La Grange, KY Rail Replacement! 4+ Days into 37 Minutes! February 10 ~14, 2020

แชร์
ฝัง
  • เผยแพร่เมื่อ 11 ก.ย. 2024
  • Special Thanks to the Beautiful City of La Grange, KY, CSX and all its employees for the amazing teamwork, Engineers and Crew, members of Virtual Railfan, all of our Mods and the owners of Virtual Railfan for making this video possible!
    A HUGE thanks to Andy Work @ Laser Technologies for hosting these cams. We would also like to thank the City of La Grange for their assistance in this location. Visit their website: www.lagrangemai...

ความคิดเห็น • 312

  • @denisxx61
    @denisxx61 4 ปีที่แล้ว +106

    I watched the live feed of quite a lot of this replacement. One of the first observations was that there were a large number of white hats seemingly just standing around doing nothing. The more I watched the more I realized that it not what is seen that is important - it is the things not seen which matter. For instance there was never a work hold up because a piece of heavy equipment was at the wrong end of the site. Whenever a tool was needed it was readily available. Whenever a truck needed access there was always a clear pathway even though the workplace seemed cramped.
    Everything ran like a finely tuned clock and the work was completed on time. It became apparent to me that each one of those white hats had a specific job to oversee and if it was done properly then there would be no hold up and nothing unusual to see. A great job done by a finely tuned crew.I'll forever see the white hats in a different light.

    • @TheIndecisive0
      @TheIndecisive0 3 ปีที่แล้ว

      I don't think hard hat colour displays ones title at this particular company, see 19:00.
      Edit: At 22:45 we see an orange hard hat, but this is an employee of Holland, not CSX.

    • @57thorns
      @57thorns 3 ปีที่แล้ว +2

      Another way to say that is that you can probably do the work with half as many people, in three time the time.

    • @rizzeau
      @rizzeau 3 ปีที่แล้ว

      Not one of the 10+ people standing around with their hands in their pockets noticed the backhoe about ready to take out the wires at 4:00

    • @sweynforkbeardtraindude
      @sweynforkbeardtraindude 2 ปีที่แล้ว

      🤮🤮🤮🤮🙄

  • @flyerbob124
    @flyerbob124 4 ปีที่แล้ว +49

    The dump truck turning 90 degrees was amazing.

    • @jonruehle9186
      @jonruehle9186 3 ปีที่แล้ว +5

      @24:20

    • @vesubioromo9425
      @vesubioromo9425 3 ปีที่แล้ว +1

      Yeah. Never knew such a thing existed.

    • @fcentaur
      @fcentaur 4 หลายเดือนก่อน

      Very useful!

  • @pammcdan
    @pammcdan 4 ปีที่แล้ว +14

    Simply fascinating from start to end! I swear I could smell that asphalt being put down! And the law enforcement being first to cross, what a hoot!

  • @Handlesarestoopid
    @Handlesarestoopid 4 ปีที่แล้ว +38

    Amazing how they do this so well that trains can continue operations without any significant interference

  • @lampitl
    @lampitl 4 ปีที่แล้ว +34

    I loved it when the guys moved the tent with helmets on expecting of some sort of work to be done - only to see about 15 pizzas to arrive :D

  • @DDA40Xman
    @DDA40Xman 4 ปีที่แล้ว +12

    Thanks so much VRF staff who worked on this. I watched for the first 3 and a half days solid, more limited the rest of the project, and I'm still amazed at the ability of all that contributed. It was great to see my brothers in arms who provided protection for the general public and for the workers from traffic incidents, as I had done many times.

    • @paullindberg9230
      @paullindberg9230 2 ปีที่แล้ว

      YeahZ can't get rid of the z. You guys
      rock"!!! Like Eric Clapton and Jeff Beck together

  • @ticklemeandillhurtyou5800
    @ticklemeandillhurtyou5800 4 ปีที่แล้ว +5

    God bless our Railway workers they helped make America great😊👍🇺🇸

  • @stephen6532
    @stephen6532 4 ปีที่แล้ว +1

    THIS IS AN AWESOME VIDEO!!!!! I have always enjoyed watching construction projects since a little kid, now I am a big older kid and still enjoy, and from the comfort of my couch! Thank you!

  • @rogerhuber3133
    @rogerhuber3133 3 ปีที่แล้ว +1

    So much heavy machinery and work with great coordination among the various groups. Very interesting. Mechanization sure made quick work of this big job. All this happening while still allowing traffic to continue on the mainline. Awesome!

  • @tompaton1899
    @tompaton1899 4 ปีที่แล้ว +4

    That was a clever dump truck with a swivel box. They did a great job on the replacement of the track.

  • @RubsForeheadXTwo
    @RubsForeheadXTwo 4 ปีที่แล้ว +62

    4:05 That backhoe almost knocked out power to half of Kentucky.

    • @royreynolds108
      @royreynolds108 4 ปีที่แล้ว +5

      That is telephone and/or cable TV cables. Power lines are higher up if there at all.

    • @NSaw1
      @NSaw1 4 ปีที่แล้ว +6

      @@royreynolds108 But look at the poles when it happens, they bend a lot. If it had pulled much more it could've snapped the pole, that could've knocked out the power. (not to half of Kentucky) but to some.

    • @TheBob_
      @TheBob_ 4 ปีที่แล้ว +7

      @@Saucy-ws6jc r/woosh

    • @sapede
      @sapede 3 ปีที่แล้ว +2

      The cable was left sagging quite a lot.

  • @azsnarkf9707
    @azsnarkf9707 4 ปีที่แล้ว +34

    This should be on Modern Marvels. A job well done.

  • @stevel6761
    @stevel6761 4 ปีที่แล้ว +12

    24:20 Coolest dump truck ever!!

    • @briankeith5437
      @briankeith5437 4 ปีที่แล้ว +1

      Steve L Love it a dump truck bed that can do a 180

  • @VirtualRailfan
    @VirtualRailfan  4 ปีที่แล้ว +5

    Thanks to all involved, with our loyal members being "Number One"!

    • @BNSFBishop
      @BNSFBishop 4 ปีที่แล้ว +1

      Virtual Railfan yessir

  • @Chango_Malo
    @Chango_Malo 4 ปีที่แล้ว +56

    hope they saved the ties they clipped from the end of the flex track. They're great for filling in gaps at the ends of turnouts and stuff.

    • @trigstracks3800
      @trigstracks3800 4 ปีที่แล้ว +1

      I was just trying to make a flexitrack joke x'D

    • @rogerhornby1149
      @rogerhornby1149 4 ปีที่แล้ว +3

      Yeah, flextrack is now a prototypical practice. No more of that pesky spiking of miniature rails with miniature spikes in order to be "authentic."

  • @CohaLevelcrossingsChannel
    @CohaLevelcrossingsChannel 4 ปีที่แล้ว +5

    New tracks looking good !! Choo choo 🚂🚂🚋🚋🚋🚋🚋🚋🚋🚋🚋🚋🚋🚋🚋

  • @jaymuller
    @jaymuller 4 ปีที่แล้ว +1

    A deep rabbit hole but well worth it. I am always amazed at the efficiency of RR MOW gangs, fascinating.

  • @nathantzhang
    @nathantzhang 4 ปีที่แล้ว +5

    i like how the road is built on the rail and the tracks actually have everything a generic track has

  • @redstonerelic
    @redstonerelic 4 ปีที่แล้ว +4

    34:46 yay! we can go back home to our families now! its been nearly a week since we last saw them!

  • @Dive-Bar-Casanova
    @Dive-Bar-Casanova 4 ปีที่แล้ว +2

    What a really cool video. Now we want to visit La Grange.

  • @majobis
    @majobis 4 ปีที่แล้ว

    At 24.20 I do not think I have ever seen a rotating dump bed on a dump truck before.
    Kind of cool when you think about it. Just pull up to you spot, rotate the bed and dump your load and off you go. Perfect for those tight quarter deals when you cant move the truck around much. I know they have had side dumpers on trailers for years. This one is a first for me to see.

  • @bwcbiz
    @bwcbiz 4 ปีที่แล้ว +4

    Interesting how they used the old track to slide the new track into position before taking the old track out. At first you'd think it would be easier to remove the old track first, but the friction reduction makes the job go quicker the other way around.

    • @farmcentralohio
      @farmcentralohio 4 ปีที่แล้ว +1

      Plus they had to keep the rail line open to trains the whole time

  • @tomatoes3
    @tomatoes3 2 ปีที่แล้ว

    Wow what an interesting thing to watch , the skill of those drivers is top class .🇬🇧👍

  • @WA1LBK
    @WA1LBK 10 หลายเดือนก่อน

    I get a real kick out of how the real railroads have adopted a lot of model railroad practices! - I’ve seen “Snap Track” before, but I think this is the first instance I’ve seen of “Flex Track”! 😊 - Right down to knocking off excess ties & cutting the rails to exact length.
    That being said, impressive job! Considering the disruption that this work obviously caused to downtown LaGrange local businesses & traffic, using the “flex track” obviously sped up the process considerably. Also impressive was the way they managed to keep some train traffic through even as the construction proceeded. 😊

  • @carolynraley4047
    @carolynraley4047 2 ปีที่แล้ว

    Fascinating. I didn't know this is how they install railroad tracks these days! Thanks for your work!

  • @bengone3349
    @bengone3349 4 ปีที่แล้ว

    Quit an effort with incredible logistics done like a well rehearsed dance. Thumbs up to CSX and contractors.

  • @tompolacek3137
    @tompolacek3137 4 ปีที่แล้ว +1

    amazing to see the equipment pulling that 200 feet of track set up with ties

  • @Orxenhorf
    @Orxenhorf 4 ปีที่แล้ว +9

    The rotating dump truck was kind of cool. I am rather surprised they didn't use concrete ties though.

    • @SD40Fan_Jason
      @SD40Fan_Jason 4 ปีที่แล้ว +2

      Concrete ties require constant maintenance to prevent premature failure. Since the ties are going to be beneath 8 inches of pressed asphalt they needed a material that can flex with the stress and weather. Wood is the most likely material for the job.

  • @coinslotsandjoysticks2572
    @coinslotsandjoysticks2572 3 ปีที่แล้ว

    It's all done with equipment now. I worked for a company in the early 80,s that replaced and repaired tressels. We did everything by hand. That's why I'm in the shape I'm in now. Lifting heavy ties and rails every day. We were working on the Tressel behind the old grandad distillery in Frankfort ky at the forks of elkhorn creek. It's now jim beam and I slipped and fell 86 ft and landed in 9 ft of water. , I didn't even hit the bottom. I hit and went sideways in the water as I went down and it saved me everyone including myself thought I was dead , that was my last day working on Tressels. I never went back the next year they took the rails and the Tressel out that ran through frankfort to the old grandad distillery, frankfort lost 3 nice and very tall Tressels in the process, I still live about 3 blocks from the distillery in the forks of elkhorn and I miss the train horns every night goin to the distillery. It would echo in this valley forever, you could hear it bouncing off the mountains and back,😥😭💔

  • @georgeronn1263
    @georgeronn1263 4 ปีที่แล้ว +3

    Amazing job in such a short time. Obviously well coordinated and exceptional teamwork. I must confess that I am surprised that they did not bury concrete ties in the street as opposed to wooden ones.

    • @johnthompson941
      @johnthompson941 4 ปีที่แล้ว +3

      As a retired MOW worker my answer is, there is more maintenance required with concrete and is best used for high speed and high curve areas, for a low speed track that is buried under pavement the wood is more cost effective.

    • @atmrtwbike
      @atmrtwbike 2 ปีที่แล้ว

      @@johnthompson941 That answers my question, then. With such new track, I would have expected concrete sleepers.

  • @jeepnut1
    @jeepnut1 4 ปีที่แล้ว +18

    The trains that passed through around the 13 minute mark had the easiest passage ever through La Grange.

    • @Ianthe1
      @Ianthe1 4 ปีที่แล้ว

      Why?

    • @jeepnut1
      @jeepnut1 4 ปีที่แล้ว +2

      Ian 1 No cars or pedestrians to deal with.

  • @vtace1
    @vtace1 4 ปีที่แล้ว

    Seeing a Volvo VHD 36:36 go from factory production to real-life use makes this video that much better.

  • @tracksidescenery
    @tracksidescenery 4 ปีที่แล้ว +25

    As efficient as they made it, I can't imagine what a logistical nightmare that must have been

    • @Normal1855
      @Normal1855 4 ปีที่แล้ว +1

      Exactly. Especially with all the roads and business there.

  • @insertthecoinz
    @insertthecoinz 4 ปีที่แล้ว +7

    Great ending when the two police cars came along and cross and sirened in celebration

  • @tomy.1846
    @tomy.1846 4 ปีที่แล้ว +4

    Looked like my old train set in my basement! Cool! :)

    • @jhonditch4269
      @jhonditch4269 4 ปีที่แล้ว

      same who knew they had track sections like that.

  • @trackandtrail1
    @trackandtrail1 4 ปีที่แล้ว +2

    Cool Stuff! Awesome video! Love me that dump truck!

  • @tvjeff74
    @tvjeff74 4 ปีที่แล้ว

    THNX a lot for this!!!! To watch this condensed was AMAZING!!! Were all railfans ,,But take for granted sometimes the MOW crews and the work they do!!! Great stuff

  • @davecrable1356
    @davecrable1356 4 ปีที่แล้ว +4

    Great job VRF staff! And only one casualty through the entire job - poor Stop Sign...

  • @fatlarry1184
    @fatlarry1184 4 ปีที่แล้ว +1

    Luv those street-level views at the end.

  • @SD40Fan_Jason
    @SD40Fan_Jason 4 ปีที่แล้ว +1

    That's such an impressive orchestration of equipment and materials! The panel in, panel out process is so cool. I doubt they put that old track in like that.

  • @lcflcf1
    @lcflcf1 4 ปีที่แล้ว +1

    All the best for these "soldiers" working in hard conditions for the society. Today they are forgotten and not recognized.

  • @paullindberg9230
    @paullindberg9230 2 ปีที่แล้ว

    It is amazing ,All that equipment made specifically for every step or
    should I say "job" That it takes to
    Transform old and pounded to new
    and smoothie and safe
    I can say as a former Conrail train
    crew"It's like night to day"!!!

  • @tlfreek
    @tlfreek 4 ปีที่แล้ว +68

    so lucky the backhoe didn't snap that electrical line at 4:07.

    • @jeepnut1
      @jeepnut1 4 ปีที่แล้ว +12

      Indeed. Luckily, that's not the electrical line. Those are higher up. Should have had signage or flagging to mark the lines, though.

    • @Sam53148
      @Sam53148 4 ปีที่แล้ว +2

      Had that connected I hear the best thing to do is sit and don't try to get off, unless theres a fire, your suppose to hop clear of the machine with your feet together and hop like a bunny cause the ground will be energized if you walk normal that'll give the energy to go up one leg and down the other to a clear path to ground

    • @jeepnut1
      @jeepnut1 4 ปีที่แล้ว +3

      Sam Cusimano I heard that at one time too. Now, that’s partially correct. Still jump from the machine with your feet together (careful to land without putting a hand or other body part on the ground!), and then shuffle your feet, don’t hop. Hopping increases the risk that you fall over.
      However, you should first stay put in the machine until they cut power if you can. Only jump clear if it is no longer safe to stay in the machine.

    • @Sam53148
      @Sam53148 4 ปีที่แล้ว

      @@jeepnut1 I think now they make work boots safe from electrical contact, I saw it on a TV commercial

    • @rudddude5294
      @rudddude5294 4 ปีที่แล้ว +10

      you think one of the dozen workers there milling around would be watching out.

  • @TomHigginsWx
    @TomHigginsWx 2 ปีที่แล้ว

    34:40 The police celebrate with their sirens & lights. This city is so CUTE.

  • @Zebrails
    @Zebrails 4 ปีที่แล้ว +14

    Anyone else catch 13:46 conductor flashing your camera?

    • @juggernaughty8189
      @juggernaughty8189 3 ปีที่แล้ว

      why do you think this happened? accident? coincidence? or was there reason behind it

    • @alexlycan8
      @alexlycan8 3 ปีที่แล้ว

      I did,

  • @lescobrandon3047
    @lescobrandon3047 4 ปีที่แล้ว +1

    Fascinating video! Reminds me so much of how I installed my On30 flex track.

  • @poochie49
    @poochie49 4 ปีที่แล้ว +6

    That's just the way I replace track on my layout. Just large sections of flex track. LOL.

  • @williamschlenger1518
    @williamschlenger1518 4 ปีที่แล้ว +2

    Amazing machines and great operators.

  • @billsheffield4572
    @billsheffield4572 4 ปีที่แล้ว +3

    They seem to have a large amount of "supervisors" standing around doing nothing but watching while the machines and operators do 90%+ of the actual work. All did an excellent job at what there being paid to do , especially all those "supervisors" .

  • @mikemalo47
    @mikemalo47 4 ปีที่แล้ว +6

    Jawtooth did some on the ground videos as well

  • @briankeith5437
    @briankeith5437 4 ปีที่แล้ว +1

    Great video always wandered how they replaced the track nice to see

  • @AustNRail
    @AustNRail 3 ปีที่แล้ว +1

    I enjoyed the official reopening with the two patrol cars.

  • @paulsimkins3895
    @paulsimkins3895 4 ปีที่แล้ว +2

    That was fantastic really awesome 👍👍👍👍👍

  • @kc8rbk73
    @kc8rbk73 4 ปีที่แล้ว

    I wish I'd caught this live but thanks for putting it all together for us in one video. Hopefully once we can all move about again I can make it to this location to be a tourist and tell everyone your camera brought me there like I have other locations in the past.

  • @hiattech
    @hiattech 3 ปีที่แล้ว

    I have never seen preassembled track dragged in like that. Kinda floored me.

  • @PISQUEFrancis
    @PISQUEFrancis 4 ปีที่แล้ว +1

    That was Great ... I have worked with short ladders of 20 or so feet (RR surveyor for Loran Construction, long ago), but never saw ladders hundreds of feet long being hauled around ...

    • @PISQUEFrancis
      @PISQUEFrancis 4 ปีที่แล้ว

      Oops ... I think that was Loram, not Loran, back in 1979 and 1980

  • @davej3781
    @davej3781 4 ปีที่แล้ว +8

    I didn't know Peco made flextrack in 1:1 scale

  • @Consequator
    @Consequator 4 ปีที่แล้ว

    That ballet of CAT's is actually amazing. Workmen like this often go very underrated by the general public.

  • @adamkinsinger7792
    @adamkinsinger7792 4 ปีที่แล้ว +39

    They should’ve gone triple track just for the fun of it.

    • @jazrobean1
      @jazrobean1 4 ปีที่แล้ว +8

      yEAH - - - an ELECTRIC THIRD RAIL WOULD make it EXCITING for PEDESTRIANS - - - yukkity - - - 'caught on camera'

    • @Normal1855
      @Normal1855 4 ปีที่แล้ว +4

      Both of you are evil. 😆

    • @thomaswilkinson3241
      @thomaswilkinson3241 4 ปีที่แล้ว +1

      Like a DC Modelltrain set? Or some Subway systems? Creative, bzzzzzt, another Pedestrian grilled. 😅

  • @nicholasragusano2284
    @nicholasragusano2284 4 ปีที่แล้ว +2

    Flex track on a monster scale!!

  • @deandanielson8074
    @deandanielson8074 4 ปีที่แล้ว

    Wow, an awesome video. Nice to have flex track. Interesting laying of the track while trains are still passing over.

  • @tigg5036
    @tigg5036 4 ปีที่แล้ว +2

    Great film, still shots at end fab too. Well done all involved, really engaging :)

  • @duanelundgren7985
    @duanelundgren7985 4 ปีที่แล้ว +10

    Great video!!!! You had me from 00:00 to 36:55 :-) :-)

    • @bestamerica
      @bestamerica 4 ปีที่แล้ว

      hi D L...
      '
      concrete blocks with tracks are the best...
      wood blocks are not good

  • @fogdan
    @fogdan 4 ปีที่แล้ว +5

    This is an Awesome Video!!!

  • @lnproductions3227
    @lnproductions3227 4 ปีที่แล้ว

    Nice catch seeing CSX 8873 an Ex-CR & Ex-PRR SD40!

  • @MojaveNarrows
    @MojaveNarrows 4 ปีที่แล้ว +1

    Working on the railroad!

  • @porkypine52
    @porkypine52 4 ปีที่แล้ว

    When the trains were running thru town, with city buildings on both sides tracks, looking up, was EAST/NORTH towards Cincinnati, Ohio. Down was towards Louisville, KY. When the open area and Church was on the right side, the line going up to the left was going west/south towards Louisville, Kentucky. The grade crossing in the middle of town, that was replaced, was 1st Street, which connects to exit #28, Interstate I-71. I-71 runs between Louisville, KY to Cleveland OHIO via Cincinnati and Columbus Ohio.

  • @vesubioromo9425
    @vesubioromo9425 3 ปีที่แล้ว

    Buildings aren't occupied during construction, you can't fly a plane during any level of maintenance, and you can't sail ships while they're being built. And yet, a single track takes revenue trains while they're still replacing it. A single track. American ingenuity. Men take a lot of heat in this crazy culture. What they should get is a simple Thank You.

  • @eagleknight2701
    @eagleknight2701 4 ปีที่แล้ว +1

    Nice compilation. I was expecting to see thermite welding, but didn't know they had a rail welding machine that came out the back end of a truck now.

  • @slimonion1975
    @slimonion1975 4 ปีที่แล้ว +2

    Amazing job they do...great work

  • @davidcusa6282
    @davidcusa6282 4 ปีที่แล้ว +4

    Considering the length of the road/rail surface and the weight of the trains that use the line daily, would it not have been a better investment to set the rails on a concrete rebar tramway? Surely even with all the tamping in the world, the track and tar-macadam will settle and move over time?

    • @johnthompson941
      @johnthompson941 4 ปีที่แล้ว +1

      As a retired railroad maintenance worker I am surprised they didn't run a ballast stabilizer through before repaving, that and no supervisors parked in the way!

  • @2112theoden
    @2112theoden 4 ปีที่แล้ว +3

    I watched a lot of this live. Missed the very beginning though.

  • @Bender24k
    @Bender24k 4 ปีที่แล้ว

    Very nice video - I really liked the still shots at the end too. Thanks!

  • @38911bytefree
    @38911bytefree 4 ปีที่แล้ว

    The excavator operator pick the rail with insane presicion !!!!

  • @NSaw1
    @NSaw1 4 ปีที่แล้ว +6

    3:58 Uh ya might want to watch the telephone line a bit closer.

  • @knightd12
    @knightd12 4 ปีที่แล้ว +1

    Thanks, this was very well done.

  • @kensbackshop6399
    @kensbackshop6399 4 ปีที่แล้ว +2

    Awesome video as always,,,,was that atlas ho scale code 100 nickle silver flex track???????

  • @williamschlenger1518
    @williamschlenger1518 4 ปีที่แล้ว +3

    The whole track was pre assembled? Wow.

  • @allongman
    @allongman 4 ปีที่แล้ว

    Excellent we watched each day but enjoyed video and liked the stills at the end !

  • @trainbytrain
    @trainbytrain 4 ปีที่แล้ว

    great clip and interesting to watch how this replacement works

  • @jamiemackie3994
    @jamiemackie3994 3 ปีที่แล้ว +1

    Dont mind us while we just drop in this piece of flex track.

  • @30041946
    @30041946 4 ปีที่แล้ว +1

    Brilliant and something that we will never witness in UK. Well done . Dgr

    • @Skipperau
      @Skipperau 3 ปีที่แล้ว

      I watched a Stobarts crew doing a similar job spanned over 2 nights while the track was live.

  • @ale.3463
    @ale.3463 4 ปีที่แล้ว +2

    Yay. Been waiting for this

  • @jefflimadj
    @jefflimadj 3 ปีที่แล้ว

    I really liked that truck in 24:23

  • @ericassuvtravels
    @ericassuvtravels 3 ปีที่แล้ว

    That was awesome to watch. Thank you

  • @9005067
    @9005067 4 ปีที่แล้ว +1

    thanks for sharing ,that was excellent

  • @SantaFe19484
    @SantaFe19484 4 ปีที่แล้ว

    Unbelievable as a dump truck with a pivoting bed!

  • @TrainTrackTrav
    @TrainTrackTrav 4 ปีที่แล้ว +1

    Ah, so that's how they maintain street trackage. Very cool indeed!

  • @railrocker2368
    @railrocker2368 4 ปีที่แล้ว +1

    Love the music at the end!

  • @bohhica1
    @bohhica1 4 ปีที่แล้ว +1

    Great job,👍👍👍👍👍👍👍🇺🇸🇺🇸🇺🇸🇺🇸🇺🇸🇺🇸

  • @christophervalkoinen6358
    @christophervalkoinen6358 3 ปีที่แล้ว +1

    Everything about this is so low tech, it's fantastic.

  • @jorgediaz9853
    @jorgediaz9853 4 ปีที่แล้ว +1

    Excelente video y excelente trabajo 👍

  • @frankbullitt4556
    @frankbullitt4556 3 ปีที่แล้ว +1

    very cool video. Thats a lot of work. Are these your cameras ?

  • @jimpowell1802
    @jimpowell1802 4 ปีที่แล้ว +2

    Railroads don't work without Maintenance-of-Way!

  • @markwarren7116
    @markwarren7116 4 ปีที่แล้ว +1

    Very nice video.

  • @lawrence18uk
    @lawrence18uk 4 ปีที่แล้ว +4

    19:01 the refreshments tent was late arriving!

    • @1878reddevil
      @1878reddevil 4 ปีที่แล้ว +1

      19:41 VR bringing pizza to the workers! lol

  • @KuptisOriginal
    @KuptisOriginal 3 ปีที่แล้ว +1

    4:08 snagged an overhead cable.

  • @More-Space-In-Ear
    @More-Space-In-Ear 4 ปีที่แล้ว

    Love those mini diggers, so agile...

  • @ScepticPJ
    @ScepticPJ 4 ปีที่แล้ว +1

    And the first person to try to drive a car along it will be when??

  • @drboze6781
    @drboze6781 3 ปีที่แล้ว

    Nice to see them use 3' sections of flex track instead of Atlas Snap-Track, lol.