Seaboard Central - Realistic Switch List

แชร์
ฝัง
  • เผยแพร่เมื่อ 29 ม.ค. 2025

ความคิดเห็น • 85

  • @osscouter
    @osscouter 9 หลายเดือนก่อน +3

    Tim, what you make look simple is really a reflection of your years of dedication and experience. It's 'simple' when you've put in the effort to make it a habit. Modelers who are new to the hobby would be well advised to follow the steps you lay out if their goal is to reflect prototypical operations. Thanks for taking the time to share with us.

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน

      Thank you very much. I really appreciate it.

  • @garynugent4400
    @garynugent4400 9 หลายเดือนก่อน +3

    Well..... there you have it folks, from the man himself! What a true real as you can get, simple switch list. WOW. Just WOW!!! I watched his hand jot down everything and understood it the entire way! Only true real road experience on that switch list! Well done sir! Excellent video! See ya next week!!! - Gary.

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน +1

      Thanks Gary! Stay tuned. A lot more coming on the way.

  • @hangarflying
    @hangarflying 10 วันที่ผ่านมา +1

    That bag you have is almost identical to the kind of bags we used to use at the airlines to carry all of our enroute and approach charts before they digitized everything onto an iPad.

    • @SeaboardCentral
      @SeaboardCentral  8 วันที่ผ่านมา

      Yes it’s pretty much the same here but now all of our rule books and timetables are on an iPhone that they call a mobile reporting device. A conductor can use it to get train reporting info and also make switch moves or show cars placed or pulled from an industry. As an engineer I wish they gave us an iPad though. It would be a lot easier for us. When I visited Italy I noticed the high speed passenger engineers had an iPad type device.

  • @jeffwhite3679
    @jeffwhite3679 9 หลายเดือนก่อน +3

    That brought back memories. I operated almost every week on a friends large layout. He was a retired railroader, Big Four, Penn Central and Conrail. I'd pull the rain past at walking speed while he made the switch list. He past away about 18 months ago. I still use switch lists like he taught me on my layout. Great video.

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน

      Thanks! Sometimes the old ways are the best ways to

  • @stevenallen9613
    @stevenallen9613 9 หลายเดือนก่อน +3

    Tim,
    I've participated in a number of op sessions, mainly using the track cards. This totally simplifies the process and makes it much easier to understand and implement.
    In the real world, when you're switching industries, what do use to familiarize yourself with their locations, and what switch(es) are to be used to access the facility, especially when you're in an urhan setting with multiple industries, sidings, and switches. Thanks, Steve

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน +2

      Thanks! Industries are identified by an alpha-numeric class code. New hires have to train each job assignment on their territory before they mark up for duty. This helps them to familiarize with each location. Often new conductor trainees can train for up to six months on the mainline and on locals. In the event they catch a job off the extra board after they mark up and never went to the industry while they were training, the engineer on the job can job brief about the details or they can get the info from the local Trainmaster’s or Yard Master on duty.

  • @cdavid8139
    @cdavid8139 3 หลายเดือนก่อน +1

    Having worked with switchlists in the 1:1 scale for decades I can attest the sample you show here is pretty much a good example of what we use. Sometimes the format might differ a bit and sometimes it might even vary depending on type of job or what you're doing. For example you might not see car kind on some lists. Some roads use a specific ROUTE code and the one I'm looking at now calls that field "BLOCK TO". Nice job.

    • @SeaboardCentral
      @SeaboardCentral  3 หลายเดือนก่อน

      Thanks! Be sure to tune into the next upcoming videos as I’ll show some in action.

  • @ThomasKlimoski
    @ThomasKlimoski 9 หลายเดือนก่อน +2

    Great video on how to make up a prototype based switch list. For me, switch lists are the way to go especially with a small switching layout.

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน

      Thanks Tom! Yes it is a lot easier for sure.

  • @25mfd
    @25mfd 9 หลายเดือนก่อน +3

    nice vid tim... and @ 5:36 WOW i had one of those types of grips also... but man i got ribbed by the older switchman because where i worked at, only guys in engine service had those types of grips... i ended up giving mine to my sister (she's an engr for METRA, the commuter rail service in chicago)

  • @darrylmiller5116
    @darrylmiller5116 9 หลายเดือนก่อน +1

    Tim, as a clerk at Inman yards we kept a stack of switch on every desk. I can remember walking ALL 16 receiving tracks at Inman the day after Christmas one year because the T/M at Birmingham sent all of his outbound trains bound for us on Christmas Eve. and noone was there to book them. Memories!

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน +1

      Sounds like a lot of fun. I bet your dogs were barking after that feasco

    • @darrylmiller5116
      @darrylmiller5116 9 หลายเดือนก่อน +1

      @@SeaboardCentral The worst part was itcwas sleating all day, wet cold and frozen.

  • @gp3829
    @gp3829 9 หลายเดือนก่อน +1

    Hi Tim, the info in this video is going to be very useful to me, for setting-up Ops. on my Layout. Thanks for posting.

  • @rogerthomas9017
    @rogerthomas9017 9 หลายเดือนก่อน +3

    Top drawer, as always. But this list was for an outbound train from Ragland to the main yard. Who would create the switch list for an inbound train? Conductor at the originating yard or not till arrival at Ragland when he/she knows which tracks are open at the industries for delivery? Would the train be pre-blocked by receiving industry at the yard or not until the Ragland arrival? Are the switch lists retained for filing somewhere or just discarded when complete. I tried lists a number of years ago, but with my simple layout, found out for me it was an unneeded extra step. A shelf at every industry complex made using plain car cards easy.

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน

      Thanks! A lot of questions I hope to address in upcoming videos. The switch list from Ragland can be used to classify the cars upon arrival into Gadsden. The conductor would give the list of his inbound train to the Yardmaster and then he would fill out where the cars need to go and give it to the yard job to classify the cars. In the case of a Carrollton local arriving back to the yard from the industries that local would have to classify their own cars and the conductor would make the decision where to put the cars. The industry would not pre block the cars but there is nothing stopping the local from making strategic moves to pre block the cars if the conductor is smart enough to think that far ahead. The switch lists are discarded after use. Keep watching and I’ll show you how this simple switch list is all you need for a shelf style layout. I have some upcoming simple operating sessions where I’ll show you how.

  • @markhayes6407
    @markhayes6407 6 หลายเดือนก่อน

    I have participated in op sessions using that very switch list and it is so much easier to use. It is nice to know it's industry standard at least coming from a locomotive engineer. Thanks. I also like your layout.

  • @cn.trainbuff3352
    @cn.trainbuff3352 9 หลายเดือนก่อน +1

    Great video as always…. Always look forward to Sunday morning videos…. Thanks again Tim

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน

      Thank you for watching!

    • @Geoff-p3d
      @Geoff-p3d 9 หลายเดือนก่อน +1

      Tim, Always enjoy your videos. This switch list video was great. My 1970s terminal railroad switching layout (Mohawk Terminal Railway) is jointly owned by the D&H and the B&M. I use a switch list based on the D&H prototype. On the proto. D&H conductors never handled way bills or made up the switch lists. A roving operator/clerk made them up and delivered them to the conductors. 2 of my crew are a retired yard master and a conductor. They are a great asset with there knowledge and stories. Keep up the great work, and for sharing with all of us who love ops! Geoff Wood

  • @RFMCabooseNP1713
    @RFMCabooseNP1713 9 หลายเดือนก่อน +1

    Learned a lot from you Tim. Keep up the good work.

  • @bssniper1975
    @bssniper1975 9 หลายเดือนก่อน +1

    Another brilliant video, loving this series of realistic operations. thanks for the information Tim.

  • @daviddeezmusic2313
    @daviddeezmusic2313 9 หลายเดือนก่อน +1

    Great video Tim! I didn't know they used MT for empty, that's a no brainer. Keep them coming!

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน +1

      Thanks! Stay tuned. More to come

    • @cdavid8139
      @cdavid8139 3 หลายเดือนก่อน

      I've seen MT or MTY. But in general all lists I've worked with in the 1:1 scale use "E" for empty. Sometimes you might see "W' for Revenue Empty.

  • @CurtBergStillLoves2PlayTrains
    @CurtBergStillLoves2PlayTrains 9 หลายเดือนก่อน +1

    Nice job! Great communicator. You also make a potentially very complicated work order very simple. Thanks for your updates. So useful for my own layout. I'm so glad you share your expertise and don't keep it to yourself!

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน

      Thanks! Keep watching. I will show a lot more ways that this simple switch list can be used.

  • @jamesnicholas7180
    @jamesnicholas7180 9 หลายเดือนก่อน +1

    Always look forward to your videos! Thanks for sharing.

  • @williamdavid9333
    @williamdavid9333 9 หลายเดือนก่อน +1

    Tim, thank you for sharing this with us.

  • @edwardstd52
    @edwardstd52 9 หลายเดือนก่อน

    As a clerk on the SOO Line in the early '70s, I remember walking the yard tracks and writing all that stuff down. In Minnesota. In the winter. In the snow. At night. 😆

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน

      Gotta be tough. That’s what I tell all new hires. See how long you last when you’re out there pounding rocks at 2am with it 36 degrees and raining.

  • @thecnwmondovilinepaulscota7304
    @thecnwmondovilinepaulscota7304 9 หลายเดือนก่อน +1

    Thanks for the clear explanation and the example switch list! I use a variant of the switch list for my switching layout, with a 20 sided dice to shake things up each session. - Paul

  • @205004gs
    @205004gs 9 หลายเดือนก่อน +1

    Thanks Tim it sure makes switching a lot easier! Great job 👏 👍

  • @Metra_90_Video_Productions
    @Metra_90_Video_Productions 9 หลายเดือนก่อน +2

    I’ve been waiting all morning

  • @crrcoal
    @crrcoal 9 หลายเดือนก่อน +1

    Excellent video Tim! I was wondering if you could make a video of the yard crew classifying the cars?

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน +1

      Thanks! Yes, there will be a lot of videos showing the cars being classified in the yard. Stay tuned.

  • @JasonTrew2018
    @JasonTrew2018 9 หลายเดือนก่อน +1

    Tim, that is good, on my Trewsville Southern, I have a switch list and I have on it cars needed to pick up and cars to drop off. It happens to be easy for me to remember since I have 7 places and they all accept one car per area

  • @jimjohnston7688
    @jimjohnston7688 9 หลายเดือนก่อน +1

    Really good video, lots of helpful information. That “grip” made me think about my grandfather. He was an engineer for the B&O back in the days of steam. I’ll bet he had one very similar. He also carried a revolver. Hopefully he never used that.

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน

      Thanks! Yes those grips were very popular when I hired on in 96. And I knew of a few old heads that were packing one. Especially when you had to work in urban areas.

  • @HartfordWhaler
    @HartfordWhaler 9 หลายเดือนก่อน +2

    Always informative. Thank you.

  • @nicksanto882
    @nicksanto882 9 หลายเดือนก่อน +1

    Superb!! Just what we uses on the 1:1 !!! Thanks for sharing, Tim!!!

  • @davestrains6816
    @davestrains6816 9 หลายเดือนก่อน +1

    Very nice video. Very interesting and thanks for sharing. Dave

  • @rogerthomas9017
    @rogerthomas9017 9 หลายเดือนก่อน

    Another thought. When the train arrives at the yard, it would enter an A/D track. Who actually classifies the cars per the list - a yard loco after receiving the list, or the incoming engineer/conductor loco (you) after moving to the other end of the train?

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน

      Really depends on the yard. Some are small and don’t have dedicated yard jobs or Yardmaster so the arriving local (if it has time) does the classification of their inbound train into outbounds. Only yards I know of that actually have dedicated A/D tracks are major classification yard terminals. All other yards simply have tracks so any available open track in the yard becomes the arrival track. Some terminals that do a lot of yard switching will have dedicated yard switch jobs that will handle all inbounds and classify the cars for their next move. I’ll be showing both scenarios in upcoming videos. For the Gadsden yard I have two dedicated yard jobs that do this work but for Carrollton the two local switchers have to handle their own classification of inbounds.

  • @jasonlewis21
    @jasonlewis21 9 หลายเดือนก่อน +1

    Great video and very helpful!

  • @mattw9667
    @mattw9667 9 หลายเดือนก่อน +1

    Thanks Tim, that was useful info.

  • @elsdp-4560
    @elsdp-4560 9 หลายเดือนก่อน +1

    Thank you for sharing.👍

  • @ronheiser3248
    @ronheiser3248 9 หลายเดือนก่อน +1

    Liked the video. Verify clear explanation of using a switch list. What program do you use for creating the industry work order?

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน

      Thanks! I’ll be showing the industry work order soon. I create it in a Word Document. Stay tuned.

  • @rickyhammond36
    @rickyhammond36 9 หลายเดือนก่อน +1

    great video Tim =]

  • @ajkleipass
    @ajkleipass 9 หลายเดือนก่อน +1

    Side note: as a modeler, I love the multi-part fans. They look super realistic. However, they also look jarringly weird just sitting there, motionless.
    Do you, as an engineer, find them just as jarring?

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน +3

      It would be cool to see one or two turning. But on the real ones not every fan turns all the time unless the engine temperature is really high.

  • @charlierumsfeld6626
    @charlierumsfeld6626 9 หลายเดือนก่อน +1

    Thank you

  • @JohnB9474
    @JohnB9474 9 หลายเดือนก่อน

    Tim, i just noticed the flashing beacon on 3010. Doesnt that indicate thats its a remote unit? I use JMRI since my handwriting looks like a doctors prescription.😊

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน +1

      Hi John. No the remotes use a pair of rapid flashing lights. Back in the 70s a lot of units had rotary beacons like the 3010 and it was used to help spot units in large rail yards from the towers.

  • @MidwestRailfan8853
    @MidwestRailfan8853 9 หลายเดือนก่อน

    What factor determines an equipped v unequipped boxcar?

    • @SeaboardCentral
      @SeaboardCentral  9 หลายเดือนก่อน

      A number of things. I did a special video on AAR Car Type codes that goes into a description. They can be found on the UMLER site. You can see the video here:
      th-cam.com/video/6K2lSQRXR4Q/w-d-xo.htmlsi=DMDPF3X0qssEfuU3

  • @trainzrailoperations2670
    @trainzrailoperations2670 9 หลายเดือนก่อน +1

    Brilliant !!

  • @patrickhalsey4000
    @patrickhalsey4000 9 หลายเดือนก่อน +1

    good vid, thanks