment plus the amount the operators are paid, it may have been more cost effective to have one operator and one piece of equipment to do the job than 2 operators and 2 pieces of equipment
Maşallah hayirli isler ustam
super.
Interesting video. If a graders all you got then good job 👍
Cool
I would have thought, this would be best done by a bull dozer, then the finish work for the Grader !
D6 would of been perfect could of compacted it with the tracks then cut a smooth spot for your compaction test on to the next lift
Вот что значит не опытный машинист автогрейдера.
Super
dzifa ndz
Maybe this is their best route because of what equipment is available...seems a good way to beat a grader to early sale/scrap with high repair costs along the way
He seems to be trying to do it greatly.
Not a lot of either circle or blade side shift happening where it would have saved an extra pass or three
Sukses selalu💪👍🏽☕
god
ماشاءالله 😘
masallah
Que masiso
I'm looking for a job with a grader, I've worked professionally for eight years, now I'm living in Germany
Se pudo haber ahorrado tanto trabajo, los camiones le pidieron tirar más separado el material y es menos trabajo para la moto
Me podrías decir, como se llama el trabajo que está aciendo la moto?
one more pass on his initial flat area and he could have finished that job easy. Not work for a Grader but if its all they got then gj.
Flating without watering and mix?!
le hace falta mucho para esa tarea es mejor una 815 o un d6
Que le hace falta práctica al operador
اینا از کاترپیلاها چین منتاژ کرده هستن ؟؟؟؟ خیلی زورش کمه
Not the best assignment for a motor grader. If a grader is all you got I guess you work with it but this ain't the most productive route.
Given the cost of fuel for heavy construction equipment plus the amount the operators are paid, it may have been more cost effective to have one operator and one piece of equipment to do the job than 2 operators and 2 pieces of equipment
Bad Andy 1 dozer would do the trick dont need 2 of them
Still hay to cleaning up with the blade.
Another way of wasting money and time. But if that they got I can feel them
E.D. Law a good dozer man can finish grade. This is inefficient use of a machine.
Here new Zealand's that's done by dozer
Yeah. Probably the rest of the world too. Seems to work but I think there's a better way
fuking aee push it out then grade em up take half the time effort and diesel
עייף עייף הבן אדם
This driver let me say it this way have nothing to do with a nice Grader like that , all his work is so wrong
Автор худи руки дрожат
رانندش تر زده با رانندهیش
This is not a job for a grader but rather a skip-loader
Греция
With dozer in 30 minutes did better work and drink less fuel
4 ASSI COMMERCIALE exactly what I was thinking. Specially a 14M. D5 could have done it faster for cheaper
Miki.DELAsGrederom.A...SimeKazeToBOLJIsiOdStarogKENjCA....