Rishikesh- Karnaprayag Railway Project || New Update || 25th January 2024 || Chardham Rail Project |

แชร์
ฝัง
  • เผยแพร่เมื่อ 14 ต.ค. 2024
  • Rishikesh- Karnaprayag Railway Project || New Update || 25th January 2024 || Chardham Rail Project |
    #railway #railways #railwayproject #modi #deramproject #modidreamproject #narendramodi #chardham #chardhamyatra #tunnel #tunnelconstruction #rishikesh #karnaprayag #tunnelling #engineering #engineer #geology #geologyrocks #engineers #ऋषिकेश-कर्णप्रयाग रेलवे परियोजना #सुरंग के अंदर कैसे काम किया जाता है #chardham railway project
    #rishikeshrailwaystaion
    Subscribe to my channel and hit the bel icon for all the new informative videos.
    The Rishikesh-Karnaprayag Railway, runs from Yog Nagari Rishikesh railway station in Rishikesh to Karnaprayag. It is Indian Railways' proposed route for the Char Dham Railway to connect to the Chota Char Dham. It is geostrategic initiative of India to counter China's expansion. The old Rishikesh railway station is located inside the town, so the railway line could not be extended through densely inhabited areas. Therefore, a new railway line was built from Virbhadra railway station and a new highly-facilitated Yog Nagari Rishikesh railway station was built in 2020. The 125 km long Rishikesh-Karnaprayag route starts at Yog Nagari Rishikesh at 385m AMSL and ends at Karnaprayag 825m AMSL. The ₹16,200 crore project will reduce Rishikesh to Karnaprayag travel time from 7 hours to 2.1 hours. It will have 16 bridges and 105 km or 85% of the project inside tunnels. A 15.1 km tunnel, reported to be the country's longest, will be built between Devprayag and Lachmoli on the route. As per the letter issued to Uttarakhand government by RVNL, the sites where railway stations will come up are - Yog Nagari Rishikesh in Rishikesh, Dehradun district, Srinagar, Tehri, Shivpuri and Byasi in Tehri district, Devprayag and Dungripanth (Dhari devi) in Pauri, Rudraprayag and Gholtir in Rudraprayag district, and Gaucher and Karanprayag in Chamoli district. The proposed 125-kilometre stretch will have 12 stations, 17 tunnels and 35 bridges. It will be constructed at a cost of Rs 16,216 crore and is expected to be completed by December 2024.
    Your queries
    Rishikesh - Karnaprayag railway project latest new update
    Rishikesh - Karnaprayag railway project
    Rishikesh Karnaprayag rail line
    Rishikesh - Karnaprayag railway stations
    Rishikesh - Karnaprayag railway project status
    Chard ham rail line project
    Chardham railway project letest new update
    Chardham rail line Uttarakhand latest new update
    Uttrakhand railway project
    Uttrakhand railway project latest new update
    Karnprayag railway project latest new update
    Srinagar rail line latest new update
    ❤️Stay Tuned❤️
    ❤️Thank you❤️
    Like !Share ! Comment ! Subscribe
    Stay tuned for upcoming videos.

ความคิดเห็น • 52

  • @kailashkhanduri4496
    @kailashkhanduri4496 8 หลายเดือนก่อน +1

    bahut badiya kaam ho raha hai,,,humara Uttarakhand badalne wala hai,,,,dhanyavad bhai video banane k liye

  • @sanjayKumar-ku8pv
    @sanjayKumar-ku8pv 8 หลายเดือนก่อน +1

    Har Har Mahadev 🙏

  • @surendrachaudhary1619
    @surendrachaudhary1619 8 หลายเดือนก่อน +1

    Nice video with technical knowledge
    Jai Hind
    Jai Badri Vishal ❤

  • @jitenderrawat1433
    @jitenderrawat1433 8 หลายเดือนก่อน +1

    अति सुन्दर

  • @popatahire7007
    @popatahire7007 6 หลายเดือนก่อน +1

    Great.modiji

  • @SahilshaRma-ne8ei
    @SahilshaRma-ne8ei 8 หลายเดือนก่อน +1

    Sir,
    Kindly upload video on how to make 3d geological mapping on graph and autocad.
    It will be great useful for me as a beginner in geology field thank you.

  • @vandanarawatvlo
    @vandanarawatvlo 8 หลายเดือนก่อน +1

    Super

  • @GovindSingh-e9j
    @GovindSingh-e9j 8 หลายเดือนก่อน +1

    Good❤❤

  • @sanjayKumar-ku8pv
    @sanjayKumar-ku8pv 8 หลายเดือนก่อน +1

    Jai badri bishal 🙏 bhai ji

  • @narendra5769
    @narendra5769 8 หลายเดือนก่อน +1

    I’m MSc zoology students
    I like your explanation

  • @mehtapramod23
    @mehtapramod23 7 หลายเดือนก่อน +1

    WE SHOULD COMPLETE 4 DHAM RAIL LINE ON MISSION MODE IF WE WANT TO BE SUPER POWER UP TO 2047....

  • @sunrisevideosgamingandmuch7791
    @sunrisevideosgamingandmuch7791 8 หลายเดือนก่อน +1

    Bhai excavation me rock cutter disk ki attachment use karna chaiye usse kaam ki speed kafi had tak badh jati hai

    • @Kedarnath_Valley93
      @Kedarnath_Valley93  8 หลายเดือนก่อน +1

      Hamare contract me nhi hai wo , jo equipment contract me hoge use se krte hai excavation

  • @ASHOKKUMAR-nj8ry
    @ASHOKKUMAR-nj8ry 8 หลายเดือนก่อน +1

    Ye project kab tak pura ho jayega

  • @thakursahab8426
    @thakursahab8426 8 หลายเดือนก่อน +1

    Sir ye kab tak complete ho jayega? I mean when will train get start??

  • @ankitsemwal2923
    @ankitsemwal2923 8 หลายเดือนก่อน +1

    Kb tk complete hoga ye

    • @Kedarnath_Valley93
      @Kedarnath_Valley93  8 หลายเดือนก่อน

      2027 - 2028 tak train start ho jayegi

  • @ASHOKKUMAR-nj8ry
    @ASHOKKUMAR-nj8ry 8 หลายเดือนก่อน +1

    Kitni tanal ban gyi or kitni baki h abhi

    • @Kedarnath_Valley93
      @Kedarnath_Valley93  8 หลายเดือนก่อน

      Hamare package me 4 tunnel ban gyi or 4 tunnel baki hai

  • @vijaybist4389
    @vijaybist4389 7 หลายเดือนก่อน +1

    Aap ke Jane ke bad update nahi mil pa raha hai

  • @koyyalashankar6303
    @koyyalashankar6303 8 หลายเดือนก่อน +1

    Hi

  • @KaranSingh-ns2cu
    @KaranSingh-ns2cu 8 หลายเดือนก่อน +1

    Ham se yatra kar sakte bhai ji. Yai btao

  • @KgnDilbar
    @KgnDilbar 6 หลายเดือนก่อน +1

    Bhai mujhe aap se baat karne hai mujhe aap se kuch kame hai ya fir wo mujhe reply de sakta hai jo waha abhi es waqt kame kar raha ho

    • @Kedarnath_Valley93
      @Kedarnath_Valley93  6 หลายเดือนก่อน

      Bhai me bhi kaam kr rha hu abhi present time me yha par

  • @sunrisevideosgamingandmuch7791
    @sunrisevideosgamingandmuch7791 8 หลายเดือนก่อน +1

    Bhai ek or question tha per day kitna excavation ho jata hai

    • @Kedarnath_Valley93
      @Kedarnath_Valley93  8 หลายเดือนก่อน +1

      Excavation rock class ke according hota hai , achi quality ki rock hogi to 1 din me 1 face me 6 mtr tak excavation ho jata hai or rock quality achi na ho to 1 din me 1.5mtr excavation bhi hota hai

    • @sunrisevideosgamingandmuch7791
      @sunrisevideosgamingandmuch7791 8 หลายเดือนก่อน

      @@Kedarnath_Valley93 thank you for detailed response bhai

  • @ajayshah55
    @ajayshah55 8 หลายเดือนก่อน +1

    Kitna kam hua?kitna baki?...

    • @Kedarnath_Valley93
      @Kedarnath_Valley93  8 หลายเดือนก่อน

      45%work complete

    • @ajayshah55
      @ajayshah55 8 หลายเดือนก่อน

      @@Kedarnath_Valley93 suggestions them to start at 45percentage completed...why not trial than run

  • @shobhnathpatel2872
    @shobhnathpatel2872 8 หลายเดือนก่อน +1

    JIS tunnel me 41 majdoor fase the us tunnel ka video update

    • @Kedarnath_Valley93
      @Kedarnath_Valley93  8 หลายเดือนก่อน

      Wo tunnel uttarkashi me hai , or me rudraprayag me kaam krta hu

  • @vijaybist4389
    @vijaybist4389 8 หลายเดือนก่อน +1

    What is a fire fighting area?

    • @Kedarnath_Valley93
      @Kedarnath_Valley93  8 หลายเดือนก่อน

      Firefighting area is used for any emergency or fire emergency, that 1km area used for fire emergency that’s why that is called firefighting area.

  • @ajayshah55
    @ajayshah55 8 หลายเดือนก่อน +1

    pura project ka

  • @SKHasda-vi1ef
    @SKHasda-vi1ef 8 หลายเดือนก่อน +1

    Bhai copy me et Mt fire fighting draw karke samjha do

    • @Kedarnath_Valley93
      @Kedarnath_Valley93  8 หลายเดือนก่อน

      Firefighting area is used for any emergency or fire emergency, that 1km area used for fire emergency that’s why that is called firefighting area.
      Next video me btauga ET or MT ko details me

  • @Click2VisiT
    @Click2VisiT 3 หลายเดือนก่อน +1

    Konse year m complete ho jayega

  • @mehtapramod23
    @mehtapramod23 8 หลายเดือนก่อน +2

    WE SHOULD COMPLETE 4 DHAM RAIL ON MISSION MODE IF WE WANT TO BE SUPER POWER UP TO 2047