Counterweight System Safety Calls

แชร์
ฝัง
  • เผยแพร่เมื่อ 8 ก.พ. 2025
  • Continuing in our series about counterweight systems, this video reviews the communication necessary to operate a fly system safely. Calls vary from venue to venue but establishing a standard and using those calls every time is what is important. Check out Chicago Flyhouse training at www.flyhouse.com/training!
    [for entertainment purposes only]

ความคิดเห็น • 2

  • @kristir-c5695
    @kristir-c5695 4 ปีที่แล้ว +2

    We have our flyperson do the weight call to the loaders and a "master of the deck" call from the stage to the flyperson. MOD keeps a visual along the line set on stage as it's moving. During a performance, the ASM or a carpentry deck crew member does the same visual observation so there is always someone watching when any piece is moving.
    I'm glad you included the repetition of the confirmation of the instruction. That helps prevent misunderstandings.

  • @khaderahmad-abdallahllop7823
    @khaderahmad-abdallahllop7823 4 ปีที่แล้ว +1

    A 12.5kg brick falling from 22m is able to bounce at least 6m on a concrete/epoxy floor. Fun.