In this video, we provide an overview of construction costs and work specifics, The price and quality of each product mentioned in this video is for example only, use it at your own discretion!
@@civilengineeringsimple Thanks for your response. My comments are meant for consumers awareness and with intention to protect consumers from fraudsters. Hard earned money and time spent on home loan should be made on a reasonable purchase.
First client get plan & material specification after that fix the material quality and finally fix budget and get sq ft rate , sq ft rate based method not good for construction activity because every project, plan, location, material quality, labour rate, working area space these are separate and different, so first get a plan , take material specification and quantity after that fix the rate that is good practice for in this field
Yeah you are right bro, 1st finalize floor plan and then get structural drawing for that plan, based on those do detailed estimation and arrive out a sq.ft rate. Sq.ft rate is not a MRP rate, It vary based on projects and area.
Worst animation audio noise. Affecting the conversation, unable to hear properly when there is any animation audio. Not use this or rework as per conversation gap.
For this we have to plan our boundary to construction wall we have to provide 3 feet so that we can keep digging for our post work otherwise it will be difficult
Sir enakku ACC block and steel door and gypsum plating pani veedo katta mudium ah panna evolo save panalam please athu related ah oru video podoinga bro
I am also civil engineer ella engineerum thappa solladheenga ellaroda mind set epdina qualityum irukanum cost um kammiya irukanum nu nanacha eamathito illa vittutadha povanga evan poi pesuranu avana tha nambuveenga unmaiya soldravana namba maatinga soo home dustbin maaritha irukum unmaya pesi quality pandravangaluku kaalam illa . Ellarum oru business or work pannuveenga endha cost la senja enndha quality la build aagum nu thariyum soo think about it
Nee mattume pesure... Main work at 2200/per sqft so what are the extra works Sump, head room slab Grill door, hand rail, septic tank, front sit out rate, balcony rate, front elevation design rate.. please ippadi pesunga...
For this Engineer ,Ramco is high brand cement.He forget to tell about Ultra Tech,Tata Steel,Somanyor kajeria.That is his level of construction.Medium level contractor
What would be the size of the columns and what type of footing, grade (M20/M25) good for 1300sqft 3 floor commercial construction. Please share your ideas. Thank you
i am also civil engineer, 1.all cement& steel are follow indian standard so all cement are good, 2. if u choose framed structure ,not necessary used costly brick
Bro, roof top waterproof paint I'm going to apply .painter told me before have to apply primer. I told them white cement with repair polymer is based coat . Which is better
2200 is best construction price. Otherwise all are fake. So please don't go low construction price people. They definitely cheated you. It's my advice.
Civil Work Total Value Step By Step Payment Always best Payment Terms : Advance 20% After Basements 40% After ceiling Processing 25% Last and Final Payment After Completion 15% Safe and Secure for Payment and Project Also.
If anyone appointing any contractor for building construction, please check the history of his works. Check the quality of building which is at 3-5 age. If any cracks found, even on external or internal plastering, he is not a qualified contractor.
1. No foreclosure charges applicable to customer incase customer wants to terminate the Contract. 2. Slabs agreed amount should be paid after execution of the work by engineer. Initially u can pay 30% and balance 30% and after execution 40% after your satisfied on the work complete. 3. Add Penalty fees compensation by builder Or engineer at 10% of total value paid for not completing the work on time Or timelines missed by them purely. 4. Amount should flexible as per customer convenience for making arrangements of funds for each slab and engineer responsibility for delivering the work with Quality and Right Quantity used. Note slabs should be agreed as per bank payment release to customer.
One more point please add it is a must Engineer Or experienced supervisor should be available all time whenever there is ongoing work including weekend as necessary.
Ena da ipdi emathuringa 2500rs pona than septic tank sump la varum ah apo septic and sump evlo sqft la build pandringalo athuku thana amt vanganum en total build area kum sethu vanguringa 😢
Civil Work Total Value Step By Step Payment Always best Payment Terms : Advance 20% After Basements 40% After ceiling Processing 25% Last and Final Payment After Completion 15% Safe and Secure for Payment and Project Also.
@@muralikrish7304 Rs. 2,300 is an overestimate. These days, very few contractors maintain a permanent skilled workforce. Most contractors hire labor on a project basis, often without fully knowing the skill level of the workers. What surprises me the most is that many contractors, without reviewing the drawings, bill of quantities, or land size and position and other driving factors, confidently estimate prices exceeding Rs. 2,000 per square foot. A competent civil engineer first calculates the material and labor costs before determining the price. Setting a price without any concrete data seems more profit-driven than product-focused.
@@muralikrish7304 Rs. 2,300 is an overestimate. These days, very few contractors maintain a permanent skilled workforce. Most contractors hire labor on a project basis, often without fully knowing the skill level of the workers. What surprises me the most is that many contractors, without reviewing the drawings, bill of quantities, or land size and position and other driving factors, confidently estimate prices exceeding Rs. 2,000 per square foot. A competent civil engineer first calculates the material and labor costs before determining the price. Setting a price without any concrete data seems more profit-driven than product-focused.
@@muralikrish7304 Rs. 2,300 is an overestimate. These days, very few contractors maintain a permanent skilled workforce. Most contractors hire labor on a project basis, often without fully knowing the skill level of the workers. What surprises me the most is that many contractors, without reviewing the drawings, bill of quantities, or land size and position and other driving factors, confidently estimate prices exceeding Rs. 2,000 per square foot. A competent civil engineer first calculates the material and labor costs before determining the price. Setting a price without any concrete data seems more profit-driven than product-focused
In this video, we provide an overview of construction costs and work specifics, The price and quality of each product mentioned in this video is for example only, use it at your own discretion!
@@civilengineeringsimple Thanks for your response.
My comments are meant for consumers awareness and with intention to protect consumers from fraudsters.
Hard earned money and time spent on home loan should be made on a reasonable purchase.
Sir engineer cost per square feet for supply of all material for me please consider
Ss316
Ungha Company name solla ve illa ???
தயவு செய்து அந்த சவுண்ட நிருத்துங்க.. எரிச்சலா இருக்கு.. please stop all those unwanted sounds in the animation.. it's irritating.
Very much informative and helpful for new people.
First client get plan & material specification after that fix the material quality and finally fix budget and get sq ft rate , sq ft rate based method not good for construction activity because every project, plan, location, material quality, labour rate, working area space these are separate and different, so first get a plan , take material specification and quantity after that fix the rate that is good practice for in this field
Itemwiserate for each quantity of construction any building can be foolproof method both for client and builder even invade of breach
Yeah you are right bro, 1st finalize floor plan and then get structural drawing for that plan, based on those do detailed estimation and arrive out a sq.ft rate. Sq.ft rate is not a MRP rate, It vary based on projects and area.
Shed cost seperate ah kudukkanuma
Worst animation audio noise. Affecting the conversation, unable to hear properly when there is any animation audio. Not use this or rework as per conversation gap.
Yes, those sounds are irritating
best is to go for a labour contract. you can construct permiun house sq 1700
Contact number kodungabbro
Load bearing house entha rate ilarum pannalam bro
Correct exact 1700 per sq cost aachu my construction
true
And spend a fortune on maintenance every year. Fool.
Can you explain about excavation for new house, if neibour not allowing us to dig, explain the norms and rules
With Building approval approach corporation or panchayat
For this we have to plan our boundary to construction wall we have to provide 3 feet so that we can keep digging for our post work otherwise it will be difficult
அருமையான பதிவு வாழ்க வளமுடன்
Sir enakku ACC block and steel door and gypsum plating pani veedo katta mudium ah panna evolo save panalam please athu related ah oru video podoinga bro
Excellent Fantastic Superb Speech especially tuck in 1st person Keep it up
Thank you so much
best is to go for a labour contract.
Ss correct
BOQ method is best I am also civil engineer bro nee ga choose pandra engineer base panni iruku unga kanavu ellam super ahh Vara
Can you explain wat is boq method pls@@jeeva_official8564
Very good explanation and useful. Thank you.
You are welcome 👍
I am also civil engineer ella engineerum thappa solladheenga ellaroda mind set epdina qualityum irukanum cost um kammiya irukanum nu nanacha eamathito illa vittutadha povanga evan poi pesuranu avana tha nambuveenga unmaiya soldravana namba maatinga soo home dustbin maaritha irukum unmaya pesi quality pandravangaluku kaalam illa . Ellarum oru business or work pannuveenga endha cost la senja enndha quality la build aagum nu thariyum soo think about it
Watch till the end then come and comment
Unga insta id soluga oru doubt iruku kekanum
Engr, first you should learn perfect english.
Your words like mesthiri
Nee mattume pesure...
Main work at 2200/per sqft so what are the extra works
Sump, head room slab Grill door, hand rail, septic tank, front sit out rate, balcony rate, front elevation design rate.. please ippadi pesunga...
Construction cost depends on region like urban / semi urban / village / town etc
Enagu oru idea 💡 kedachu erugu construction 🏗️ old type septic tank
For this Engineer ,Ramco is high brand cement.He forget to tell about Ultra Tech,Tata Steel,Somanyor kajeria.That is his level of construction.Medium level contractor
@@kalarajkumar1389 we just tell example brand please watch till the end after come and comment
Please post a video about how to start BarBending Schedule company?
Sir steel brand use pannurathu.sumangala use pannalama roofukku
Pannalam
Everything will change according to the cost. Iyya everyone knows it.
What would be the size of the columns and what type of footing, grade (M20/M25) good for 1300sqft 3 floor commercial construction. Please share your ideas. Thank you
ஏமாறாமல் வீடு கட்டுவது எப்படி.. இதுபோன்ற வீடியோவை தவிர்க்க வேண்டும்..😂😂😂
😂😂
Adhuku neenga engineer ta BOQ method la pannunga
Boq na ana bro
😂
நல்ல வருமானம், நபிக்கையான ஆள் கிடைப்பது சிரமம்.
i am also civil engineer,
1.all cement& steel are follow indian standard so all cement are good,
2. if u choose framed structure ,not necessary used costly brick
Bro, roof top waterproof paint I'm going to apply .painter told me before have to apply primer. I told them white cement with repair polymer is based coat . Which is better
2200 is best construction price. Otherwise all are fake. So please don't go low construction price people. They definitely cheated you. It's my advice.
Civil Work Total Value Step By Step Payment Always best
Payment Terms :
Advance 20%
After Basements 40%
After ceiling Processing 25%
Last and Final Payment After Completion 15%
Safe and Secure for Payment and Project Also.
Brother agreement details video podunga
@@mohammedfaayiz.h3435 ok bro
If anyone appointing any contractor for building construction, please check the history of his works.
Check the quality of building which is at 3-5 age.
If any cracks found, even on external or internal plastering, he is not a qualified contractor.
V.good explained 👍👍
Mason labour how much ??
Super அண்ணா
After construction how many years we need to wait to show up cracks in the walls
நல்ல கருத்து
Engineer and client problem facing in construction explain bro
@@vinothkumar9408 ok bro
It's unnecessary titled Cost may differ depending upon Quality of products.
What are the points should considered in the Agreement
1. No foreclosure charges applicable to customer incase customer wants to terminate the Contract.
2. Slabs agreed amount should be paid after execution of the work by engineer. Initially u can pay 30% and balance 30% and after execution 40% after your satisfied on the work complete.
3. Add Penalty fees compensation by builder Or engineer at 10% of total value paid for not completing the work on time Or timelines missed by them purely.
4. Amount should flexible as per customer convenience for making arrangements of funds for each slab and engineer responsibility for delivering the work with Quality and Right Quantity used. Note slabs should be agreed as per bank payment release to customer.
One more point please add it is a must Engineer Or experienced supervisor should be available all time whenever there is ongoing work including weekend as necessary.
Incase customer have not paid at mentioned time for the payment.. they will agree to give 10% extra va??
@@muralikrish7304 no this depends upon engineer ask
Why that ushk...ushk sound. That's irritating 😐
🏡Shivalayam construction🏘️🏕️
Pollachi 🎉
Ena da ipdi emathuringa 2500rs pona than septic tank sump la varum ah apo septic and sump evlo sqft la build pandringalo athuku thana amt vanganum en total build area kum sethu vanguringa 😢
Correct
Elam ok bro.. unbranded ku parthiban photo uh use paningle. Athu than entu puriyala 😂
நான் 1800க்கு அக்ரீமெண்ட் போட்டு 99%cash கொடுத்து 2வருடமாக வீடு கட்டாமல் ஏமாற்றிவிட்டார்.
When we looking for cheap price that can do by only cheap people's
Because of Kavin type payaluga
வாழ்க வளமுடன்.
Civil Work Total Value Step By Step Payment Always best
Payment Terms :
Advance 20%
After Basements 40%
After ceiling Processing 25%
Last and Final Payment After Completion 15%
Safe and Secure for Payment and Project Also.
@@alya14_faiz Yes, You are Correct.
சார் வீடு கட்றவங்க ஏமாற்றுவதில்லை
பிளாக் மையில் செய்வாங்க
இதிலிருந்து தப்பிக்க பணம் செலவு செய்ய வேண்டியது வரும்
Car parking Portigo la poish granite podalama
Unpolished granite thick 20 or above mm thickness use panunga,,seperate tiles ah sell panranga
500D 550d isi irundhale k dhana.
Pvs constructions
Our service by erode , Tirupur, Coimbatore
coimbatore na vae setting interview
Na oru site supervisor
Nanga ipo sq.feet 1800/- panitu erukom
Na thaniya construction pananum nu asa
ENTHA OORULA IRUKINGA
Which location.. if you r from coimbatore really you r fake
@@muralikrish7304 oh really
@@parthasarathydhanapaul835 Coimbatore Mettupalayam
BOQ methed பண்ணுவார்களா
MALAR BUILDER'S, EMANESWARAM,
Summa materials patthi pesiringa... EB busbar outside parking tiles staircase tiles
V Creative Homes
Thanjavur
Contact number pls
MALAR BUILDERS,EMANESWARAM
Bro head room sqft rate la varuma varatha please solunga
No sir
2500 over price
2000 ivar sollra ellam pandranga
₹1900/sqft is a robbery price
2000 rs we can do a proper structural building work.. minimum 2300 rs required for a good quality construction
@@muralikrish7304 Rs. 2,300 is an overestimate.
These days, very few contractors maintain a permanent skilled workforce.
Most contractors hire labor on a project basis, often without fully knowing the skill level of the workers.
What surprises me the most is that many contractors, without reviewing the drawings, bill of quantities, or land size and position and other driving factors, confidently estimate prices exceeding Rs. 2,000 per square foot.
A competent civil engineer first calculates the material and labor costs before determining the price.
Setting a price without any concrete data seems more profit-driven than product-focused.
@@muralikrish7304 Rs. 2,300 is an overestimate.
These days, very few contractors maintain a permanent skilled workforce.
Most contractors hire labor on a project basis, often without fully knowing the skill level of the workers.
What surprises me the most is that many contractors, without reviewing the drawings, bill of quantities, or land size and position and other driving factors, confidently estimate prices exceeding Rs. 2,000 per square foot.
A competent civil engineer first calculates the material and labor costs before determining the price.
Setting a price without any concrete data seems more profit-driven than product-focused.
@@muralikrish7304 Rs. 2,300 is an overestimate.
These days, very few contractors maintain a permanent skilled workforce.
Most contractors hire labor on a project basis, often without fully knowing the skill level of the workers.
What surprises me the most is that many contractors, without reviewing the drawings, bill of quantities, or land size and position and other driving factors, confidently estimate prices exceeding Rs. 2,000 per square foot.
A competent civil engineer first calculates the material and labor costs before determining the price.
Setting a price without any concrete data seems more profit-driven than product-focused
🏡🏡🏡🏡🏡🏡🏡🏡👍
Da ennada solriga onnume purila
விளம்பரம்
Brand name solakulla, teliva solluppa