    This guy is a beast at what he does. Breaking all the rules and still getting it done.tiled all the way down then pouring the shower pan is definitely one. Lol.

    • @markreitter163
      @markreitter163 2 ปีที่แล้ว

      😊

    • @urbanearthwarriors5856
      @urbanearthwarriors5856 2 ปีที่แล้ว +1

      He had the rubber behind the tile. Worst that will happen is his tile will wick the pack

    • @whodafukarweetribe
      @whodafukarweetribe 2 ปีที่แล้ว +1

      No pressure testing , no pan liner test, but will the beast go back and rectify his coy pond.

    • @MAGAMAN
      @MAGAMAN 4 หลายเดือนก่อน

      Rules exist for a reason.

  • @williamsauder1823
    @williamsauder1823 2 ปีที่แล้ว +2

    I'm Impressed 👍👍I installed tile for over 25 years It's nice to see somebody float wall's. Good job no f'ing around

  • @DaddyLocz4
    @DaddyLocz4 3 ปีที่แล้ว +9

    Hell yeah bro! Love your work ethic. He said “NOTHING works by accident gotta make sure its GOLDEN” thats facts!

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      Thank you bro

  • @jakekothrade6449
    @jakekothrade6449 2 ปีที่แล้ว +9

    Looks nice.
    One thing I would like to point out is that when you changed the plumbing drain where it connected to the vent tee, you made it a tee wye, that now doesn't meet code.
    You shouldn't have a problem snaking a 2" tee to start, but the reason for code compliance is the water level now can block the air in that tee wye. The vent is lower than the drain. Then it acts like it isn't vented. IPC and UPC plumbing codes address this. Functions like an s trap.

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว

      I know exactly what you mean and I did make that change later on. I have a c36 California plumbing license.

    • @garycapley8686
      @garycapley8686 2 ปีที่แล้ว +6

      Wow, that seems like overkill, chicken wire and all that. How come you didn’t just do cement board?

  • @bertveldhuizen8699
    @bertveldhuizen8699 3 ปีที่แล้ว +25

    So, demo, mudding, tiling, grouting and sealing all in two days? I call bullshit! You didn't give anything proper time to set up or dry.

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว +3

      It drys well you work on it.

    • @BMWStrategy
      @BMWStrategy 3 ปีที่แล้ว +4

      When a person is a professional at what they do time is not a problem.

    • @RELAXnRENOVATE
      @RELAXnRENOVATE 3 ปีที่แล้ว +3

      @@SuperVPro So you laid your floor tile on top of your dry pack mud bed, all in the same day? What was your mix ratio and what type of cement did you use?

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว +4

      Yes that's right we use dyna-crete bag mud.

    • @joseatrev1
      @joseatrev1 3 ปีที่แล้ว

      2 days?

  • @rizzimyers2795
    @rizzimyers2795 3 ปีที่แล้ว +3

    Did you use spacers? grout? I've never done tile before without grout

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว +2

      No spacers but yes on grout .
      I like minimize grout less cleaning and home owner love that.

    • @jeremynguyen2346
      @jeremynguyen2346 2 ปีที่แล้ว

      @@SuperVPro we are going to remodel the whole house

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว

      @@jeremynguyen2346 I specialize in kitchens and bathrooms not necessarily other things though I do do them time to time .

    • @jeremynguyen2346
      @jeremynguyen2346 2 ปีที่แล้ว

      @@SuperVPro do you like remodeling

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว

      @@jeremynguyen2346 Absolutely I do after the work is done I feel in accomplishment and I love how happy the people are.

  • @rcjunkies213
    @rcjunkies213 10 หลายเดือนก่อน

    Nice work what kind of grout did use also how much incline did make it for water flow

  • @leonardoneri4160
    @leonardoneri4160 3 ปีที่แล้ว +38

    Great Video!! I recommend don’t put a lot of thinset unless your installing Tile right away if your Thinset gets air that bond won’t be right. Also if you do plumbing leave it open 24hr to make sure there’s no leaks. And from personal experience use Oatey Shower Pan PVC Adhesive on the drain 👌🏻

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      Thank you for you input.

  • @yousufkothawala270
    @yousufkothawala270 3 ปีที่แล้ว +9

    This is the best shower prep job ive ever seen

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว +1

      You are way too kind thank you so much. thank you for watching this video I appreciate your comment.

  • @jamescc2010
    @jamescc2010 3 ปีที่แล้ว +5

    Very nice. I enjoyed the work.
    Shower remodel to me it’s very important because if you do upstairs it can cause water leak if you don’t do it properly.
    We all should spend time in learning how to do this ourself.

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      Your 100% right, I make sure it fool proof.

    • @Thetimberteam
      @Thetimberteam 3 ปีที่แล้ว

      Agreed!!

  • @qualityflooringmanitousprings
    @qualityflooringmanitousprings 2 ปีที่แล้ว +14

    You should always poor and mud your pan and tile the shower floor before running any tiles on the walls. And don’t be a professional rookie and use a piece of fern strip to run your tile it if you pour your pan right and install your tile right you should be able to run your wall tiles right off of your floor tiles for a perfect installation every time!

  • @ponyony9621
    @ponyony9621 3 ปีที่แล้ว +13

    I love doing projects myself I have given myself a summer job changing a tub to shower watching your videos gave me more knowledge keep your fingers crossed it turns out well. I have plumbed a shower wall before never removed a tub and changed it so thanks for showing me I can handle it

    • @dustyflair
      @dustyflair 3 ปีที่แล้ว +1

      dude it is very complex!!!!

    • @jeremynguyen2346
      @jeremynguyen2346 2 ปีที่แล้ว

      @@dustyflair how long does it take to remodel a bathroom

    • @dustyflair
      @dustyflair 2 ปีที่แล้ว +2

      @@jeremynguyen2346 5 days min with drying time on shower preslope, water proofing, etc.

    • @jamesortmann6587
      @jamesortmann6587 2 ปีที่แล้ว

      Congrats lose value in your home lol

    • @jeremynguyen2346
      @jeremynguyen2346 2 ปีที่แล้ว

      @@jamesortmann6587 👋

  • @anthonyrogers9498
    @anthonyrogers9498 2 ปีที่แล้ว +1

    Great remodel. What size show and bathroom is that. Hoping I have enough to do the same.

  • @fernandosanfranciscoca9278
    @fernandosanfranciscoca9278 3 ปีที่แล้ว +11

    A Person that can Float a shower wall and install Tiles right away KNOWS whats he's doing 👍👍👍

  • @ddknab
    @ddknab 2 ปีที่แล้ว

    Liked your video. Tell me, if I plumb a double shower system from a single 3/4” copper supply line and with a 5’ linear shower drain taking it from the standard 2” to 1 1/2” pvc and sweep it into the former bathtub drain (with no vent now) is it going to drain properly? Code only states that the drain is capable of moving 1.5x the supply volumetrically. Your thoughts?

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว

      It should work as long as the shower has a curb. I would not trust it with a curb less shower.

  • @everyday_life1991
    @everyday_life1991 ปีที่แล้ว

    So is it preference to install the mud bed first or shower pan before you tile the walls to the bottom? I need help on finishing my project and not sure which route to go

    • @SuperVPro
      @SuperVPro  ปีที่แล้ว

      Me doing it over 22 years I would definitely do the way I showed on this video. I would 1st prefloat install Pan. Install walls and tile them. Then float out shower floor and install tile in the shower floor to finish off the shower.

  • @natvloggssd7590
    @natvloggssd7590 หลายเดือนก่อน

    I’m pretty impressed definitely 👍🏼

    • @SuperVPro
      @SuperVPro  หลายเดือนก่อน

      Thanks 👍🏼

  • @markamundsen8539
    @markamundsen8539 ปีที่แล้ว

    Hi ! Why do you install floor last ?? Water goes down walls on top of crack or seam wall to floor. Isn’t it better waterproof ways to install floor first then walls on top of floor ?

    • @SuperVPro
      @SuperVPro  ปีที่แล้ว

      It will not be better because you will not be able to replace the floor if you want to. Plus underneath your mud and tile is weep holes which can take care of any water that needs to go down there.

  • @dafoundingking
    @dafoundingking 9 หลายเดือนก่อน

    How did you know to skip over the wooden beams in the wall

  • @z74able
    @z74able 2 ปีที่แล้ว +1

    I wish we could have seen how the vanity was installed. It looks beautiful. Was the water fall edge vanity custom made?

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว +1

      Yes I fabbed up the top on the spot including all the miters.

  • @laprepper
    @laprepper ปีที่แล้ว

    The fact that you said header and load bearing pleases me😊

  • @hc3369
    @hc3369 ปีที่แล้ว

    Question - the tiled-in-drain looks very nice, but what do you do with hair and such that falls in ? is the tiled drain removable to clean the hair and gunk out?

    • @SuperVPro
      @SuperVPro  ปีที่แล้ว

      The pc in the middle comes out and has a basket underneath.

  • @Crystal-be9ze
    @Crystal-be9ze ปีที่แล้ว

    Are you supposed to put in the shower pan last? And is all the stuff you did with the paper etc necessary if it’s a basement shower?

    • @SuperVPro
      @SuperVPro  ปีที่แล้ว

      Yes it is the best way to install it last because the shower Pan gets used to most and gets nasty the most and it could be easily replaced. Without messing up the wall or the pan. You can literally peel off the tile and put new one on top. Also all the paper is used to redirect water so it is very necessary. It is called aqua Bar b.

  • @decemberdc
    @decemberdc 2 ปีที่แล้ว

    you didn't have trim around the niche, but it does look good, how did you do that please walk me step by step

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว

      All I did is mitered all the corners it looks clean.

  • @jrrodriguez8616
    @jrrodriguez8616 3 ปีที่แล้ว +10

    Good work glad to see you back at recording .

  • @enriquemorales4522
    @enriquemorales4522 3 ปีที่แล้ว +6

    Tile installation... The final job looks great. However, the tiles were not properly installed. When you install an interior tile you should have a minimum contact area of 80% between the tile and the thin set (NOT LESS). Exterior tiles and tiles subject moisture (i.e. Showers) should have a 95% of contact area (ANSI A108.5). You can also refer to the current version of the TCNA Handbook.

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      100% contact is better than all of that can you please explain what you're talking about?

    • @Oneguyinc.
      @Oneguyinc. 3 ปีที่แล้ว +4

      I’ll explain all your mortar needs to be spread in one direction perpendicular,then tiles need to be placed and worked side to side (perpendicular) to knock down the ridges that’s why you use a notch trowel and lastly tiles need to be vibrated or tapped to release air bubbles if you do not do those three things you will not get 95% coverage!

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว +1

      @@Oneguyinc. What you're talking about is something that has to be done if your thin set is very stiff my stuff is very wet including the mud everything squishes out without a problem. That's why floating your walls with mud is the best way is way and the longest lasting .

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      @UCRAT_Lw67V-Y2PG9NfUVQQA who are you what is your company name ?

  • @AnthonyMott-v4l
    @AnthonyMott-v4l 10 หลายเดือนก่อน

    Do you have the name and information of the floor tile you used in this video?

  • @hotelgulf
    @hotelgulf 2 ปีที่แล้ว +1

    What was the final cost of this renovation? Nice finishes-

  • @Kevin-zu4zl
    @Kevin-zu4zl 2 ปีที่แล้ว +8

    This is one of the best things anyone could do to a mobile/manufactured home. Upgrade the tub/shower with this brick style tile!

  • @Sean-Aviation
    @Sean-Aviation 3 ปีที่แล้ว +2

    Nice project but i wish there were more details on the process. where can i get this drain used in the video?

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      The bottom and the top piece of this drain came from home depot. I will try to do that on the next video.

    • @Sean-Aviation
      @Sean-Aviation 3 ปีที่แล้ว

      @@SuperVPro Maybe you can add a link? that would be great. I like it.

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      @@Sean-Aviation this is the store sku 1003560554

    • @Sean-Aviation
      @Sean-Aviation 3 ปีที่แล้ว

      @@SuperVPro Cool, thanks!

  • @cruzgonzalez1737
    @cruzgonzalez1737 9 หลายเดือนก่อน

    How much did this remodel cost? Thanks.

  • @bobkeps2095
    @bobkeps2095 3 ปีที่แล้ว +62

    30min tear out lol. 2 days? Even funnier... Set up, clean up, material pick up, grout, fixtures install, prep and paint, and glass doors is over 2 days. I'd even be surprised if u got demo, plumbing rough, wall board, wateproofing, tile layout, and tile install done in 2 days. Its nice work, no need to embellish.

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว +37

      All the materials was purchased and picked up in advanced. You tend to learn how to do things very quickly after 20 years of practice.

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว +11

      I appreciate your comment.

    • @bobkeps2095
      @bobkeps2095 3 ปีที่แล้ว +12

      @@SuperVPro but that's time. I prefab most of my built ins off site, but I just don't count time on site. And you cut away when hard stuff gets done(niche,etc). Why only reply about material pick up, and no reply about paint, fixtures, finish plumbing, glass, etc? We both know any self respecting glass guy won't take final measurements and cut until tile is installed. And quickest turn around would be couple days by itself, more often than not at least a week. But then again I've only been doing this 18 yrs, so what do I know?

    • @bobkeps2095
      @bobkeps2095 3 ปีที่แล้ว +1

      Ps doing all paint prep and 1st coat finish before tile install saves a ton of time not worrying about nice new tiles. And less ugly brushstrokes near cuts. Looks better, cuts time, and easy 15min touch up on way out the door

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว +6

      @@bobkeps2095 Paint was sprayed after everything was done and the glass is from 101 building supply its prefab. Thay have like 5 sizes. I will post a video about it when I get a chance.

  • @coreyminor9065
    @coreyminor9065 9 หลายเดือนก่อน

    What color grout did you use?

  • @josedavidrivera2112
    @josedavidrivera2112 2 ปีที่แล้ว +1

    Great video. Can you say the cost of the materials ?

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว +1

      About 6900

  • @robl496
    @robl496 11 หลายเดือนก่อน

    I don’t do tiles or plumbing but I just wanna know why there is not space between the tiles. Isn’t that a rule spacing the tiles when you do this kind of work?

  • @HisNameIsDavid
    @HisNameIsDavid 3 ปีที่แล้ว +3

    Amazing video. I was wondering, what type of tiles did you use in for the shower?

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว +1

      The back tile is idol tear gray 12x24 and it's from floor and decor. The side are 3x6 from home depot.

  • @BusaFurian
    @BusaFurian 2 ปีที่แล้ว

    Super video!!!
    Where did you get the glass doors?

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว

      101 building supply.

  • @behzadshahrasbi3904
    @behzadshahrasbi3904 2 ปีที่แล้ว

    Hi Ace, great design. where are you located? Do you do bathroom remodeling in the SF Bay Area?

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว +1

      We are in Sacramento. I have done some work there.

  • @dextershutt1716
    @dextershutt1716 3 ปีที่แล้ว

    I have absolutely no clue what I just witnessed here!!! You are a hard working beast of a man but that shower will definitely not last

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว +1

      It will only last 50 to 60 years.

    • @dextershutt1716
      @dextershutt1716 3 ปีที่แล้ว

      Sure it will!!! Great job

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว +1

      @@dextershutt1716 thank you

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว +1

      @@dextershutt1716 I have had one shower fail in 20 years and it was not done by me

  • @aonforme3455
    @aonforme3455 ปีที่แล้ว +1

    Excellent!!! Tip for DIY'er - Consider doing back wall of shower (part you see looking directly into shower) first. It helps hide potential uneven butts/gaps (tile meeting point) and cleans up the visual look.

  • @robertm.x1108
    @robertm.x1108 2 ปีที่แล้ว

    So the material you put on the floor before the thin set is called grout?

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว +1

      Mud if you are talking about shower floor.

  • @patbiat929
    @patbiat929 2 ปีที่แล้ว

    What kind of cement and sand you put on wall?

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว +1

      It is called fat mad witch is 3 sand 1 cement 1/2 clay.

  • @tryan7
    @tryan7 ปีที่แล้ว

    I realize you did most of the yourself. What was the total cost for this job? If you don't mind me asking. Great work. Thanks.

  • @Sharon-f7n
    @Sharon-f7n 10 หลายเดือนก่อน

    How much did it cost you? If I have someone do this how much should I pay them to do this for me?

  • @Pprecisionautodetail
    @Pprecisionautodetail 2 ปีที่แล้ว

    My bathroom is the about the same size and pretty much identical style, what would something like this cost?

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว

      About 20k Is dependent on where you are located and who is doing it and how it's done of course.

  • @lvtflooringstore7687
    @lvtflooringstore7687 2 ปีที่แล้ว

    that accent wall tile looks nice

  • @melav1407
    @melav1407 ปีที่แล้ว

    What size is the whole bathroom? Could I do the same in a 4 by 12 size space room ?

    • @SuperVPro
      @SuperVPro  ปีที่แล้ว

      It about 5x9 you could no problem.

  • @miltonmartinez6811
    @miltonmartinez6811 2 ปีที่แล้ว

    I am planning to do mine. pretty much same size as yours. How much money you think I will spent in Materials only? Thank you!!you did amazing job!

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว

      About 8 k . Thank you

  • @noesanchez3542
    @noesanchez3542 3 ปีที่แล้ว

    O like to know where are you located because here where i live the prep work is so much different

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      We are located Sacramento California

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      This was more common about 10 your ago. and was the only way was done. Thing have changed with new products being push to the contractors .

  • @miltonmartinez6811
    @miltonmartinez6811 2 ปีที่แล้ว

    What are the standard demension for a Shower if you built it?

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว

      32 each by 60 each.

  • @vivinthomas1
    @vivinthomas1 10 หลายเดือนก่อน

    What is the name of the paper he is using on the wall

  • @b3arwithm3
    @b3arwithm3 2 ปีที่แล้ว

    Isn’t it simpler to use cement board and tile directly over?

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว

      It seems simpler but it's very cumbersome and takes up way more time.

    • @b3arwithm3
      @b3arwithm3 2 ปีที่แล้ว +1

      @@SuperVPro I can't see how applying mud to the whole wall is faster than taping the seams

  • @lukestevenson7358
    @lukestevenson7358 3 ปีที่แล้ว +2

    Great job. I’m guessing you don’t have to put cement on the back of the small tiles?

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      Thanks for the comment Luke. 👍

  • @newwavetrading
    @newwavetrading ปีที่แล้ว

    Awesome video. Is slowly building my confidence to do my own bathroom.

    • @SuperVPro
      @SuperVPro  ปีที่แล้ว +1

      That's sounds awesome. You can do it!

    • @newwavetrading
      @newwavetrading ปีที่แล้ว

      @@SuperVPro thank you 🙏🏼

  • @samwilson6033
    @samwilson6033 5 หลายเดือนก่อน

    that wavy lined back splash looks like water, water lines. waves

  • @T.E.P.
    @T.E.P. 3 ปีที่แล้ว +11

    yeah man!!! love it! new sub right here ... love that plaster

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว +2

      Thanks bro.

    • @franksanches5813
      @franksanches5813 3 ปีที่แล้ว

      Sorry Completely Wrong you step on the liner with Cement

    • @scRUAM
      @scRUAM 3 ปีที่แล้ว

      $15,000 for that job.

  • @johnnynunez6300
    @johnnynunez6300 2 ปีที่แล้ว

    What kind of thin set is this guy using?

  • @mikeangelo760
    @mikeangelo760 3 ปีที่แล้ว +1

    What did you use for the floor before thin set?

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      Just cleaned it of dust so the thin set Is bonds better.

  • @maxcopple8187
    @maxcopple8187 ปีที่แล้ว +1

    Great job other than creating an "s trap" when you moved the drain. That thing your calling a sweep is a combo. The short sweep on the Sanitary tee is designed like that on purpose. It prevents the trap from siphoning dry when the shower is draining. Honestly it shouldn't be a problem because the shower will drain much less water volume than the previous tub did. However in the future if you use a combo in place of a sanitary tee on something like a tub it will be an issue causing sewer smell if they ever fill up the tub and drain it. Bathroom looks great though. The work including the plumbing is really clean.

    • @SuperVPro
      @SuperVPro  ปีที่แล้ว +1

      Thank you so much I appreciate your insight I did re do that part after Realizing.

  • @jenniferjaynelavealevi7276
    @jenniferjaynelavealevi7276 ปีที่แล้ว

    What were the measurements for the cement boards'walls?

    • @SuperVPro
      @SuperVPro  ปีที่แล้ว

      No cement board old school chicken wire and float. Cement board is more of DIY homeowner thing.

  • @dinero306
    @dinero306 ปีที่แล้ว

    How do you make it slope properly so the water drains

    • @SuperVPro
      @SuperVPro  ปีที่แล้ว +1

      Most of the time I use my eye and the level to make sure it slopes.

    • @dinero306
      @dinero306 ปีที่แล้ว

      @@SuperVPro do you slope the ground below it also or just the tiles?

  • @superflyp0
    @superflyp0 2 ปีที่แล้ว

    GREAT IT IS SET UP JUST LIKE MY BATHROOM 🤭🤠LOVE THE SPACE IN THE WALL STEALING THAT ONE.. THANK 😊

  • @AliSwanson1728
    @AliSwanson1728 ปีที่แล้ว

    No back butter on the tiles?

    • @SuperVPro
      @SuperVPro  ปีที่แล้ว +1

      The tile was not installed on any kind of fabric it was installed on wet mud so they had enough moisture to inhere perfectly. Usually it is a good thing to back butter if the job is taken really slow and the things that on the back and start interrupting dry out . That whole shower took about 3 hours to tile all of the walls. After 23 years I think I got the hang of it. Thank you for the comment though!

  • @quentinm5981
    @quentinm5981 2 ปีที่แล้ว

    Why did you decide to do the walls first then the shower floor? What if the grout fails in the corners and water gets down to the pan. I did not see a pre-slope. And do you not like to use cement board? Just curious not a hater

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว +1

      This is a different system that we use over here in California that last 80 years. The water is supposed to go under the tile whatever does not make it into the drain and there is weep holes underneath that mud so cracked grout or not no problem at all.

    • @quentinm5981
      @quentinm5981 2 ปีที่แล้ว

      @@SuperVPro ok got it. Thanks!

  • @bereal5079
    @bereal5079 2 ปีที่แล้ว

    Where can I buy the shower door?

  • @domenicm16
    @domenicm16 2 ปีที่แล้ว +1

    Interesting video. I am remodeling my bathroom at home and I was wondering, what is the make/model of the shower door you used for this shower? I would like to buy the same one!

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว +1

      This shower door came from 101 building supply in Sacramento California you can call them up and see if they can ship it.

  • @marklangkamp3151
    @marklangkamp3151 3 ปีที่แล้ว

    Is the wall tile suppose to be put into the the pan? I thought the pan was tiled first then walls with a little gap between so water wouldn’t be sucked up wall. I’m just a DUYer asking.

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว +1

      It can be done either way some people prefer one way some another the biggest reason why I do it this way because I do a shower in A-day .And when I started 20 years ago this is the way the old school guys did it as well. And I've never had to repair one of those showers.

  • @farrahandireland3244
    @farrahandireland3244 2 ปีที่แล้ว

    Did you put the chicken wire on the wall too or just in the shower for the tiles?

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว +1

      Yes all the walls that are tiled were chicken wired and floated.

    • @farrahandireland3244
      @farrahandireland3244 2 ปีที่แล้ว

      @@SuperVPro also is that just normal drywall you put that paper on and did you use any plastic lining anywhere in the walls?

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว

      @@farrahandireland3244 It's purple board designed for wet areas but we did use waterproof paper aqua Bar b and fortiflashi where needed for walls only.
      Floor is pen linner.

  • @debbiem6637
    @debbiem6637 3 ปีที่แล้ว +1

    This is exactly same layout as our mini home bathroom. Do you know what it all cost?

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      Ware are you located?

  • @armandomadrigal9793
    @armandomadrigal9793 3 ปีที่แล้ว +7

    it looks like you used a 2 inch comby for your drain, instead of a sanitary tee

    • @silver20237
      @silver20237 3 ปีที่แล้ว

      Lol

    • @surfviking2798
      @surfviking2798 3 ปีที่แล้ว

      He’s definitely not a plumber lol but other then that it looks good

  • @algreen5559
    @algreen5559 3 ปีที่แล้ว +6

    Sorry new to this but was wondering what happens if you want to change the tile on the wall? Since you didn't build the pan first. Looks great though. Could you layout the tile next time?

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว +4

      Its very easy to bust out the floor without damaging the shower Pan. That is the reason for using deck mud water Goes through it to weep in the drain and easy to break it out without damaging Pan liner.

  • @Laylaadam69
    @Laylaadam69 ปีที่แล้ว

    How much cost the whole bathroom ? Thanks

    • @SuperVPro
      @SuperVPro  ปีที่แล้ว

      About 18 to 24 thousand. That would be a great deal for you. Others companies would charge 35k witch is still a good cost.

  • @laprepper
    @laprepper ปีที่แล้ว

    What are those grout free tiles?!

    • @SuperVPro
      @SuperVPro  ปีที่แล้ว

      It is not grout free but really small grout lines.

  • @mitty2575
    @mitty2575 3 ปีที่แล้ว +6

    Love the shower tile, would be nice to have links for supplies used.

  • @pablorivera2864
    @pablorivera2864 3 ปีที่แล้ว

    So just that backing paper is your water proofing?

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      Yes that's only for the walls but the Pan is 45mil linner good for 40years and it will tack all the Shrinking and expanding. Is something that regard or any other roll on waterproof in waterproofing cannot.

  • @femoy2088
    @femoy2088 ปีที่แล้ว

    Beautiful Done Job

    • @SuperVPro
      @SuperVPro  ปีที่แล้ว

      Thank you very much!

  • @hesbonmuthee3155
    @hesbonmuthee3155 2 ปีที่แล้ว

    What's the stuff you use to stick the tiles

  • @FernandoRodriguez-ds5ri
    @FernandoRodriguez-ds5ri 2 ปีที่แล้ว

    Why not centered the drain

  • @eduardoamillan1686
    @eduardoamillan1686 2 ปีที่แล้ว

    Beautiful bathroom design!! How wide is the bathroom/shower area. Five fee? My bathroom appears to be the same size as yours. I want to include a shower door exactly like the one you installed but I didn't think the door would clear the front of the toilet. You managed it, though! May I ask which toilet brand/model you used? Thank you for the inspiration!

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว +1

      Since then I have installed a newer toilet with a wash and I still have no issue clearing the door.

    • @eduardoamillan1686
      @eduardoamillan1686 2 ปีที่แล้ว

      @@SuperVPro Thank you. Is the shower floor hexagon tile from Floor and Decor, too? Thanks again!

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว

      @@eduardoamillan1686 yes it is.

  • @alexandrclimov2980
    @alexandrclimov2980 3 ปีที่แล้ว +2

    Looks great! what is the approximate cost of such a project?

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      The price has a lot to do with your location.

    • @dustyflair
      @dustyflair 3 ปีที่แล้ว

      for 3 for by 5 foot 7 foot up the wall is approx $1500 in material.

    • @servicer1984
      @servicer1984 3 ปีที่แล้ว

      In canada i would guess all in around 15-20k cause prices are crazy here

  • @bogdankovalov3018
    @bogdankovalov3018 3 ปีที่แล้ว

    u didn't space subway tile on a ways at all ? is beveled edge act like a spacer for grout to sit in ?

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      If you look at the pice you will understand sorry but I can't send you a pic on here.

    • @bogdankovalov3018
      @bogdankovalov3018 3 ปีที่แล้ว

      @@SuperVPro all Im asking if tile go side to side without any spacing in between ?

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว +1

      @@bogdankovalov3018 100% no spacers unless that is a look you are going for .

  • @felixvalle1268
    @felixvalle1268 2 ปีที่แล้ว +1

    Really nice job

  • @ajamccoy275
    @ajamccoy275 3 ปีที่แล้ว

    What is the bathroom Length and Width. Interested in doing something like this in my bathroom!

  • @foreverxchae6353
    @foreverxchae6353 2 ปีที่แล้ว

    Amazing job! Excellent quality of work..can you come do my bathrooms? Lol

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว

      Thank you so much!

  • @andrea_gaspard
    @andrea_gaspard 3 ปีที่แล้ว +2

    Where did you get the drain?

  • @unitymixer
    @unitymixer ปีที่แล้ว

    Why no space between the tiles?

    • @SuperVPro
      @SuperVPro  ปีที่แล้ว

      The tile has the lip on it already.

  • @shapourshamss
    @shapourshamss ปีที่แล้ว

    Hi are you working in Long Island NY,I love your work and I want walking shower for my house .thanks

    • @SuperVPro
      @SuperVPro  ปีที่แล้ว +1

      I would love to help but I'm I'm california. Call me if you ever move down to are beautiful state.

    • @shapourshamss
      @shapourshamss ปีที่แล้ว

      @@SuperVPro will do ,thanks

  • @baikalservices
    @baikalservices 2 ปีที่แล้ว +1

    Jack off all trades Master of none. Good job.

  • @h2oskier32
    @h2oskier32 2 ปีที่แล้ว

    Beautiful shower. Nice and efficient work! May I ask what you would typically charge for a renovation job like this? Thank you!

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว

      Yes it would be about 19000 with material.

    • @rorymurphy27
      @rorymurphy27 2 ปีที่แล้ว +2

      lol the way he did that .. $5000

    • @SuperVPro
      @SuperVPro  2 ปีที่แล้ว

      @@rorymurphy27 how do you figure and what country are you in ?

  • @pjjhawaii
    @pjjhawaii 3 ปีที่แล้ว +2

    Nice job. Looks great.

  • @Alphasig336
    @Alphasig336 ปีที่แล้ว +1

    I’m 6’5 and I’ve never had water come up to me but water always falls down to short people. I put all my shower heads at 7’

    • @SuperVPro
      @SuperVPro  ปีที่แล้ว

      Lol I like the high as well .

  • @djkiraa87
    @djkiraa87 3 ปีที่แล้ว

    where can i find a waterfall edge vanity like this in or around Riverside California

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      It is 100% handmade by by using a prefab countertop. Just find a competent stone fabricator and he should have no problem at all. Hope that helps.

  • @desrickgurule2871
    @desrickgurule2871 3 ปีที่แล้ว +2

    THAT WAS AMAZING, NICE JOB!

  • @Mephistopheles0929
    @Mephistopheles0929 3 ปีที่แล้ว +2

    Excellent work and ideas🔥

  • @brandonzhoff5323
    @brandonzhoff5323 2 ปีที่แล้ว

    What’s the budget for this kind of job?

  • @rstroud2623
    @rstroud2623 3 ปีที่แล้ว +2

    *this is a great video Thank you for sharing it How big was the bathroom total like floor space How wide how long?*

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      Thank you it was 5x9

  • @shanesmaineshop
    @shanesmaineshop 3 ปีที่แล้ว +4

    Great remodel thanks for sharing.

    • @Thetimberteam
      @Thetimberteam 3 ปีที่แล้ว

      Can you be so kind and check out our latest remodel??

  • @Sayfeijai
    @Sayfeijai 2 ปีที่แล้ว

    Why didn’t you put redguard / waterproof membrane on your walls ???

  • @Topazpm20
    @Topazpm20 3 ปีที่แล้ว

    Would like to know why you didn't use cement board on the walls.. I've never seen paper, mesh and cement plaster on walls.

    • @SuperVPro
      @SuperVPro  3 ปีที่แล้ว

      That is more like diy style install what we do it professional installation that would last.

  • @TheTF01
    @TheTF01 3 ปีที่แล้ว

    Did you grout the side wall tiles? If not how does that work?