TN Government அறிவித்த ECR-OMR Link Road Scheme! | Oneindia Tamil
ฝัง
- เผยแพร่เมื่อ 17 ต.ค. 2024
- Periyar Maniammai Institute of Science And Technology For Admission: pmu.edu/
#TNGovt #TNAssembly #ECRRoad #OneindiaTamil
~PR.55~CA.37~HT.302~ED.72~
Join Telegram: t.me/oneindia_...
To Subscribe Oneindia Arasiyal - / @oneindiaarasiyal
Oneindia Howzat Facebook : / oneindiahowzat
Oneindia Infinity Facebook : / oneindiainfinity
Like and Follow us on:
Facebook : / oneindiatamilvideos
Twitter : / thatstamil
Instagram: / oneindiatamilofficial
Linking of ECR-OMR-GST Road-Chennai ByPass-ORR-CPRR will be ultimate solution for connectivity
25 வருஷம் ரோடு போடுவனுங்க....
It was announced in 2014, paapom 2039 kulla mudipaangalanu
Triruporur to ecr broad road
எவ்வளவு திட்டம் வந்தாலும் மாறாது
இதுல எவ்வளவு கொள்ளை அடிக்க போரானுகளோ
Who's accountable for road conditions? Nobody in the govt? Has TN govt prepared all road 2 reduce flooding in low lying areas during rains? We are already in June.
Eggatur (navalur) omr to mayajal very very close
Chennai..😢😢😢..but hyd connectivity better than chennai..hyd has clean n Regional ring road which is absolutely world class infrastructure
மாராது மதராசு
Omr to neelangarai
These are all narrow roads which is not suitable for 2way traffic. Already existing narow bridges allow only oneway traffic at a time. These iron bridges will only replace those bridges but the connecting roads will still remain narrow and traffic will choke. Very very unprofessional news reporting to call these as link roads to reduce traffic and save fuel
Besant nagar broken bridge santhom to besant nagar
எத்தனை சாலைகள் வந்தாலும் சத்தம் குறைய வில்லை, flyover city, இந்த omr- ecr இணைப்பு 8 வருடமாக வரும் செய்தி
200 feet radial road to ecr , project failed
Use only for baashyaam
Chennai is nothing when compared to Hyderabad
தெருவோர கடைகள்,குப்பைகள் நிறைந்த நரகம்
Earthquake coming 😂
Kettu kettu aluthu pochu bro😂😂😂😂😂😂🤦🤦🤦🤦🤦
Kuppaya allungada......
Tamil mella sagum, one India tamil moolam. Title ah ithu 😂
Dei mental..these are small roads before after tirumaniyur to turaipskkam..
Did u not even see the map..
Big one where one side on omr they laid but other side on ecr land acquisition is not done and also not approved by water body for design flaws..
Simply putting some news without showing the actual map where the bridge is coming