Wonderful 100% Complete By The Bulldozer Building New Road Cut Of Canal Side

แชร์
ฝัง
  • เผยแพร่เมื่อ 20 ก.ย. 2024
  • Dear all fan fan, Here is Wonderful 100% Complete By The Bulldozer Building New Road Cut Of Canal Side
    please watching wonderful heavy equipment videos,
    If you love this videos, please SUBSCRIBE, LIKE, COMMENT SHARE our videos for more!!

ความคิดเห็น • 441

  • @Heavy-Equipment-TV
    @Heavy-Equipment-TV  4 หลายเดือนก่อน +24

    I hope you enjoy with my video's channel! Plz subscribe, like and share
    This is the best activities Dump Trucks Fails Recovery:
    th-cam.com/video/Fh0e9BQRdZw/w-d-xo.html
    th-cam.com/video/dpiQK1KY380/w-d-xo.html

  • @rogersmith5159
    @rogersmith5159 7 หลายเดือนก่อน +7

    When you miss your childhood days and what to play outside with your toy's this is what's happening here.

  • @Alexasif501
    @Alexasif501 ปีที่แล้ว +36

    They took 9-10 hours to build this road but on the other hand one small drop of rain the road is gone! Note my words.

  • @carlosuchoa7120
    @carlosuchoa7120 ปีที่แล้ว +78

    My suggestion: immediately arrest the engineer or whoever prepared this.

    • @hisamsung3141
      @hisamsung3141 9 หลายเดือนก่อน +2

      😂😮😅

    • @h9108
      @h9108 8 หลายเดือนก่อน +2

      👍

    • @오열-i5n
      @오열-i5n 8 หลายเดือนก่อน

      00

    • @t-dog8528
      @t-dog8528 7 หลายเดือนก่อน +1

      M0r0n, not everyone gets huge budgets, especially rural areas

    • @伍豪-v5z
      @伍豪-v5z 7 หลายเดือนก่อน +1

      They’re going to build a bridge there. A footing is building at the middle of the river.

  • @ryangrimm9305
    @ryangrimm9305 ปีที่แล้ว +32

    From the looks of the canal, which is apparently slack water, those culverts are around a meter too high. Water should already be going through those pipes at this point.
    From the appearance of the banks of the canal, high water will probably flood over that crossing, washing it out.
    Was this engineered or just "Oh, I dunno, let's stick this in there and see of it works?"

  • @gravelydon7072
    @gravelydon7072 ปีที่แล้ว +14

    Total waste using the excavator and operator. Just build up a pile with the dozer and when ready to close the breach, shove the pile in. Only real need for the excavator was overgrowth removal once the breach was closed.

    • @kanmh3482
      @kanmh3482 ปีที่แล้ว +6

      As I watched this, I feel fedup & continuously in my heart saying stupid stupid stupid🙈🙏

  • @ghausiyunus121
    @ghausiyunus121 ปีที่แล้ว +19

    It may not be able to support the road without having a solid foundation… I think when heavy rains come, potentially will washed out from under neat….I hope consideration has been given to mitigate this…thanks

  • @rogersantiago2707
    @rogersantiago2707 ปีที่แล้ว +10

    When the water overflows from the dumpings... WASH AWAY EVERYTHING... DO YOU IMAGINE MR. VLOGGER... 😭😭😭

  • @commercialphotography4431
    @commercialphotography4431 ปีที่แล้ว +9

    wouldn't it have made more sense to just let the bulldozer push all the dirt down the hill and close the gap! lord help them

    • @michaelroberts6299
      @michaelroberts6299 7 หลายเดือนก่อน +2

      thankyou just what i was thinking can only presume the digger driver was trying to make work for him self

    • @garydunn1853
      @garydunn1853 4 หลายเดือนก่อน +2

      I see truck loads of soil getting washed down the river and ending up doing nothink.

  • @nelsonchinasamy9857
    @nelsonchinasamy9857 ปีที่แล้ว +63

    How long is that going to last? It will be all gone in the next heavy rain.

    • @KatariaGujjar
      @KatariaGujjar ปีที่แล้ว +3

      Do you see the 4 big pipes placed under the bridge?

    • @davidwilken3584
      @davidwilken3584 ปีที่แล้ว +13

      Of course he did and those 4 “big” pipes won’t be able to handle the water flow now let alone a heavy rain event. It will wash away like it even wasn’t ever there.

    • @KatariaGujjar
      @KatariaGujjar ปีที่แล้ว +1

      @@davidwilken3584 let us know when it happens

    • @WolfPackRacing
      @WolfPackRacing ปีที่แล้ว +5

      ​@@KatariaGujjar those four pipe are what you'd use for your drive way, not a river crossing. By the way not a bridge, more a dam with weak spillway.

    • @Jim-zc6dr
      @Jim-zc6dr ปีที่แล้ว +8

      Lmao I'm not engineer but l give it 2 rain storms even if it had 8 culverts

  • @josehelijawod8848
    @josehelijawod8848 ปีที่แล้ว +7

    Water current is strong. Use bulldozer to push big volume of filling materials. Slow work and lots of materials wash out.

  • @yuliana-tf7gl
    @yuliana-tf7gl 6 หลายเดือนก่อน +2

    Amazing work

  • @barryrollins2728
    @barryrollins2728 ปีที่แล้ว +7

    Please show more than just the filling and the crossing! There must be more than this! Thank You

    • @chandramohanpai2082
      @chandramohanpai2082 ปีที่แล้ว +3

      @,Barry Rollins , think again outletpipes will be put on top to maintain water leval in the dam and let out excess water but it will not last long

  • @user-eo5ct9ok5j
    @user-eo5ct9ok5j ปีที่แล้ว +5

    O rio enche a água transborda por cima leva tudo meu Deus

  • @markh8916
    @markh8916 ปีที่แล้ว +3

    Like to see the completed project

    • @jakerazmataz852
      @jakerazmataz852 ปีที่แล้ว

      It is.🤣

    • @BuriedUnkind
      @BuriedUnkind 14 วันที่ผ่านมา

      @markh8916 So would they. They ran out of dirt. 🤣🤣🤣🤣

  • @violaarseliyachannel2628
    @violaarseliyachannel2628 ปีที่แล้ว +3

    Proyek ngurug kali 👍👍🙏🙏 nice sharing 🙏🙌

  • @TRMachines
    @TRMachines 6 หลายเดือนก่อน +1

    great video

  • @j.c.6390
    @j.c.6390 11 หลายเดือนก่อน +6

    Verdadeiro serviço porco lascado! Não aguenta meia hora de chuva.Esse responsável por essa obra, é de uma inteligência que tem que ser estudado pela Nasa!😂😂😂

    • @warlenmaldonado9978
      @warlenmaldonado9978 10 หลายเดือนก่อน

      pensei a mesma coisa.. pelo tamanho do vale do córrego, quando der uma chuva, nao fica nada disso ai...

    • @sitiokolibri6372
      @sitiokolibri6372 7 หลายเดือนก่อน

      Sabemos que o que está em volto deste projeto não é uma solução para a comunidade, mas sim, um desvio de verbe. Com certeza, a verba disponivel é e USD 1 mi. Dai USD 500mil são estudos de viabilidade, impacto ambiental e estudo sobre sitio arqueológico (qualquer fato que estamos vivendo aqui, não é mera coincidencia). Dai restam só USD 500mil para a obra. Disto tem ainda USD 200mil gasto em propaganda, novos estudos, etc e etc. Sobram só USD 40mil para a obra. E é isto.
      Podes ver no momento 13:40 - o fotógrafo de preto, que receberá em conta USD 10mil mas só ficará com USD 2mil.
      No momento 14 adiante: uma pessoa com a enxada (é o que deu o voto para o prefeito local). Outro do lado olhado é o chefe (amigo do sobrinho do prefeito) e o terceiro do lado é o gerente da obra (o sobrinho do prefeito.)

    • @DapaDapa-f9f
      @DapaDapa-f9f หลายเดือนก่อน

      Hanya menghamburkan uang saja😅

  • @wwyf04
    @wwyf04 ปีที่แล้ว +38

    I wonder which engineer that says those 4 pipes are able to handle water from such a wide river..😮

    • @rogersantiago2707
      @rogersantiago2707 ปีที่แล้ว +11

      Almost all watchers do not like this kind of project... Do you agree...

    • @jamescampbell7780
      @jamescampbell7780 ปีที่แล้ว +3

      Why is this video disjointed? The channel was blocked earlier, now we have rewound the video! The digger driver must be the company boss!

    • @pouwakaruwhiu8349
      @pouwakaruwhiu8349 ปีที่แล้ว +1

      😂😂😂

    • @jakerazmataz852
      @jakerazmataz852 ปีที่แล้ว +3

      I guarantee the first not so heavy rain and it's overflowing.

    • @jakerazmataz852
      @jakerazmataz852 ปีที่แล้ว +1

      @@mwenengofero I don't think it's for a road. Look at the steep bank. Now, it may be for a road, but I would have dug out the bank so you know what you are working with, but hey, they think 4 pipes is going to work.

  • @gmel4967
    @gmel4967 3 หลายเดือนก่อน +2

    I ain't no civil engineer, but, that bridge will be down before the sunset.

  • @sameryosef4982
    @sameryosef4982 5 หลายเดือนก่อน +2

    They do not need an engineer. Most rural roads have bridges of this type. In the first flood, everything will end

  • @ober7250
    @ober7250 6 หลายเดือนก่อน +2

    A nice thing about water is that you can see where it wants to go, yet these people decided to put the culverts in the wrong spot, not very bright.

  • @LarrySherman-hn8ye
    @LarrySherman-hn8ye ปีที่แล้ว +7

    I don't think that Road will support more than a few ducks it will be nothing but mud and will be down stream quickly

  • @jerrydutra3225
    @jerrydutra3225 ปีที่แล้ว +8

    As he is trying to close the gap , the dirt is washing away 😅

  • @bobgrow5234
    @bobgrow5234 2 วันที่ผ่านมา

    I'm Subscribed to many dozer and heavy equipment sites. This was a good quality and sound was good. I really like start to finish video's. But for a short video, I found it quite good. Your crew seemed quite skilled. Great job. I'm Subscribed now.

  • @alanhughes5868
    @alanhughes5868 ปีที่แล้ว +16

    The excavator definitely slows the project down.

    • @pouwakaruwhiu8349
      @pouwakaruwhiu8349 ปีที่แล้ว +2

      Would have got the Dozer to do the job.

    • @jeffchappell1731
      @jeffchappell1731 ปีที่แล้ว

      Dosnt sound to healthy ether

    • @kanmh3482
      @kanmh3482 ปีที่แล้ว

      @@pouwakaruwhiu8349 right, but maybe to share some work for excavator?, if it's not the case, then the contractor is stupid😔🤔🤦🙈🙏

    • @ИлфирШайхиев
      @ИлфирШайхиев 9 หลายเดือนก่อน

      Наконец адекватной ответ русского, молодец!

    • @BuriedUnkind
      @BuriedUnkind 14 วันที่ผ่านมา

      @@pouwakaruwhiu8349 But then they wouldn't have lost so much dirt washed down the river.

  • @JoaoAlves-uh9zk
    @JoaoAlves-uh9zk ปีที่แล้ว +10

    Ótimo vídeo
    👍

  • @pinoybusdrivertv6305
    @pinoybusdrivertv6305 ปีที่แล้ว

    Nice one

  • @nomad57-u3x
    @nomad57-u3x 7 หลายเดือนก่อน +1

    now they need to build a bridge over the river/canal/stream 20-30 feet above the water line during flood season using concrete and steel with engineered abutments to hold up a suspension bridge big enough to support fully loaded semi trailer trucks two wide end to end the length of the bridge...in other words they need some infrastructure from their government..hopefully their government or other governments will see this and send them the help they need to grow their townships/villages into cities...too grow their economy...

  • @RU-ei7bc
    @RU-ei7bc 5 หลายเดือนก่อน +2

    ស្ទឹងបុិនមេឃ ដាក់លូបុិនៗភ្លៅ😂😂😂😂😂😂😂😂

  • @karyaanakrantaukarimun
    @karyaanakrantaukarimun ปีที่แล้ว +5

    Proyek yang sangat luar biasa

  • @ericcope8216
    @ericcope8216 7 หลายเดือนก่อน +1

    That should last about a week or so. Pipes way too high, there should have been flow at the beginning of the video. Smart!

  • @purnomopurnomo9438
    @purnomopurnomo9438 ปีที่แล้ว +1

    4 pipa tidak akan mampu menahan kekuatan alam saat musim penghujan🤔🤔

  • @peterlewis2881
    @peterlewis2881 4 หลายเดือนก่อน +1

    To the Archair Road Builders ...They know EXACTLY what they are doing. 😅

  • @bulabuladieramy278
    @bulabuladieramy278 7 หลายเดือนก่อน +2

    very bad idea when rain come, you will have problem

  • @jembekali5928
    @jembekali5928 9 หลายเดือนก่อน +1

    Whatever was going on there does not make both environmental and economic sense. Never block/obstruct a natural waterway in any land development activity or project. A simple concrete and steel bridge would be feasible for the width of the river.

  • @jandersonoliveira2942
    @jandersonoliveira2942 3 หลายเดือนก่อน +2

    Não precisa ser engenheiro para achar vários erros nessa obra

  • @thanhle3201
    @thanhle3201 4 หลายเดือนก่อน +2

    mấy ông này thông minh quá !!! từ dòng sông to mấy ổng biến thành 4 cái ống nhỏ ??? nếu cơn mưa lớn nước dân một cơn lủ quét qua thì sao ta ??? hảy là người thông minh đứng biến mình thành trẻ trâu ngáo đá .😂😂😂

  • @meassavuth4649
    @meassavuth4649 ปีที่แล้ว

    Crazy job and crazy ideas , this river is very big , but they put the hole very small ,

  • @eritimes
    @eritimes 7 หลายเดือนก่อน +2

    Any civil engineer would not accept this practice! So many issues.

  • @nestorjologs4051
    @nestorjologs4051 5 หลายเดือนก่อน +1

    I wonder what they will do next after that. Perhaps they will install ten I-beams and add some riffraff to support the pressure when the water gets wild.

  • @jamescampbell7780
    @jamescampbell7780 ปีที่แล้ว +12

    I’m presuming that this project has not been designed by a qualified engineer?

    • @lucianosales6159
      @lucianosales6159 ปีที่แล้ว

      Vdd kkkkkkk

    • @cowshottv5867
      @cowshottv5867 ปีที่แล้ว +1

      There's about 8 channels here, they keep changing the names but it's all the same crew. That's the first culverts I've seen them use. There are no environmental rules whatsoever

    • @vothantv
      @vothantv ปีที่แล้ว

      You right 100%.

    • @TheJoedirt6000
      @TheJoedirt6000 11 หลายเดือนก่อน

      You Think

  • @speedingpontiacsle425
    @speedingpontiacsle425 6 หลายเดือนก่อน +1

    Looks like a high school project.

    • @BuriedUnkind
      @BuriedUnkind 14 วันที่ผ่านมา

      @speedingpontiacsle425 More like kindergarten.

  • @rikoherlambang1567
    @rikoherlambang1567 4 หลายเดือนก่อน +1

    omg,.. the water channel is too small, are you sure the architect graduated from college? what if it rains heavily and the water volume and pressure increases?

  • @gordonpasha3126
    @gordonpasha3126 ปีที่แล้ว +2

    why pipes for fornix are posed one meter upper the water level, they want create a new lake ?

  • @gabana9686
    @gabana9686 ปีที่แล้ว

    ចប់បណ្តោយ ស្ទឹងប៉ុនណាប៉ុនណីមកធ្វើផ្លូវឆ្លងកាត់ដាក់លូតូចមួយ គេត្រូវធ្វើស្ពានឆ្លងបានត្រូវ បានអីលូ2ម៉ែត្របួនជ្រុង3ទៅ4កង់អីទៅ ឃុំ ស្រុកណាទេ😄😄

  • @rogersantiago2707
    @rogersantiago2707 ปีที่แล้ว +4

    It would be best to build a steel bridge crossing the river... 🌉🌉🌉

    • @chandramohanpai2082
      @chandramohanpai2082 ปีที่แล้ว

      @Roger Santiago l think they are making a dam and if water is excess will flow over theud wall made for storing water not a road

    • @PawanSharma-tt7ho
      @PawanSharma-tt7ho ปีที่แล้ว

      Temprary bridge not for whole time

  • @mahfudrosadi6996
    @mahfudrosadi6996 8 หลายเดือนก่อน +1

    Kenapa gak di bikin jembatan aja. Jgn melawan air. Hujan dikit aja akan musnah

  • @vt1940
    @vt1940 7 หลายเดือนก่อน +1

    The Flow of the River is toward those pipes but they should be much Lower

  • @teresasmall3625
    @teresasmall3625 ปีที่แล้ว +19

    Where are their brains?

    • @tiagorodrigues5567
      @tiagorodrigues5567 11 หลายเดือนก่อน +2

      👏👍

    • @sleekilla
      @sleekilla 10 หลายเดือนก่อน

      At least they got a cat and one is wearing a hard hat 🤣🤷 I wanna see where that road is now. 5 months later.

    • @supergranfadiytvlange618
      @supergranfadiytvlange618 10 หลายเดือนก่อน

      Why they don't make a bridge to connect both sides.this is not enough especially during rainy seasons.. watching FROM Philippines...

  • @PaulIkit
    @PaulIkit 3 หลายเดือนก่อน +1

    It's temporary solution with permanent budget 😉

  • @keluargaabdulofficial
    @keluargaabdulofficial ปีที่แล้ว

    Amazing aktivity👍👍👍👍 good job brother and always succes👌

  • @juliocesar-rg2rf
    @juliocesar-rg2rf ปีที่แล้ว +10

    ADORO ESSES VÍDEOS, SÓ QUE ADORARIA ACOMPANHAR A SEQUÊNCIA DOS MESMO.
    FICO CURIOSO PARA SABER O RESULTADO DO TRABALHO.
    JÚLIO MESSI
    VISCONDE DO RIO BRANCO - MG

    • @156motos
      @156motos 10 หลายเดือนก่อน +1

      Queria ver a agua começando a pasar pelas manilhas!!

  • @razakjambi
    @razakjambi ปีที่แล้ว

    Ini baru jln sip tu kalau sudah jadi sukses selalu jangan lupa mampir di Razak jambi

  • @isaiah6423
    @isaiah6423 ปีที่แล้ว +1

    that road will wash away if the rain come.

  • @muratdogan5854
    @muratdogan5854 2 หลายเดือนก่อน +1

    seyretmek keyifli

  • @channel1520
    @channel1520 ปีที่แล้ว

    ฝีมือมากครับ

  • @heavenlyconversations
    @heavenlyconversations ปีที่แล้ว

    Those pipes may not withstand the water I see running down that river bed, I’m no engineer but that’s just obvious,

  • @nivid01
    @nivid01 11 หลายเดือนก่อน +1

    That road will wash away in the next down pour. Those pipes are in the wrong place and way too small!!!

  • @abundiocasis8205
    @abundiocasis8205 5 หลายเดือนก่อน +1

    Humanda na lahat ng mga nakatira sa lugar na yan dahil siguradong baha na ang lugar na yan pag nag tag ulan.

  • @mark109s
    @mark109s ปีที่แล้ว +15

    First heavy rain comes along, it will all be washed away.

    • @padu19
      @padu19 ปีที่แล้ว +2

      Yes.

    • @rogersantiago2707
      @rogersantiago2707 ปีที่แล้ว +2

      Rain please don't wash away the dumpings... I beg you... Huhuhu... 😭😭😭

    • @baseuwen9564
      @baseuwen9564 ปีที่แล้ว

      Hé Mark ben jij ook waterbouwkundig ir of ben je er bang voor dat dit gebeurt ?

    • @mark109s
      @mark109s ปีที่แล้ว

      @@baseuwen9564 speak English Please 🙏

    • @cgmillington
      @cgmillington ปีที่แล้ว

      ​@@mark109s he said, hey Mark are you also a hydraulic engineer, or are you afraid of this happening?

  • @sukhgunggim5105
    @sukhgunggim5105 ปีที่แล้ว

    បើធ្វើជាទំនប់យូរអង្វែង ត្រូវប្រើលូធំៗឲ្យល្មមតាមបរិមាណទឹកឡើង។

  • @thelonewolf666
    @thelonewolf666 7 หลายเดือนก่อน +1

    untill the first heavy rain washes it all away

  • @lpericteo
    @lpericteo ปีที่แล้ว +6

    Waste of efforts, money and time for a fruitless amateur project. 😢😮😊

    • @rogersantiago2707
      @rogersantiago2707 ปีที่แล้ว +1

      I reject this project... It should be a steel bridge... The best

  • @robertdoell4321
    @robertdoell4321 7 หลายเดือนก่อน +1

    Must be a very high altitude as these Dozers and Excavators quickly lose power under the finest of strains.

  • @bivssafar2019
    @bivssafar2019 10 หลายเดือนก่อน

    One can't block water.Its face problem in rainy season.This is wrong method. It's better to construct RCC bridge.

  • @rogerbayview
    @rogerbayview 4 หลายเดือนก่อน +1

    they shall be building a bridge instead of blocking the canal. are these guys having no idea what they are doing?

  • @user-eo5ct9ok5j
    @user-eo5ct9ok5j ปีที่แล้ว +1

    Deus abençoe vcs que não leve essa Terra só Deus

  • @ФедорЮдин-г1е
    @ФедорЮдин-г1е 8 หลายเดือนก่อน +2

    Реку песком не перекрывают ? Студенты !😂😂😂😂😂😂

  • @OppoA-iq1it
    @OppoA-iq1it ปีที่แล้ว

    ល្អបង

  • @DevanElsa-eo9wy
    @DevanElsa-eo9wy 7 หลายเดือนก่อน +1

    Mantap bg

  • @SalvadorjrDaug
    @SalvadorjrDaug 7 หลายเดือนก่อน +1

    I dont believe this kind of constraction, maybe it well last without flood😅

  • @ericwieboldt7042
    @ericwieboldt7042 4 หลายเดือนก่อน +3

    This is a disaster waiting to happen. I wonder how many people down stream are going to perish when it lets go in a heavy rainfall

  • @PhongNguyen-uk6hz
    @PhongNguyen-uk6hz ปีที่แล้ว

    Họ đắp con đường tạm qua sông,để vận chuyển vật liệu đi đi xây dựng một công trình gì đó thôi, đây không phải là xây dựng một hồ thủy lợi

  • @abundiocasis8205
    @abundiocasis8205 5 หลายเดือนก่อน +1

    Sayang ang gastos dyan 100% guguho yan pag nagtag ulan tatangayin lahat ng itinambak na lupa napakatalino ng nag plano nyan.😂😢😅

  • @underdogpride-motivation1661
    @underdogpride-motivation1661 3 หลายเดือนก่อน +1

    Re video like this.

  • @AlvaroOrtiz-us8ve
    @AlvaroOrtiz-us8ve 6 หลายเดือนก่อน +1

    Ésa maquinaria está asiendo el paso luego montan el puente original 😊👏👏👏👍👀🫶🙄

  • @wahidpriyanto1078
    @wahidpriyanto1078 ปีที่แล้ว

    This must be a temporary road

    • @jovenrosario4357
      @jovenrosario4357 10 หลายเดือนก่อน

      I also assume it so. It.must be a temporary diversion road.

  • @Varick76551
    @Varick76551 6 หลายเดือนก่อน +1

    100% done by bulldozer, well no, pretty much most of it is done by the cat 312 that sits in the middle of the picture for most of it, we barely see said dozer apart from a few times.

  • @ramboking5452
    @ramboking5452 6 หลายเดือนก่อน +1

    Where does the water go next through those 4 small pipes not a foundation at all dirt can’t hold water

  • @Tony-ey1jd
    @Tony-ey1jd 4 หลายเดือนก่อน +1

    Maybe I should start typing my comments, what I want to say is that this site lies. About a project being completed.

  • @pra_choenll.pt.8427
    @pra_choenll.pt.8427 3 หลายเดือนก่อน

    Good good J

  • @arjuna13
    @arjuna13 9 หลายเดือนก่อน

    Good job mantep lor

  • @Will-tm5bj
    @Will-tm5bj 7 หลายเดือนก่อน +1

    CLEARLY this isnt meant to last forever. Its probably a lot easier to just do this after rain season than it is to build a big ass engineered bridge.
    Look in the background... you think they can afford a fuckin bridge on every river crossing?
    This comment section doesnt pass thr vibe check

  • @tiagorodrigues5567
    @tiagorodrigues5567 11 หลายเดือนก่อน +1

    👏👍

  • @hamexplorekalimantan7386
    @hamexplorekalimantan7386 ปีที่แล้ว

    Hallo teman,...👋👍👍💯🙏

  • @thedolphin5428
    @thedolphin5428 7 หลายเดือนก่อน +1

    Dirt? Really? Blocking a creek with dirt at its base? I shake my head at such idiocy.

  • @alanzchannel6525
    @alanzchannel6525 5 หลายเดือนก่อน +1

    Children's game

  • @isvidio71
    @isvidio71 ปีที่แล้ว

    Nice

  • @adrilyanuar1386
    @adrilyanuar1386 8 หลายเดือนก่อน +1

    Culver are too small

  • @RenatoAgrisor-co7ks
    @RenatoAgrisor-co7ks 6 หลายเดือนก่อน +1

    Dondesta este parte de trabajar

  • @denttrails5182
    @denttrails5182 7 หลายเดือนก่อน +1

    5. 4meter culverts would of been better. Think there just playing with diggers tbh

  • @TheExcavatorPros
    @TheExcavatorPros 9 หลายเดือนก่อน +1

    Hope to see it in action by the next rain😂😂😂

  • @MapholobaMaps-rh6db
    @MapholobaMaps-rh6db 8 หลายเดือนก่อน +1

    This sand one day heavy rain 🌧️ will wash it go down with the River

  • @toohoopingsorsorsor-eq7gv
    @toohoopingsorsorsor-eq7gv 7 หลายเดือนก่อน +2

    溝这么一宽又那么深放置那4个灰涵能通得了那条的水:很神奇

  • @ralfrosenkranz1417
    @ralfrosenkranz1417 8 หลายเดือนก่อน +1

    Das ihr nicht die Hellsten seid beweist ihr mit jedem Video

  • @terrenceknightmoyo9867
    @terrenceknightmoyo9867 ปีที่แล้ว

    😢😮Not enough planning for this job pipes to small for such a wide river, doubt road will last, poor workmanship

  • @عامرربيعخلاف
    @عامرربيعخلاف 7 หลายเดือนก่อน +1

    👍👍👍👍👍👍

  • @williamfowler616
    @williamfowler616 7 หลายเดือนก่อน +1

    road? you mean dam?

  • @alexandromariano1601
    @alexandromariano1601 ปีที่แล้ว +1

    Eu acho que na primeira chuva, leva tudo embora