Building and setting my modular home

แชร์
ฝัง
  • เผยแพร่เมื่อ 14 ธ.ค. 2021
  • Building the foundation and setting our R-anell handcock modular home. The built the foundation and about a month later brought the pieces out. A few days after bringing them out they took only a day to set on the foundation

ความคิดเห็น • 14

  • @aaronymousunlimited2661
    @aaronymousunlimited2661 2 ปีที่แล้ว +1

    Cool video. Such a niche market. Cinematography is great. Look forward to the housewarming video.

    • @keithrivers7468
      @keithrivers7468  2 ปีที่แล้ว +1

      Thanks. I’m definitely not good at it. It’s just me and my iPhone lol

  • @lewis19701
    @lewis19701 3 หลายเดือนก่อน +2

    Would be nice to see update on finished home and lawn etc.

    • @keithrivers7468
      @keithrivers7468  หลายเดือนก่อน

      I may try to do something soon. Thanks

  • @pedropereira8924
    @pedropereira8924 หลายเดือนก่อน +1

    Thanks for sharing, I’m inquiring for 3 bedroom 2 bath whit unfinished 2nd floor

  • @HughAllison
    @HughAllison 2 ปีที่แล้ว +1

    Thank you for sharing this. I am a couple of weeks away from them setting my R-Anell home. If you don’t mind can I ask you how many square feet your home is? I have the 912 roof as well with the unfinished upstairs. How long ago did you order the home? Thank you.

    • @keithrivers7468
      @keithrivers7468  2 ปีที่แล้ว

      I also have the unfinished upstairs. The lower floor is 1950 sqft. We closed on the construction loan in June 2021. It’s now Jan 22 and we are about to weeks from done. They started working on the foundation in early November 22, and the main pieces were delivered to the property the weekend after thanksgiving

  • @christinefrazzini7535
    @christinefrazzini7535 4 หลายเดือนก่อน

    Did you have to hire all these guys on your own, or is this part of the company from whom you purchased your home?

    • @keithrivers7468
      @keithrivers7468  3 หลายเดือนก่อน

      Everything was arranged through the company that sells the home except for well and septic tank

  • @pedropereira8924
    @pedropereira8924 หลายเดือนก่อน

    How much per sq ft?

    • @keithrivers7468
      @keithrivers7468  หลายเดือนก่อน

      It’s 1950spft finished and we paid around 240k so comes up around $123/spft

  • @ThePrime206
    @ThePrime206 15 วันที่ผ่านมา

    Do I have a question to ask where the two sections meet how does that Halo space in between the walls of the two sections get filled are they insulated in between the house space and what about underneath what keeps rodents and mice and bugs and things like that from crawling up between the two sections of the home

    • @keithrivers7468
      @keithrivers7468  14 วันที่ผ่านมา

      Where the two halves meet it’s not insulated, but it is sealed off with plywood on both halves. The walls on the inside of the house where the two halves meet are double walls with plywood between them

    • @ThePrime206
      @ThePrime206 13 วันที่ผ่านมา

      @@keithrivers7468 what about underneath where the two sections join Carrie what keeps Critters and things like that from crawling up between the two halves of the sections and can those be insulated