Work Performance Data, Information, & Report: Master the Differences in 10 Minutes for your PMP Exam

แชร์
ฝัง
  • เผยแพร่เมื่อ 4 ส.ค. 2024
  • If you ask PMP aspirants to choose one concept that’s confusing, I am sure most of them will choose the difference between WPD, WPI and WPR as one of the concepts. In this video, our lead trainer and Project Management Mentor Gautham Sudakar dives deep into the world of work performance data (WPD), work performance information (WPI), and work performance reports (WPR).
    Learn the key differences between these concepts and how they impact project management.
    We'll walk you through a practical example, showcasing how data is collected, transformed into information, and finally presented in a report to stakeholders. This step-by-step process will help you better understand how to effectively manage and communicate project progress.
    📝 Timestamps:
    🕒 00:00 - Introduction
    🕒 01:18 - Work Performance Data (WPD) Explained - Work Performance Data (WPD) is the raw data collected from various project areas, such as planned and actual performance, budget, and status.
     Data collection is crucial for effective project management.
     Examples include: hours worked, tasks completed, and resources used.
    Practical Example -Gautham walks through a detailed, real-life example to demonstrate the transition from WPD to WPI and finally to WPR. This example helps viewers visualize how these concepts apply to real projects and the importance of each step in the process.
    🕒 05:25 - Work Performance Information (WPI) Explained - Work Performance Information (WPI) is the result of analyzing and comparing the collected work performance data.
     This step involves identifying variances, trends, and potential issues in the project.
     Examples include: schedule variance, cost variance, and overall project progress.
    🕒 07:35 - Work Performance Reports (WPR) Explained - Work Performance Reports (WPR) are the presentations or documents that contain work performance information, formatted for easy consumption by stakeholders.
     This is the final step in effectively communicating project performance.
     Examples include: project status reports, project dashboards, and variance analysis reports.
    🕒 08:23 - Interactive Test -The test at the end of the video allows viewers to apply their knowledge of WPD, WPI, and WPR. Here is a list of items as promised in the video
     Number of defects found.
     Finish dates of activities
     Deliverable status.
     Number of change request completed.
     Implementation status of change request.
     Status reports representing implementation status of change request.
     Electronic dashboard representing deliverable status.
    Please segregate these items in WPD, WPI, and WPR and make sure you give your reasoning behind the answer in comments section below, where Gautham will personally respond to submissions.
    🕒 9:02 - Conclusion
    Don't miss the test at the end of the video! This interactive challenge will help you validate your understanding of these concepts. Grab your notepad, and let's get started! Be sure to leave your answers in the comments section, and Gautham will personally respond to your submissions.
    Join us on this educational journey, and solve your work performance data, information, and report related PMP Questions easily! Happy learning, and don't forget to like, share, and subscribe the EduHubspot Channel for more project management insights!
    For any queries, reach out to Gautham at Gautham.sudakar@eduhubspot.com
    Connect with me on LinkedIn directly : / gautham-sudakar-pmp%c2...
    Visit our website www.eduhubspot.com today and discover how the PMP Mindset tool can help you achieve greater success in your career!
    Do check out our PMI Approved PMP Program at:
    www.eduhubspot.com/packages/pmp
    Also, you can email our support team for more questions at services@eduhubspot.com
    Connect with us on WhatsApp: wa.me/message/XVI7DMTEACX7L1
    Subscribe to our TH-cam Channel: goo.gl/2ZjpEq

ความคิดเห็น • 166

  • @SubhankarDey-mr9um
    @SubhankarDey-mr9um 3 หลายเดือนก่อน

    You have made it so easy. thanks Gautam.

    • @EduHubSpot
      @EduHubSpot  3 หลายเดือนก่อน

      Thanks for liking !
      Gautham

  • @crispingeorge2502
    @crispingeorge2502 ปีที่แล้ว +1

    Hi Gautham,
    Grateful for taking your time to explain this concept.
    Q(1,2 &4) refer to work performance data; since they are talking about raw observations/measurements.
    Q(3&5) refer to work performance information; status of WPD being performed.
    Q(6&7) refer to work performance report; physical or electronic representation of WPI.
    Regards

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว +1

      Loving your thought process.
      Gautham

  • @mohitmhatre5021
    @mohitmhatre5021 5 หลายเดือนก่อน

    Excellent!

    • @EduHubSpot
      @EduHubSpot  5 หลายเดือนก่อน

      Glad you liked it!
      Gautham

  • @pushpafire2715
    @pushpafire2715 ปีที่แล้ว

    Thank you gautham...

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Your Most Welcome Satish !!
      Gautham

  • @priyankaali06
    @priyankaali06 10 หลายเดือนก่อน

    Thanks a lot gautam for this

    • @EduHubSpot
      @EduHubSpot  10 หลายเดือนก่อน

      I am glad you loved my video.
      Gautham

  • @krishnar.p1966
    @krishnar.p1966 7 หลายเดือนก่อน

    Hi Gautham, It is very interesting to listen to your videos and iassume it will stay in our mind forever. Thanks.
    WPD - collecting on plan and execution, it should be raw observation (1,2,4)
    WPI - it is comparing and finding actual progress, it should be some status, here deliverable and implementatation "status" (3, 5)
    WPR - It is a representation of the WPI, here representation of "deliverable and implementatation "status"" (6,7)

    • @EduHubSpot
      @EduHubSpot  7 หลายเดือนก่อน +3

      Loving your thought process. Gautham

  • @sameershaikh-km3xr
    @sameershaikh-km3xr 5 หลายเดือนก่อน

    Very Good Explained with Examples!!! 1,2,4 is WPD. And 3,5 is WPI and 6,7 are WPR

    • @EduHubSpot
      @EduHubSpot  5 หลายเดือนก่อน

      Very impressive!! Gautham

  • @tejeswararaobudumuru9206
    @tejeswararaobudumuru9206 ปีที่แล้ว +3

    Hi Gautham,
    Item-1: WPD. It's just actual data and there will never be planned defects to compare the actual defects.
    Item-2: WPD. It's just finish dates of activities . If we compare actual finish dates with planned finish dates, we can know the project status.
    Item-3: WPI. It provides the project status.
    Item-4: WPD. It's just data. It won't provide the project status.
    Item-5: WPI: It derives from planned vs actual and can provide the project status
    Item-6 &7: WPR: They are representations of project status

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Really loved your thought process. I need to steal this reasoning. Hahah !!
      Gautham

    • @jpsinghditp
      @jpsinghditp 2 หลายเดือนก่อน

      @@EduHubSpot @tejeswararaobudumuru9206 Awesome explaination

  • @ilanchezian822
    @ilanchezian822 5 หลายเดือนก่อน

    Excellent

    • @EduHubSpot
      @EduHubSpot  5 หลายเดือนก่อน

      Thank you so much 😀
      Gautham

  • @kafilahmad
    @kafilahmad 8 หลายเดือนก่อน

    Thank you

    • @EduHubSpot
      @EduHubSpot  8 หลายเดือนก่อน

      You're welcome !!
      Gautham

  • @gajasen
    @gajasen ปีที่แล้ว

    @Gautham I loved the way you explained this concept. It would stay fresh in my mind.
    Work Performance Data :
    Number of defects found,
    finish dates of activities,
    as these are the raw information.
    Work Performance Information -
    Deliverable Status,
    No. of change request completed
    Implementation status of change request
    This information is derived by comparing the actual vs planned and hence it helps in arriving at the status of the project.
    Work Performance Report :
    Status reports representing implementation status of change request.
    Electronic dashboard representing deliverable status.
    These are the electronic representation of the information for quick presentation to the leadership team.

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Loving your thought process. Gautham

  • @harishankar4005
    @harishankar4005 ปีที่แล้ว

    Well explained concept and so nicely done with an example. Nice one Gautham. As for answers,
    1)Defects = WPD = These are defect numbers found and actuals "collected" (collect is the key word
    2)Finish dates = WPD = Raw data with collection of dates .
    3)Deliverable status = WPI = this is comparing the actual vs planned and according will give the deliverable status whether we are ahead or behind schedule etc.
    4)# of CR's completed = WPD = these are numbers for the actuals completed and no comparison
    5)Status of CR = WPI = Status means comparing current vs planned data and hence WPI
    6) & 7 ) WPR = The name itself says reporting and Electornic representation so self explanatory

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Loving your thought process.
      Gautham

  • @keralguy
    @keralguy 16 วันที่ผ่านมา

    Hi Gautham,
    Thanks for the wonderful explanation, and I have understood the concept well in about 15 minutes.
    Qn (1,2 &4) refer to Work Performance Data since they are talking about Data Collection, collecting Plans and Actuals
    Qn (3&5) refer to Work Performance Information as they are comparing Plan vs Actual progress.
    Qn (6&7) refer to Work Performance Report as they are electronic representation of Work Performance Information
    Thank You once again
    With Regards
    Riyad

    • @EduHubSpot
      @EduHubSpot  12 วันที่ผ่านมา

      That is exactly how you should think.
      Gautham

  • @user-nt8ww1mu2q
    @user-nt8ww1mu2q ปีที่แล้ว +1

    Hi, Gautham, concept was explained very well, and you rocked as always with your real-life example explanation. thanks
     A number of defects were found. -WPD
     Finish dates of activities -WPD
     Deliverable status. -WPI
     A number of change requests were completed. -WPD
     Implementation status of a change request. -WPI
     Status reports represent the implementation status of change requests. -WPR
     Electronic dashboard representing deliverable status. -WPR

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Thanks Vasundhara for lovely comment.
      7 out of 7, very impressive !!
      Gautham

  • @SaurabhGupta-fl1vp
    @SaurabhGupta-fl1vp 3 หลายเดือนก่อน +1

    Great Explanation:
     Number of defects found. -- WPD -- Raw data
     Finish dates of activities -- WPD -- Raw data
     Deliverable status. -- WPI -- compared status
     Number of change request completed. -- WPD -- Raw data
     Implementation status of change request. -- WPI -- compared status
     Status reports representing implementation status of change request. -- WPR -- Report
     Electronic dashboard representing deliverable status. -- WPR -- Report

    • @EduHubSpot
      @EduHubSpot  3 หลายเดือนก่อน

      Very Impressive !!
      Gautham

  • @priyankar3532
    @priyankar3532 8 หลายเดือนก่อน

    Smashing the like 🎉

    • @EduHubSpot
      @EduHubSpot  7 หลายเดือนก่อน

      Thanks for loving the video.
      Gautham

  • @PradyDas
    @PradyDas ปีที่แล้ว

    Hi Gautham, thanks again for such a wonderfully explained video.
    Work Performance Data: Number of Defects Found, Finish Date of Activities, Number of Change Request Completed.
    Reasoning : These are Raw data and does not convey any status of the project on their own.
    Work Performance Information: Deliverable Status and Implementation Status of Change Request
    Reasoning: These signify some sort of status about the project which is derived by comparing raw project data
    Work Performance Reports: Status Reports representing Implementation Status of Change Request and Electronic Dashboard representing Deliverable Status
    Reasoning: These are electronic representation of the Work performance Information and hence these are Work Performance Reports.

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Really loved your thought process. I need to steal this reasoning. Hahah !! Gautham

  • @ruwanthiharshanie7761
    @ruwanthiharshanie7761 ปีที่แล้ว +1

    Hi Gautham,
    Work Performance Data: These are row data which can be used for decision making;
    1. Number of defects found, (This can be compared with estimated number of defects to come up with useful WPI)
    2. finish dates of activities, ( This can be compared with planned finish dates of activities to come up with useful WPI)
    4. Number of change requests completed ( This can be compared with number of change requests planned to complete, to come up with useful WPI)
    Work Performance Information: These are found after processing the data; comparing planned and actual data
    3. Deliverable Status, (whether the delivery is complete or delayed or whatever the current status can only be determined with comparing the planned and actual progress data)
    5. Implementation Status ( this also can be determined with comparing planned and actual progress data)
    Work Performance Reports:This is the presentable format of the information on status
    6. Status reports representing implementation status of change request,
    7. Electronic dashboard representing deliverable status

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Really loved your thought process. I need to steal this reasoning. Hahah !!
      Gautham

  • @damanpreetsyber6668
    @damanpreetsyber6668 ปีที่แล้ว

    Hi Gautham,
    very well explained.
    Numbers of Defects Found : is a work performance DATA.
    Finish Dates of Activities : is a work performance data.
    Deliverable Status :- is a work performance information
    Number of change request completed : Data
    Implementation status of change request : Information
    Status report representing implementation status of change request : Report
    Electronic Dashboard representing deliverable status : Report.

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Keep up the good work!!
      Gautham

  • @poojanewar2912
    @poojanewar2912 ปีที่แล้ว

    Hi Gautham, The concept is very well explained.
    Work Performance Data: 1, 2, 4 as these just represent the data and we cannot arrive at the status of the project
    Work Performance Information: 3, 5 as these represent the project status
    Work Performance Report: 6, 7 as these are the reports

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Awesome job!!
      Gautham

  • @ajithkumaraj2516
    @ajithkumaraj2516 2 หลายเดือนก่อน

    Superb!! Thanks for the excellent well presented explanation with samples. No books or notes needed anymore. Sorry over confident and happy after listening to the video...
    Kindly review and let me know your feedback...
     Number of defects found. - WPD - Collecting Actual Raw Data
     Finish dates of activities - WPD - Collecting Actual Progress - Raw Data
     Deliverable status. - WPI - Comparing Data
     Number of change request completed. - WPD - Collecting Actual Raw Data
     Implementation status of change request. - WPI - Comparing Data
     Status reports representing implementation status of change request. - WPR - Report presentation based on WPI
     Electronic dashboard representing deliverable status. - WPR - Electronic Representation of WPI

    • @EduHubSpot
      @EduHubSpot  2 หลายเดือนก่อน

      Very impressive!!
      Gautham

  • @Theresa-wr8hc
    @Theresa-wr8hc ปีที่แล้ว +1

    Hi Gautham, I really loved the explanation. thanks
    #defects -WPD
    Finish dates - WPD
    Delivery status - WPI
    #change request - WPD
    Implem status - WPI
    Status rpt rep imple status - WPR
    Electronic Dash - WPR

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Glad you liked it, Theresa. Your answers are correct!. Great job
      Gautham

  • @narawseedagaj
    @narawseedagaj ปีที่แล้ว

    Implementation status of change request - WPI , comparing with Plan on number of change request implemented so far

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Very impressive!!
      Gautham

  • @sharmilapratap343
    @sharmilapratap343 19 วันที่ผ่านมา

    Thank you Gautam for making it so simple and easy. So for me:
     Number of defects found = WPD as it will be just actual data of defects
     Finish dates of activities = Again WPD, where later we can use this information for comparison.
     Deliverable status. = WPI as it gives project status
     Number of change request completed. = WPD
     Implementation status of change request.= WPI as we can compare
     Status reports representing implementation status of change request. WPR = Presentation of status report
     Electronic dashboard representing deliverable status. WPR = Electronic representation

    • @EduHubSpot
      @EduHubSpot  16 วันที่ผ่านมา

      Loving your thought process.
      Gautham

  • @azabohassan9593
    @azabohassan9593 ปีที่แล้ว

    1,4and 5 are wpi cos defects found are after implementation of raw data,no.of change request completed and implementation status of changes request are due to a result of implantation of wpd.
    Finish date and deliverables status are the wpd what's to be implemented
    Last two are report of what is implemented so that its easier for one to understand in simple way than many words.

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Correct Answers :
      1. Number of defects found - WPD
      2. Finish dates of activities - WPD
      3. Deliverable status - WPI
      4. Number of change request completed - WPD
      5. Implementation status of change request - WPI
      6. Status reports representing implementation status of change request - WPR
      7. Electronic dashboard representing deliverable status - WPR
      Gautham

  • @narawseedagaj
    @narawseedagaj ปีที่แล้ว

    First two are the WPD - no of defects and finish date are collected data

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Awesome job!!
      Gautham

  • @manishashetty7965
    @manishashetty7965 20 วันที่ผ่านมา

    Thank you Gautam,
    WPD - Raw Data collecting plan & actual progress
     Number of defects found. = WPD
     Finish dates of activities = WPD
     Implementation status of change request = WPD
    WPI Comparing plan and Actual progress
     Deliverable status. = WPI
     Number of change request completed. = WPI
    WPI gathered and presented through Electronic Representation - WPR
     Status reports representing implementation status of change request = WPR
     Electronic dashboard representing deliverable status= WPR

    • @EduHubSpot
      @EduHubSpot  16 วันที่ผ่านมา

      Very impressive!!
      Gautham

  • @DeyDiscoveries
    @DeyDiscoveries ปีที่แล้ว

    Implementation of change request-WPI

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Keep up the good work!!
      Gautham

  • @savitachetan12
    @savitachetan12 ปีที่แล้ว

    Hi Gautham,
    Work Performance Data: 1, 2, 4 give data of planned or actual
    Work Performance Information: 3, 5 give compared result of the data I:e status information
    Work Performance Report: 6, 7 these are dashboard representation of information .

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Very impressive!!
      Gautham

  • @narawseedagaj
    @narawseedagaj ปีที่แล้ว

    Deliverable status - WPI , compared with plan and actual

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Great job!!
      Gautham

  • @arbendodajarben6923
    @arbendodajarben6923 ปีที่แล้ว

    from no.1 to no.5 are WPD, because are collecting informations and there are not comparing to anything. No.5 is WPI-1 , because compare one ork performance called "implementaion status of change request". No.6 is WPD- because collect the status of deliverable.

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Correct Answers :
      1. Number of defects found - WPD
      2. Finish dates of activities - WPD
      3. Deliverable status - WPI
      4. Number of change request completed - WPD
      5. Implementation status of change request - WPI
      6. Status reports representing implementation status of change request - WPR
      7. Electronic dashboard representing deliverable status - WPR
      Gautham

  • @nehapashiney4045
    @nehapashiney4045 2 หลายเดือนก่อน

    Perfectly explained.... @Gautham.....Thank you
     Number of defects found - WPD
     Finish dates of activities - WPD
     Deliverable status - WPI
     Number of change request completed - WPD
     Implementation status of change request - WPI
     Status reports representing implementation status of change request - WPR
     Electronic dashboard representing deliverable status - WPR

    • @EduHubSpot
      @EduHubSpot  2 หลายเดือนก่อน

      That is exactly how you should think. Gautham

  • @pamelaakothondiek3812
    @pamelaakothondiek3812 ปีที่แล้ว

    1.Number of defects found is work performance information; 2. Finish dates of activity is work performance data as it is what will be used during progress and reporting; 3. Deliverable status is work information; 4. Number of change request completed is work performance report; 5. implementation status of the change request is work performance information; 6. status report representing implementation status of change request is a work performance report because it is electronically represented; 7. Electronic dashboard representing deliverable status is a work performance report because it is electronically represented.

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Correct Answers :
      1. Number of defects found - WPD
      Gautham

  • @ajoydas9863
    @ajoydas9863 5 หลายเดือนก่อน

    HI GAUTHAM ; Work performance data: 1,2,4
    work performance information: 3,5
    work performance report : 6,7

    • @EduHubSpot
      @EduHubSpot  5 หลายเดือนก่อน

      Very Impressive !!
      Gautham

  • @naveengs1417
    @naveengs1417 10 หลายเดือนก่อน

    Hi Gautham
    Number of Defects Found
    This is WP Data because - its represents the collection.
    Finish Dates of Activities
    This is WP Data as again its collection of data
    Deliverable Status
    This is WP Information - Status represents - we can compared Plan vs Actuals
    Number of Change request completed
    This is WP Data - represents collection of data
    Implementation status of change request
    This is WP Information - Status always shows Planned vs Actual
    Status reports representing Implementation status of change request
    This is WP Reports - Status reports is keyword here to call it as WPR
    Electronic Dashboard representing Deliverable status
    This is WP Reports - Electronic data representation is example of WPR
    thank you

    • @EduHubSpot
      @EduHubSpot  10 หลายเดือนก่อน

      Loving your thought process. Gautham

  • @DeyDiscoveries
    @DeyDiscoveries ปีที่แล้ว

    Number of change request completed-WPI

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Correct Answer :
      4. Number of change request completed - WPD
      Gautham

  • @narawseedagaj
    @narawseedagaj ปีที่แล้ว

    Last two are WPR - because status report and electronic report are the key words

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      That is exactly how you should think.
      Gautham

  • @santoshpanda9762
    @santoshpanda9762 ปีที่แล้ว

    WPD- 1,2,3,4- All these are Raw observations, WPI-5,6- It is Status ( Comparison between Plan & Actual) WPR-7- Which is a electronic representation of Status Information
    The terms are well explained in a simple words

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Correct Answers :
      1. Number of defects found - WPD
      2. Finish dates of activities - WPD
      3. Deliverable status - WPI
      4. Number of change request completed - WPD
      5. Implementation status of change request - WPI
      6. Status reports representing implementation status of change request - WPR
      7. Electronic dashboard representing deliverable status - WPR
      Gautham

  • @narawseedagaj
    @narawseedagaj ปีที่แล้ว

    Number of change request completed - WPD , actual number change request collected

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Keep up the good work!!
      Gautham

  • @mailtoaravindan
    @mailtoaravindan 6 หลายเดือนก่อน

    Hi Gautham, As always, great explanation... My answers below...
    WPD - 1,2,4 (All three involves collecting raw data)
    WPI - 3,5 (Status update is Information)
    WPR - 6,7 (Representing the status is report)

    • @EduHubSpot
      @EduHubSpot  6 หลายเดือนก่อน

      Very Impressive !!
      Gautham

  • @vidyasagarpinapa7713
    @vidyasagarpinapa7713 ปีที่แล้ว

    First three statements are work performance data,and next two statements are work performance information and last two statements are work performance reports.

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Correct Answers :
      1. Number of defects found - WPD
      2. Finish dates of activities - WPD
      3. Deliverable status - WPI
      4. Number of change request completed - WPD
      5. Implementation status of change request - WPI
      6. Status reports representing implementation status of change request - WPR
      7. Electronic dashboard representing deliverable status - WPR
      Gautham

  • @ashrutisaxena8725
    @ashrutisaxena8725 ปีที่แล้ว

    WPD- 1,2,4 as they represent raw data
    WPI- 3,5 are WPI as they are comparing the status
    WPR: 6,7

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Very impressive!!
      Gautham

  • @AlokKumar-li6jz
    @AlokKumar-li6jz ปีที่แล้ว

    Hi Gautham below are the answers with explanation:
    1,2,4 are WPD here data is collected in the form of number, dates as we are collecting actual progress
    3,5 is WPI as we are getting the progress through status
    6,7 is WPR over here representation of work performance information

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Very impressive!!
      Gautham

  • @shivaniyadav2896
    @shivaniyadav2896 ปีที่แล้ว

    1 & 2 : WPD as thry are raw data
    3, 4 & 5 : WPI as they are statuses of raw data turned into information
    6 & 7 : WPR as they are representations to stakeholder(s) after calculation

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Correct Answers :
      1. Number of defects found - WPD
      2. Finish dates of activities - WPD
      3. Deliverable status - WPI
      4. Number of change request completed - WPD
      5. Implementation status of change request - WPI
      6. Status reports representing implementation status of change request - WPR
      7. Electronic dashboard representing deliverable status - WPR
      Gautham

  • @jagdishpurohit928
    @jagdishpurohit928 ปีที่แล้ว +1

    Hi Gautham, well explained; short & simple....
    WPD(Data)-1, 2, 4
    WPI(Status)- 3 , 5
    WPR(Reports/Electronic version)-6,7

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Fantastic job Jagdish
      Regards,
      Gautham

  • @gayatrimarathe999
    @gayatrimarathe999 7 หลายเดือนก่อน

    Mayuresh Kotwal -
    WP Data
    Number of defects found - this is gathering data
    Finish date of activities - this is checking either planned or actual
    Number of change request completed
    WP Information
    Deliverable status - this is information as after comparing the planned and actual we will understand the status
    Implementation status of CR - this will be derived based on the comparison
    Status reports representing implementation status of CR - well, this is confusing but as electronic representation is not done, this should be under information
    WP Report
    Electronic Dashboard representing deliverable status - this is ELECTRONICALLY representing the status hence should be under report

    • @EduHubSpot
      @EduHubSpot  7 หลายเดือนก่อน

      Status reports representing implementation status of change request - WPR
      Gautham

  • @aditibhargava8307
    @aditibhargava8307 ปีที่แล้ว

    WPD - 1, 2 and 4 they ar raw data on number of defects and dates
    WPI - 3 and 5 . They speak of status
    WPR - Last two as they show reports

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว +1

      Keep up the good work!!
      Gautham

    • @samsonolufemiajayi650
      @samsonolufemiajayi650 ปีที่แล้ว +1

      Number 1,2,4-WPD - raw data
      Number 3and 5-WPI. _deliverable status NUMBER 6and 7-WPR _electronic representation of WPI

    • @ketansoni8246
      @ketansoni8246 ปีที่แล้ว +1

      WPD 1;2 & 4 RAW DATA
      WPI 3 &5 status of spk
      WRP 6& 7 representation of WPI

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      @@samsonolufemiajayi650 : This is great Samson
      Gautham

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      @@ketansoni8246 Great job Soni
      Gautham

  • @DeyDiscoveries
    @DeyDiscoveries ปีที่แล้ว

    Deliverable status -WPD

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Correct Answer
      3. Deliverable status - WPI
      Gautham

  • @nishadibrahim5347
    @nishadibrahim5347 11 หลายเดือนก่อน

    1. WPD - this represent raw data on the number of defects
    2. WPD - represent raw data of finish dates
    3.WPI - this represent the comparison of the plan with the actual progress
    4. WPD - Raw data in the form of change request numbers
    5.WPI - this mentions about the status
    6.WPR - states about the status report
    7.WPR - Electronic report of WPI

    • @EduHubSpot
      @EduHubSpot  11 หลายเดือนก่อน

      Loving your thought process. Gautham

  • @DeyDiscoveries
    @DeyDiscoveries ปีที่แล้ว

    Last two are WPR

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Awesome job!!
      Gautham

  • @DeyDiscoveries
    @DeyDiscoveries ปีที่แล้ว

    Finished dates of activities- WPD raw data

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Awesome job!!
      Gautham

  • @sanatpatra
    @sanatpatra 10 หลายเดือนก่อน

    Hi Gautham,
    1. Number of defects found
    Work performance Information - As this can be only found after looking in to work performance Data.
    2. Finish dates of activities
    Work performance Data - Dates are part of your data.
    3. Deliverable Status.
    Work performance Data - Status is also part of the data.
    4. Number of change requests completed.
    Work Performance Data - This will also be reflected in the data.
    5. Impelementation status of change request.
    Work Performance Data - All related statuses will be part of the data.
    6. Status reports representing the implementation status of change requests.
    Work performance Report - This will be based on data collected and then a comparison is done on information and finally projected on the report.
    7. Electronic Dashboard representing deliverable status.
    Work performance Report - Dashboard / Report will be obtained from the information.
    Cheers........

    • @EduHubSpot
      @EduHubSpot  10 หลายเดือนก่อน

      Correct Answers :
      1. Number of defects found - WPD
      2. Finish dates of activities - WPD
      3. Deliverable status - WPI
      4. Number of change request completed - WPD
      5. Implementation status of change request - WPI
      6. Status reports representing implementation status of change request - WPR
      7. Electronic dashboard representing deliverable status - WPR
      Gautham

  • @kapoorvishal4446
    @kapoorvishal4446 10 หลายเดือนก่อน

    Hi Gautham,
     Number of defects found. --> WPD, as it gives the data information
     Finish dates of activities --> WPD, same I am getting some data information
     Deliverable status. --> WPI as it gives the status of delieverables
     Number of change request completed. --> WPD, same I am getting some data information
     Implementation status of change request. --> WPI as it gives the status of change request
     Status reports representing implementation status of change request. --> WPR as it is report
     Electronic dashboard representing deliverable status. --> WPR as it is report

    • @EduHubSpot
      @EduHubSpot  10 หลายเดือนก่อน

      Loving your thought process. Gautham

  • @remosumo12
    @remosumo12 3 หลายเดือนก่อน

    WPD - Collecting Plan and Collecting Actual Progress
    1. Number of Defects found.
    2. Finish Dates of Activities.
    4. Number of CRs completed.
    WPI - Comparing Plan and Actual Progress
    3. Deliverable Status.
    5. Implementation status of CR.
    WPR - An electronic representation of WPI
    6. Status reports representing the implementation status of CR.
    7. Electronic Dashboard representing Deliverable Status.

  • @parbodhkumar
    @parbodhkumar 2 หลายเดือนก่อน

    Item 1 - WPD (it is an individual raw observation)
    Item 2 - WPD (it is an individual raw observation)
    Item 3 - WPI (Because we reach useful information after analyzing data)
    Item 4 - WPD (it is an individual raw observation)
    Item 5 - WPI (Because we reach useful information after analyzing data)
    Item 6 - WPR (Because it represents the status of implementation. Even if it is not mentioned as electronic representation but tells status) Here, I am confused about whether it is mandatory to look for the word electronic to designate it as WPR. Kindly clarify.
    Item 7 - WPR (Here it is mentioned that it is an electronic dashboard that represents status)

    • @EduHubSpot
      @EduHubSpot  2 หลายเดือนก่อน

      That is exactly how you should think. Gautham

  • @DeyDiscoveries
    @DeyDiscoveries ปีที่แล้ว

    Number of defeats found-WPD. Raw data

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Great job!!
      Gautham

  • @nitindhage856
    @nitindhage856 ปีที่แล้ว

    WPD - 1, 2 & 3
    WPI - 4 & 5
    WPR - 6 & 7

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Correct Answers :
      1. Number of defects found - WPD
      2. Finish dates of activities - WPD
      3. Deliverable status - WPI
      4. Number of change request completed - WPD
      5. Implementation status of change request - WPI
      6. Status reports representing implementation status of change request - WPR
      7. Electronic dashboard representing deliverable status - WPR
      Gautham

  • @mohinimahto3119
    @mohinimahto3119 7 หลายเดือนก่อน

    Work Performance Data - 1,2,4 are data collected in terms of numbers what we fetch.
    Work performance Information- 3, 5 shows the status of the project , where we are or what actually has been covered so far.
    Work performance Report-6, 7 - shows how we represent the project status to the higher Management or the key stakeholders

    • @EduHubSpot
      @EduHubSpot  7 หลายเดือนก่อน

      Loving your thought process. Gautham

  • @shubhrasaxena3532
    @shubhrasaxena3532 9 หลายเดือนก่อน

    1,2,4- work performance data (because these are actual number of defects found, actual finish dates and actual number of change requests completed)
    3,5- Work performance information (actual progress status)
    6,7- work performance reports- representation of project status

    • @EduHubSpot
      @EduHubSpot  8 หลายเดือนก่อน

      Loving your thought process. Gautham

  • @janeogbu5249
    @janeogbu5249 2 หลายเดือนก่อน

    work performance data:
    2- finish dates of activities
    3 - deliverable status
    5- implementation status of change
    all these are giving performance data about various work.
    Work performance information:
    1- number of defects found
    4 - number of change request completed
    these are comparing one data with another data given, like number of defects found in a total item, good one and the defected ones. Same with no 4. It is comparing change request completed with the total change request raised.
    Work Performance Report:
    6- status report representing implementation of status of change request- reason ( it's a representation showing a report of an information.
    7- electronic dashboard representing deliverable status- reason ( it is a report represented electronically

    • @EduHubSpot
      @EduHubSpot  2 หลายเดือนก่อน

      Correct Answers :
      1. Number of defects found - WPD
      2. Finish dates of activities - WPD
      3. Deliverable status - WPI
      4. Number of change request completed - WPD
      5. Implementation status of change request - WPI
      6. Status reports representing implementation status of change request - WPR
      7. Electronic dashboard representing deliverable status - WPR
      Gautham

  • @kainaatayranr6000
    @kainaatayranr6000 10 หลายเดือนก่อน +1

     Number of defects found.- WPD (just no. of defects found is a collection of Data)
     Finish dates of activities- WPD (This is again im collecting the data)
     Deliverable status.- WPI (Im sharing the status of a deliverable which is a Information)
     Number of change request completed.- WPI( No. of changes completed int he sense actioned, which is nothing but information
     Implementation status of change request.-WPI( Information which helps in comparing with actuals)
     Status reports representing implementation status of change request.- WPR
     Electronic dashboard representing deliverable status- WPR ( Any status flashed on electronics dashboard using data & information is called report status)

    • @EduHubSpot
      @EduHubSpot  10 หลายเดือนก่อน

      Correct Answers :
      1. Number of defects found - WPD
      2. Finish dates of activities - WPD
      3. Deliverable status - WPI
      4. Number of change request completed - WPD
      5. Implementation status of change request - WPI
      6. Status reports representing implementation status of change request - WPR
      7. Electronic dashboard representing deliverable status - WPR
      Gautham

  • @washidali3122
    @washidali3122 ปีที่แล้ว

    WPD - 1, 2, 4 (Data)
    WPI - 3, 5 (Status)
    WPR - 6, 7 (Report)

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Keep up the good work!!
      Gautham

  • @katkepranav
    @katkepranav 11 หลายเดือนก่อน

    WPD - 2
    WPI - 3, 1, 4, 5
    WPR - 7, 6

    • @EduHubSpot
      @EduHubSpot  11 หลายเดือนก่อน

      1. Number of defects found - WPD
      4. Number of change request completed - WPD
      Gautham

  • @naveenlakkimsetti2759
    @naveenlakkimsetti2759 ปีที่แล้ว

    Number of defects found. - WPD, Reason- As per the keyword of WPD collecting the defects in this case
    Finish dates of activities - WPD, Reason - It is also part of collecting the raw data
    Deliverable status. - WPI, Reason - To know the status of the deliverable we need to compare with actual vs planned
    Number of change request completed. - WPD, Reason - It will not give the status of CR, here we are just collecting the no . of CR completed
    Implementation status of change request. - WPI, Reason - Status of the CR status can get from Planned vs Actual
    Status reports representing implementation status of change request. - WPR, Reason-Representation of data
    Electronic dashboard representing deliverable status. - WPR, Reason - Representation of data

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      That is exactly how you should think.
      Gautham

  • @Nagulsharifshaik-gh8te
    @Nagulsharifshaik-gh8te ปีที่แล้ว

    Number of defects found- work performance data as its execution level data.
    Finish dates of activities- WPD as it seems planning for the dates
    Deliverable status -WPD planned
    Number of change request completed- WPD its in execution
    Implementation status of change request.-wpr showing the status
    Status reports representing implementation status of change request- WPI showing the completion.
    Electronic dashboard representing deliverable status- wpr showing the dashboard.

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      3. Deliverable status - WPI
      5. Implementation status of change request - WPI
      6. Status reports representing implementation status of change request - WPR
      7. Electronic dashboard representing deliverable status - WPR
      Gautham

  • @SvetaBes
    @SvetaBes 6 หลายเดือนก่อน

    1 - data
    2 - data
    3 - information
    4 - data
    5 - data
    6 - report
    7 - report

    • @EduHubSpot
      @EduHubSpot  5 หลายเดือนก่อน

      5. Implementation status of change request - WPI
      Gautham

  • @MSK80J7
    @MSK80J7 7 หลายเดือนก่อน

    1,2,4-Work performance data
    3,5-Work performance information
    6,7-Work performance report

    • @EduHubSpot
      @EduHubSpot  7 หลายเดือนก่อน

      Awesome job!! Gautham

  • @muzawarm
    @muzawarm ปีที่แล้ว

    WP Data 1 = No of defects found , WP data 2 = Finish Date activities, WP data 3 = No of change requests ( identified defects requested for rework) --- This is all WP data as it is giving us info about project activities , defects found tells us from list of activities few were defected and not completed or delivered successfully, No of change request tells us that identified defects are requested for rework...... this overall is collecting data and actual progress of project activities,,, NOW Work Perf Info = WP info 1 = Project is out of schedule as few activities were not successfully delviered and have defects i.e No of defects in , WP info 2 = Change request for no of defects identified. as these 2 WP info's are derived by comparing the data with actual progress, Now reports are WP report 1 = deliverable status i.e out of list of activities planned e.g 10 activities 4 were defects & WP report 2 = change request for 4 defects implementation status of rework if all 4 were reowrked successfully or not.

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว +1

      Correct Answers :
      3. Deliverable status - WPI
      4. Number of change request completed - WPD
      5. Implementation status of change request - WPI
      6. Status reports representing implementation status of change request - WPR
      7. Electronic dashboard representing deliverable status - WPR
      Gautham

  • @Vimal-Purbia
    @Vimal-Purbia 2 หลายเดือนก่อน

     Number of defects found. - WPD
    - Because its raw data which tell that number of defects found but doesn't tell its current status

     Finish dates of activities - WPD
    - Its planning that has been done for each activities
     Deliverable status. - WPI
    - It gives the information of actual deliverable status of the work
     Number of change request completed. - WPI
    - It gives the status of no. of change requested completed
     Implementation status of change request. - WPI
    - Prividing the information of change request, how it got implemented
     Status reports representing implementation status of change request. - WPR
    - It is the report generated to show the status of CR, how it got implemented
     Electronic dashboard representing deliverable status. - WPR
    - Again, its electronic dashboard which is example of WPR
    Please correct me if I am wrong.

    • @EduHubSpot
      @EduHubSpot  2 หลายเดือนก่อน

      4. Number of change request completed - WPD
      Gautham

  • @sajidforever
    @sajidforever 8 หลายเดือนก่อน

    1,2,4 - WPD - raw data obtained without comparison
    3,5 - WPI - status after comparison with Planned vs Actual
    6,7 - WPR - keyword are reports and dashboard

    • @EduHubSpot
      @EduHubSpot  8 หลายเดือนก่อน

      Very impressive!! Gautham

  • @yashtambe4263
    @yashtambe4263 10 หลายเดือนก่อน

     Number of defects found. - WFD - its a actual data
     Finish dates of activities - Its and WFD.. its a Actual finished data
     Deliverable status. - Its WFI - Status of the project that is comparison of plan and actual
     Number of change requests completed. - WFD - its a actual data
     Implementation status of change request. - WFI - Its a comparison of total change request and actual completed CRs
     Status reports representing the implementation status of change request. - WFR
     Electronic dashboard representing deliverable status. - WFR --- Its presentation of WFD

    • @EduHubSpot
      @EduHubSpot  10 หลายเดือนก่อน

      Very impressive!! Gautham

  • @pavanrudraraju7048
    @pavanrudraraju7048 หลายเดือนก่อน

    Very informative. Great explanation! Thank you

    • @EduHubSpot
      @EduHubSpot  หลายเดือนก่อน

      Glad you enjoyed it!
      Gautham

  • @user-dq8ge3fc7w
    @user-dq8ge3fc7w ปีที่แล้ว

    1 2 4 WORK PERFORMANCE DATA (these are actual and planned data)
    3 5 WORK PERFORMANCE INFORMATION (these are status)
    6 7 WORK PERFORMANCE REPORT (these are electrocic presentations)

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Awesome job!!
      Gautham

  • @vengateshbabuvijayakannan9229
    @vengateshbabuvijayakannan9229 หลายเดือนก่อน

    Work Performance Data :
    Number of defects found, --> Collecting Actual Progress
    finish dates of activities --> Collecting Actual Progress
    No. of change request completed --> Collecting Actual Progress
    Work Performance Information -
    Deliverable Status --> Comparing Plan and Actual Progress
    Implementation status of change request --> Comparing Plan and Actual Progress

    Work Performance Report :
    Status reports representing implementation status of change request. --> An Electronic Representation of Work Performance Information
    Electronic dashboard representing deliverable status.--> An Electronic Representation of Work Performance Information

    • @EduHubSpot
      @EduHubSpot  หลายเดือนก่อน

      Loving your thought process. Gautham

  • @elgyalex6811
    @elgyalex6811 5 หลายเดือนก่อน

    Number of defects found - WPD
    Finish dates of activities - WPD
    Deliverable status- WPI
    Number of change request completed- WPD
    Implementation status of change request - WPI

    • @EduHubSpot
      @EduHubSpot  5 หลายเดือนก่อน

      Awesome Job !!
      Gautham

  • @mananjain1505
    @mananjain1505 11 หลายเดือนก่อน

    1) Number of defects found- WPI
    2) Finish date of activities- WPD
    Deliverable status- WPI
    3) Number of change request completed- WPI
    4) Implementation status of change request - WPI
    5) Status report representation implementation status of change request - WPR;

    • @EduHubSpot
      @EduHubSpot  11 หลายเดือนก่อน

      Correct Answers :
      1. Number of defects found - WPD
      2. Finish dates of activities - WPD
      3. Deliverable status - WPI
      4. Number of change request completed - WPD
      5. Implementation status of change request - WPI
      6. Status reports representing implementation status of change request - WPR
      7. Electronic dashboard representing deliverable status - WPR
      Gautham

  • @shaleenm2k
    @shaleenm2k ปีที่แล้ว

    Number of defects found work performance data
    Finish dates of activities work performance data
    Deliverable status work performance information
    Number of change request completed. work performance data
    Implementation status of change request. work performance information
    Status reports representing implementation status of change request. work performance report
    Electronic dashboard representing deliverable status. work performance report

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Very impressive!!
      Gautham

  • @umamaheswariannadurai8462
    @umamaheswariannadurai8462 2 หลายเดือนก่อน

    1) WPD: It is raw data
    2) WPD: It is raw data
    3) WPI: Information derived from data
    4) WPD: It is raw data
    5) WPI: Information derived from data
    6) WPR: Report presented using Info
    7) WPR: Report presented using Info

    • @EduHubSpot
      @EduHubSpot  2 หลายเดือนก่อน

      Very impressive!! Gautham

  • @SujataManish-yr7bo
    @SujataManish-yr7bo 2 หลายเดือนก่อน

    " Number of defects found. WPD
     Finish dates of activities WPD
     Deliverable status. WPI
     Number of change request completed. WPD
     Implementation status of change request. WPI
     Status reports representing implementation status of change request. WPI
     Electronic dashboard representing deliverable status. WPR

    • @EduHubSpot
      @EduHubSpot  2 หลายเดือนก่อน

      Loving your thought process. Gautham

  • @narawseedagaj
    @narawseedagaj ปีที่แล้ว

    Implementation status of change request - WPI , comparing with Plan on number of change request implemented so far

    • @EduHubSpot
      @EduHubSpot  ปีที่แล้ว

      Very impressive!!
      Gautham