Operations Layout: Assembly Line Balancing II

แชร์
ฝัง
  • เผยแพร่เมื่อ 21 พ.ย. 2024

ความคิดเห็น • 11

  • @sangeeeeeyy3964
    @sangeeeeeyy3964 10 หลายเดือนก่อน +3

    Thank you helped a lot !

  • @MindBeliever
    @MindBeliever 2 ปีที่แล้ว +2

    Thanks sir👍

  • @Ryan-wr8fx
    @Ryan-wr8fx 11 หลายเดือนก่อน

    If we have a task time greater than the takt cycle time what would we do? Would we just have two stations performing that task?

    • @The_Business_Doctor
      @The_Business_Doctor  9 หลายเดือนก่อน +1

      Hi Ryan, sorry the delay. That should not really happen because the task times would drive the target. For example, in this problem, the goal is to produce 5 ovens per hour and that would be based in the highest task time of 12 min. If, for example, task B took 13 min, then it would be impossible to produce 5 in an hour and the target output would have to be reduced to, say, 4 units per hour, which would result in a cycle time of 15 minutes (50 min/hour divided by 4 units per hour) and no task would exceed the cycle time.
      Hope this helps.
      Mark

  • @garvitbisht2003
    @garvitbisht2003 8 หลายเดือนก่อน +1

    👍

  • @neysara
    @neysara ปีที่แล้ว

    Why not just make each machine do all the tasks in sequence A to F for a total of 48 minutes and have only 4 machines?

    • @The_Business_Doctor
      @The_Business_Doctor  ปีที่แล้ว

      Hi Neysara. In theory, that would be great but machines are often designed to perform specific tasks with high throughput. Why does a car have to move down an assembly line where different people and machines perform different functions? What we really need is a matter replicator that can produce a complete unit at the touch of a button.