QA/QC Engineer Reacts on Slump Test and Concrete Pouring

แชร์
ฝัง
  • เผยแพร่เมื่อ 3 ต.ค. 2024
  • Here is a new vlog entiled "QA/QC Engineer Reacts on Slump Test and Concrete Pouring." This to ensure that proper procedure of concrete test and concrete pouring. Subscribe here tinyurl.com/QA... for more free videos.
    Enroll in Our Course:
    QA/QC Engineers Academy (Online Course)
    Register here: tinyurl.com/qa...
    Subscribe to my channel: tinyurl.com/QA...
    Visit my blog:
    www.qualityeng...
    www.civilengin...
    Visit my Product Store:
    payhip.com/Qua...
    Follow and like
    Instagram: tinyurl.com/QE...
    Facebook: tinyurl.com/QEGFb
    If you have inquiries please contact us at qualityengineersguide.com
    Join our Fb group: tinyurl.com/qa...
    Thank you for watching!

ความคิดเห็น • 34

  • @youtubersfunnyfunny5793
    @youtubersfunnyfunny5793 4 ปีที่แล้ว +1

    Napakadetailed ng explanation sa slump test nato. Tiningnan ko talaga procedure nyo sir para sa susunod i apply ko,hehe.

  • @be-honestindian3054
    @be-honestindian3054 4 ปีที่แล้ว +1

    Every video has a unique ...knowledge ,experience...

  • @angelicajoyrosario6765
    @angelicajoyrosario6765 3 ปีที่แล้ว

    Thank you sa video niyo Sir hope you'll continue sharing this kind of videos it is really helpful for us. ❤️

  • @amradel5831
    @amradel5831 2 ปีที่แล้ว +2

    there is a notice
    every layer should be the third of the volume not the height according to astm

  • @jradmaynor2011
    @jradmaynor2011 ปีที่แล้ว +1

    1 inch penetration with rod into previous layer is practiced and acceptable in Florida

  • @arifihamdanihardi7499
    @arifihamdanihardi7499 3 ปีที่แล้ว +1

    Salute, I like your share video about QA/QC Engineer and I have done like and subcribe these Video about QA/QC Engineer. I am QA/QC Engineer also from Indonesia. nice to watching your QA/QC Engineer Video👍

  • @mohammedanees1187
    @mohammedanees1187 4 ปีที่แล้ว +2

    So the cone test and cube test should be done from each and every RMC trucks which come for poring the concrete . Thanks ur work is really good. Sir

    • @qualityengineersguide
      @qualityengineersguide  4 ปีที่แล้ว +1

      Slump test is done for every truck but the cube test is done as per your specification.

    • @mohammedanees1187
      @mohammedanees1187 4 ปีที่แล้ว

      Thank you. Sir.. so how much should we need to take cubes in 1k cubic meter...?

    • @qualityengineersguide
      @qualityengineersguide  4 ปีที่แล้ว +1

      @@mohammedanees1187 It depends on your specification and if not in the specification you can ask your consultant. There is also frequency in taking cube samples for the specific concrete elements that is why it is better to always refer to your spec. You can find my blog post on my website about the frequency of tests. But in normal concrete, the range is 50 to 100 cubic meters is one set.

    • @mohammedanees1187
      @mohammedanees1187 4 ปีที่แล้ว

      @@qualityengineersguide Ok thanks sir

  • @mdibad5028
    @mdibad5028 5 หลายเดือนก่อน

    What is the min. Height we should get(from bottom of rod to top of conc. Level After slump cone is removed) to pass the Conc. Mix Quality?

  • @christonalmighty
    @christonalmighty หลายเดือนก่อน

    You do not feel the slump cone by height due to the diameter getting smaller towards the top. It is to be done in 3 parts of the same amount of concrete that does not mean the same height. Further more you do not tell the technician how to do their job you only say yes or no to the test.

  • @archcuizon4726
    @archcuizon4726 4 ปีที่แล้ว +1

    Hi Engr! How long should a vibrator stay in one place? How deep should a vibrator be in a certain area? Should it be placed up to the bottom of the raft or just in a given depth?

    • @qualityengineersguide
      @qualityengineersguide  4 ปีที่แล้ว +1

      Well in practicality, we are using the vibrator to remove the air from it so that's the clue when there are no more air bubbles coming up then you can remove the vibrator but that process would not longer than 10 seconds then transfer the vibrator into the other unvibrated concrete. The spec sometimes said ""vibrate the concrete every 400mm depth of layer" so it is always advisable to refer to your spec. There is no question when you reach the bottom or the concrete substrate if you are casting the first layer but not on the second layer and so on..

    • @archcuizon4726
      @archcuizon4726 4 ปีที่แล้ว

      @@qualityengineersguide Thank you Sir..

    • @qualityengineersguide
      @qualityengineersguide  4 ปีที่แล้ว

      @@archcuizon4726 Welcome.

    • @pipeds9979
      @pipeds9979 ปีที่แล้ว

      @@qualityengineersguide so should we wait for the concrete to fill a certain layer before vibrating it? then after reaching another layer, another vibration will be done rather than letting it stay or rotate on that area on the whole pouring process?

  • @JP-sf5ti
    @JP-sf5ti 4 ปีที่แล้ว +1

    Thank you Sir

  • @BufoZilla
    @BufoZilla 2 ปีที่แล้ว +1

    It's actually 1/3 of the volume

  • @imrankalathingal6444
    @imrankalathingal6444 4 ปีที่แล้ว +1

    Sir your video is so informative. How to actually get placed in qa qc position in a company. I am about to graduate.

    • @owaisaslam2945
      @owaisaslam2945 4 ปีที่แล้ว

      How are you Sir I am your student i really appreciate your work and teaching way . Here is one confusion i have read in a book about slump test that we pour 4 successive layers
      Bcuz of it confusion i hope you can solve problem .

    • @qualityengineersguide
      @qualityengineersguide  4 ปีที่แล้ว +3

      @imran kigi First, get experience, even with a not so big salary. You are at the stage of building your experience. Because sooner or later you will be paid based on your experience.
      You may share this video with your favorite social network. Thanks for your question. You can also read my blog found in the description of this video.

    • @qualityengineersguide
      @qualityengineersguide  4 ปีที่แล้ว

      @@owaisaslam2945 In a row of pouring? It happened to us when we had a huge concrete pouring on raft foundation. We got a 3k cubic meter of concrete in one pouring, which was 3 days continuous pouring. We got one huge wall along the side of one of the rafts it was 4m height 40 m length and 2.5m width so it was cast in layers.

  • @johncane2304
    @johncane2304 2 ปีที่แล้ว

    may tanong ako sir anong difference nang qa/qc engineer at concreting engineer

  • @vimkiarallanita3575
    @vimkiarallanita3575 3 ปีที่แล้ว

    Hi Sir. If you compact it the 1/3 of the height will decreased. Should I need to reached the 1/3 of the ht before filling the cone again? Should i need to add another count of rodding?

  • @christonalmighty
    @christonalmighty หลายเดือนก่อน

    10 seconds is wrong on the pulling the astm is 5 seconds ×/- 2

  • @christonalmighty
    @christonalmighty หลายเดือนก่อน

    You do not test from top of the concrete you test from the center or displaced center

  • @anjax8069
    @anjax8069 11 หลายเดือนก่อน

    boring nmn