I work for the steel erection company who has built the steel frame and mega structure, we have topped out this week at level 52 but we still have a bit to finish where the crane was on the west side. Its a great building which will stand out among all the building surrounding it. What a design it is!!! glad Ive worked on it!!!!!!!
if by floor you mean megalevel then the 3rd megalevel is just about complete and the 4th has just begun meaning they are 3\8ths through and main construction began in mid february almost 6 months ago so i think it should be around another 10 - 12 months but you never know occasionally we get surprises!
Yeah it is great - I can see it going up down the end of my road. Now the Gherkin has a slanty side in silhouette. Presume you worked from the same BIM or other digital model as Laing provided by Rogers...
I work for the steel erection company who has built the steel frame and mega structure, we have topped out this week at level 52 but we still have a bit to finish where the crane was on the west side. Its a great building which will stand out among all the building surrounding it. What a design it is!!! glad Ive worked on it!!!!!!!
I love this building so much ❤
Simply masterpiece !!! A very challenging skyscraper to construct within such a tiny place. BRAVO & Congratulation to the construction team.
what software they use for the 4D simulation?
Great job, well done Steve Forbes, for getting it sorted.
Why the flanges of exoskeleton are so thick? Does anyone know? Thanks!
anyone know the timescale of construction!? its around 30 floors atm, so shouldn't b too long until it tops core.
They are up to the 5th floor now arent they? they were last week, so that leaves about 3 months, ample time for steel workers
it's really great - looks like the last "tables" are going on. After the steel frame?
When will this building complete?
if by floor you mean megalevel then the 3rd megalevel is just about complete and the 4th has just begun meaning they are 3\8ths through and main construction began in mid february almost 6 months ago so i think it should be around another 10 - 12 months but you never know occasionally we get surprises!
Pardon the off topic remark, but does anyone know the title of the song at 9:30 ?
It's "Darude - Sandstorm".
It's definitely not Sandstorm.
At last, after many years... it's "Walking on air (a)" from the album "Voicing the classic Part 3".
Yeah it is great - I can see it going up down the end of my road. Now the Gherkin has a slanty side in silhouette. Presume you worked from the same BIM or other digital model as Laing provided by Rogers...
Ali, What software did you use to create the animation??
Not yet.....
I came here for some help with a future minecraft build, I was not disappointed. I build 1:1 scale so this is perfect, thanks ^^
Will you post this on TH-cam?
The framework should be complete by this december.
i doubt that, construction so far doesnt seem to connect with that prediction :/
just beautiful,, true LOR style!
good job
sorry 'megaframe' not megalevel lol
True
gREATV - but without this TERRIBLKE background music (well - I wouldn't call it music ...) it would be even BETTER !!!