Tile Shower Build...WHAT FIRST??? --- Heated Floor, Backerboard, Linear Drain and Waterproofing

แชร์
ฝัง
  • เผยแพร่เมื่อ 14 ต.ค. 2024
  • When doing a tile shower, there is an order of operations that needs to be followed to ensure a successful building process. There are many components in a shower; waterproofing, walls, floors, drains, and in this case a Ditra-Heat system. If you don't follow the correct sequence, failures can happen or you need to undo work that is already done.
    If you need help on your tile project, you can book time with me online here: www.tilecoach....

ความคิดเห็น • 106