Very nice explanation Mohamed! Two questions from my side: 1)Is it possible all these 3 scheduling techniques to be deployed by an operator, depending on Ues' radio conditions, or only one can be deployed? 2) Do you know if the same techniques can be applied to VoNR? Thank you
Hi Georgi; thank you. Yes it is possible that the 3 features operates together; however you have to be very careful as the first two features related to PDCCH capacity improvement might brought some drawbacks to the network and required to be used in a very specific scenarios, regarding VONR question as per my knowledge yes these features will be available as well but this will need to be checked with the operating vendor
Great Video , very helpful
Thank you
Thanks a lot for the great info!
Thank you 🙏
Very nice ya Adawy 👍👏
Thank you 🙏
Very nice explanation Mohamed!
Two questions from my side: 1)Is it possible all these 3 scheduling
techniques to be deployed by an operator, depending on Ues' radio conditions, or only one can be deployed? 2) Do you know if the same techniques can be applied to VoNR?
Thank you
Hi Georgi; thank you. Yes it is possible that the 3 features operates together; however you have to be very careful as the first two features related to PDCCH capacity improvement might brought some drawbacks to the network and required to be used in a very specific scenarios, regarding VONR question as per my knowledge yes these features will be available as well but this will need to be checked with the operating vendor
@@mohamedeladawiashour Thank you very much for your prompt reply!