Low Voltage Cable Capacity, Sizing & Protection against Electric Shock

แชร์
ฝัง
  • เผยแพร่เมื่อ 25 ธ.ค. 2024

ความคิดเห็น •

  • @Camerados
    @Camerados 2 ปีที่แล้ว +1

    Great explanation 👍👍

    • @ETAPsoftware
      @ETAPsoftware  2 ปีที่แล้ว

      Thank you for your interest in ETAP Software and your positive feedback.

  • @manojillangasooriya3590
    @manojillangasooriya3590 2 ปีที่แล้ว

    This has all I want. Thank you so much.

    • @ETAPsoftware
      @ETAPsoftware  2 ปีที่แล้ว

      Great, than you for your positive feedback and your interest in ETAP software.

  • @abduljabbar-rc9bx
    @abduljabbar-rc9bx 3 ปีที่แล้ว +1

    hi ,is very very useful thanks

  • @richardemery6690
    @richardemery6690 ปีที่แล้ว

    That was informative but that made cable design to BS7671 seem very complex and difficult! If I’d seen this before buying the license I would certainly have looked at other providers!

  • @xyholland
    @xyholland 6 ปีที่แล้ว

    Hi, thanks for the video. I have a problem that I can not connect the load to teh panel. And also after I make the configuration fo the panel and press OK, I re-doubleclick on the panel and all information is gone. Can you please help ?

    • @ETAPsoftware
      @ETAPsoftware  5 ปีที่แล้ว

      Please log into our HelpDesk and post your question or view our FAQs. Alternatively please contact our local office you can can find the contact info on our website.

  • @xyholland
    @xyholland 5 ปีที่แล้ว

    IS THIS A BUG?
    Hi, thanks for the video. I have a load of 310 A. My cable capacity is 318A. And Circuit breaker is 400A. The cable capacity should be more than 400A I think.
    At load flow analysis ETAP shows no alert for this. Even when I make CB 630A, it doesnt give any alerts. Is this a bug ?

    • @ETAPsoftware
      @ETAPsoftware  5 ปีที่แล้ว

      Thank you for you interest in ETAP Software. I forward your question to one of our engineers to respond. In the meantime, you can access our HelpDesk 24/7 for more information.

    • @jeremypangilinan748
      @jeremypangilinan748 5 ปีที่แล้ว

      Hi Xy Holland. The alerts are based on the marginal and critical percentages you set in the study case editor for load flow.

  • @melvintata
    @melvintata 8 ปีที่แล้ว

    Hi. Thank you very much for this video. This is very informative. I'd like to ask if you have other videos that explore the LV analysis of ETAP. I hope to hear from you soon. Thanks