Thanks, Walter! Unfortunately, I'm blocked from both Weed and Winnemucca by heavy snow this weekend, but it definitely looks like we're on track for over 100 PFJ sites open and powered up by the end of the year.
Thanks Walter! If you're open to suggestions, would you be willing to add a legend for the national map to show which each symbol means? It's a bit difficult to tell just looking at the map as well as understand that the new update list of stations you're referring to are newly opened, not newly spotted under construction.
Happy Thanksgiving, and for the valuable information you provide. My mother's side is American, I miss the trips to Louisville Ky & Detroit Mi. Ontario, Canadian
I visited the Flying J in West Memphis December 1st and posted a video about it. I did not do a review because of time restraints but I did talk about how horrible the road conditions are getting to it. With traffic and our situation I could not capture pictures of the road conditions but I used google maps to do the best I could.
Sweet. Just watched. Will call out on next PFJ update. Thinking will drop tomorrow night. I got a thing I do for church on mondays after work, but tomorrow I’m open and will likely crank out then.
@@thenetworkarchitectchannel Awesome! Your update videos are my favorite EV videos that anybody does. If Walmart eventually has L3 reliable chargers at most of their locations in the country then that truly would be life changing. At least in the south there is a Walmart within 10 miles of any spot haha. OK, hyperbole but not by much.
several are like that, sadly. However, the number of sites spotted is dwindling, so hopefully they will clear out their backlog and it will be on the list b4 12/31,
52 sites under construction. Hmmm. What do we think the timeline is from construction to go live? 6 mo? What are the chance that we get another 10-15 new sites open by EOY?
Walter -- I stopped at a Pilot at 3964 N Michigan Rd Shelbyville IN. I talked to the workers and they told me everything was installed, and awaiting hookup to the Power Company.
Thank you. I added a PlugShare station and will include on the next update citing you as the scr. Thx so much for letting me know.! They r really going big, it seems
Hope to see more GA, need cover on 75 N & S! GA is pitiful for any kind of true fast charging, hardly any Tesla level 3. Some Buc-ees won't let me charge at Tesla chargers😮💨
Thanks, Walter! Unfortunately, I'm blocked from both Weed and Winnemucca by heavy snow this weekend, but it definitely looks like we're on track for over 100 PFJ sites open and powered up by the end of the year.
Hey that's my pic of the Findlay, OH station charging my e-tron! Thanks for all the updates, and glad to have contributed in a small way :)
Very thankful for all the 2024 PFJ updates so far. Happy turkey day Walter. ⚡⚡
You as well. Stay safe out there.
Thanks Walter have a great Thanksgiving with family and friends?
U likewise
Great to see more sites in Winnemucca! More high power chargers in Nevada outside of the Reno and Las Vegas area are needed!
I agree. That one was a surprise to see. Good to see they are filling in gaps instead of just going for major metro. Thx for watching.
Belmont, OH is now open as well. Did a test charge yesterday.@ $0.52/kWh.
Thx! This team is on a terror!!!
Thanks Walter! If you're open to suggestions, would you be willing to add a legend for the national map to show which each symbol means? It's a bit difficult to tell just looking at the map as well as understand that the new update list of stations you're referring to are newly opened, not newly spotted under construction.
Great suggestion! Will do going forward. thx for the idea.
Minor correction. The one is Franklin, KY is $0.52/kWh per EVgo app and Pendleton, KY is $0.58/kWh per app.
Good point. I said all, but my brain was thinking about the 3 round Lexington. Thx for chiming in. U r right.
Happy Thanksgiving, and for the valuable information you provide. My mother's side is American, I miss the trips to Louisville Ky & Detroit Mi.
Ontario, Canadian
I visited the Flying J in West Memphis December 1st and posted a video about it. I did not do a review because of time restraints but I did talk about how horrible the road conditions are getting to it. With traffic and our situation I could not capture pictures of the road conditions but I used google maps to do the best I could.
Sweet. Just watched. Will call out on next PFJ update. Thinking will drop tomorrow night. I got a thing I do for church on mondays after work, but tomorrow I’m open and will likely crank out then.
@@thenetworkarchitectchannel Awesome! Your update videos are my favorite EV videos that anybody does. If Walmart eventually has L3 reliable chargers at most of their locations in the country then that truly would be life changing. At least in the south there is a Walmart within 10 miles of any spot haha. OK, hyperbole but not by much.
Thanks for the video, Walter!!!
Under construction here: Pilot Travel Center #494 in Rotterdam, NY.
Glad to see this "spree." Better get it done now, before the 2025 dystopia begins.
Wow! @time 0:50 Hockey Stick is right!
Exciting!!!
Sulpher Springs TX has been appearing to be ready for over three months. Sure wish they would open
several are like that, sadly. However, the number of sites spotted is dwindling, so hopefully they will clear out their backlog and it will be on the list b4 12/31,
@ Thanks. Have a Happy Thanksgiving Walter
The New Millford, PA site will be great for me. The Northern portion of I81 in PA is a charging desert.
I saw. Middle of NY state too looks like. Stay safe out there. Enjoy your holiday.
@@thenetworkarchitectchannel Yeah, anything North of Binghamton is dicey.
These are exciting times.
More EVs = Cleaner air!
I like clean air too.
52 sites under construction. Hmmm. What do we think the timeline is from construction to go live? 6 mo? What are the chance that we get another 10-15 new sites open by EOY?
at this rate, all but certain, I would say. Two more opened just since the update.
Walter -- I stopped at a Pilot at 3964 N Michigan Rd Shelbyville IN. I talked to the workers and they told me everything was installed, and awaiting hookup to the Power Company.
Thank you. I added a PlugShare station and will include on the next update citing you as the scr. Thx so much for letting me know.! They r really going big, it seems
Another week, no Mississippi. What the heck is going on there…
I am guessing a NEVI log jam. Not sure though.
No South Carolina either. It's definitely a NEVI issue in SC.
How many of these have to pull through chargers?
Not sure. That is not a stat I track, but all the canopy locations are in the deck at the end. Would just have to watch & count. Guessing about half
Hope to see more GA, need cover on 75 N & S! GA is pitiful for any kind of true fast charging, hardly any Tesla level 3. Some Buc-ees won't let me charge at Tesla chargers😮💨
sound awful. Stay strong. Help is on the way.
what app do I need to use the chargers?
EVgo, or just use the payment terminal