Building a Wooden Kayak in Time-lapse: CLC Sectional Shearwater Sport

แชร์
ฝัง
  • เผยแพร่เมื่อ 23 ก.ค. 2024
  • A time-lapse of the complete build of a stitch-and-glue wooden kayak (CLC Sectional Shearwater Sport). This build was completed over the winter 2021-22. The process is broken down in the following sections:
    0:00 Panel Assembly and Stitching
    0:55 Gluing and Filleting
    2:17 Planing and Sanding
    3:03 Fiberglass Application
    3:49 Coaming and Hatch Assembly
    4:38 Cutting the Sectional
    6:03 Epoxy Fill Coats and Leak Tests
    6:51 Final Sanding and Hull Fairing
    7:29 Varnish and Paint Application
    Most footage is from a GoPro, ultimately sped-up between 10-160X.

ความคิดเห็น • 20