if a process is having both machine and man time combined for example process A is having man time 5 sec and machine time 15 sec in total 20 secs , man will be waiting for the 15 sec for next process
Does processing time means the time needed to produce an intermediate product or time needed to produce a finished goods, acounting recovery and losses?
Hi this video helped me a lot I just want to ask questions Is it necessary to start letter "A" as ther first task by the first station or is it dependent on what letter has the longest process time? Thank you
First you have to start with the processes who doesn't have predecessor (here it is A and B), if there are multiple such processes, then choose the one with the highest process time ( here we have selected A) and then keep going.
Hi, this video helped me a lot. Question, is there anytime when none of them are eligible? like say for instance, B was not eligible in station 2? is this possible?
do you mean, "is that possible that non of the processes that doesn't have any Predecessor?" In short, there will be one or two or even more processes that shouldn't have any predecessor while the rest of them are had it. It all depends on the case
@@AdiTV-r5o Thanks for your reply. I actually meant, if its possible to have a process that does have a predecessor to not have any "proses ready" or in other words a "feasible task". You know how you list the proses ready in station 2 for C. C has a proses ready of B and the only feasible task is B, what if B was not possible? Does this ever occur that there is no feasible task? I hope i explained myself good enough. Thanks for your help.
@@alin8387 If there are no feasible task, then if you learnt from "Project Management" course, that particular task/stasion (or whatever you want to call it) which has no feasible task, may occur on some condition. But in term of production planning and inventory control (PPIC), such case is rarely happened because what we try to find out here is the assembly line which is consider as the main process. so if theres any process/step which has no feasible task, wouldn't be count in this term. it depends on what are you going to do from such case. Well I'll make it easy.. the case that you've been asking, are happening in real situation, but depends on what are you trying to observe, it may be count or not.
Can I ask let think in reality. The first product will need 400 seconds cuz each station needed waiting for the precedent ones to start working. From the 2nd product, every 100 seconds there will be a product go out of the assembly line. Therefore, we cannot meet the desired output per day (Cuz 400 seconds instead of 100 seconds for the first product each day). Am I wrong?
I understood this very well after watching your video,,,thank u very much
Thank you so much for the video it helped me a lot ❤ kudos to you keep it up!!!!❤
great teaching bro
crystal clear❤
great video. thank you
Amazing!
daghang salamat = terimah kasih
many thanks from philippines, professor! you helped me out with my thesis.
you're awesome, sir!!!
Thank you dude
Sangat membantu, thanks a lot!
if a process is having both machine and man time combined for example process A is having man time 5 sec and machine time 15 sec in total 20 secs , man will be waiting for the 15 sec for next process
yes, because the man could only waits when he/she are idle or not operated
Does processing time means the time needed to produce an intermediate product or time needed to produce a finished goods, acounting recovery and losses?
God bless you greatly
thank you brother
Thanks, boss.
Thanks🎗
Hi this video helped me a lot
I just want to ask questions
Is it necessary to start letter "A" as ther first task by the first station or is it dependent on what letter has the longest process time?
Thank you
First you have to start with the processes who doesn't have predecessor (here it is A and B), if there are multiple such processes, then choose the one with the highest process time ( here we have selected A) and then keep going.
120 units in a 40 hour - week
How to calculate this?
Why u were cutting the 90 sec of idle time ?and how did u get 30 idle time for F?
nice explanation
Hi, this video helped me a lot. Question, is there anytime when none of them are eligible? like say for instance, B was not eligible in station 2? is this possible?
do you mean, "is that possible that non of the processes that doesn't have any Predecessor?"
In short, there will be one or two or even more processes that shouldn't have any predecessor while the rest of them are had it. It all depends on the case
@@AdiTV-r5o Thanks for your reply. I actually meant, if its possible to have a process that does have a predecessor to not have any "proses ready" or in other words a "feasible task". You know how you list the proses ready in station 2 for C. C has a proses ready of B and the only feasible task is B, what if B was not possible? Does this ever occur that there is no feasible task? I hope i explained myself good enough. Thanks for your help.
@@alin8387 If there are no feasible task, then if you learnt from "Project Management" course, that particular task/stasion (or whatever you want to call it) which has no feasible task, may occur on some condition. But in term of production planning and inventory control (PPIC), such case is rarely happened because what we try to find out here is the assembly line which is consider as the main process. so if theres any process/step which has no feasible task, wouldn't be count in this term. it depends on what are you going to do from such case.
Well I'll make it easy.. the case that you've been asking, are happening in real situation, but depends on what are you trying to observe, it may be count or not.
Txn sir
Can I ask let think in reality. The first product will need 400 seconds cuz each station needed waiting for the precedent ones to start working. From the 2nd product, every 100 seconds there will be a product go out of the assembly line. Therefore, we cannot meet the desired output per day (Cuz 400 seconds instead of 100 seconds for the first product each day). Am I wrong?
thank you
Good explanation
very informative. thank you :)
Nice , I need ur social media accounts?
Why workstation is total have taken 4
it's on the 3rd step, you must determine it by dividing the process time with cycle time. its on 05:36
3.9 is decimal number workstation can't be fraction that is why 4 is written
36000? bukan 3600?
open na noor
are you getting it what are you saying... plzz do try something else i m sure this is not your area of interest.