Wonderful 100% Complete By The Bulldozer Building New Road Cut Of Canal Side
ฝัง
- เผยแพร่เมื่อ 20 ก.ย. 2024
- Dear all fan fan, Here is Wonderful 100% Complete By The Bulldozer Building New Road Cut Of Canal Side
please watching wonderful heavy equipment videos,
If you love this videos, please SUBSCRIBE, LIKE, COMMENT SHARE our videos for more!!
I hope you enjoy with my video's channel! Plz subscribe, like and share
This is the best activities Dump Trucks Fails Recovery:
th-cam.com/video/Fh0e9BQRdZw/w-d-xo.html
th-cam.com/video/dpiQK1KY380/w-d-xo.html
When you miss your childhood days and what to play outside with your toy's this is what's happening here.
They took 9-10 hours to build this road but on the other hand one small drop of rain the road is gone! Note my words.
My suggestion: immediately arrest the engineer or whoever prepared this.
😂😮😅
👍
00
M0r0n, not everyone gets huge budgets, especially rural areas
They’re going to build a bridge there. A footing is building at the middle of the river.
From the looks of the canal, which is apparently slack water, those culverts are around a meter too high. Water should already be going through those pipes at this point.
From the appearance of the banks of the canal, high water will probably flood over that crossing, washing it out.
Was this engineered or just "Oh, I dunno, let's stick this in there and see of it works?"
I'm betting the latter
Total waste using the excavator and operator. Just build up a pile with the dozer and when ready to close the breach, shove the pile in. Only real need for the excavator was overgrowth removal once the breach was closed.
As I watched this, I feel fedup & continuously in my heart saying stupid stupid stupid🙈🙏
It may not be able to support the road without having a solid foundation… I think when heavy rains come, potentially will washed out from under neat….I hope consideration has been given to mitigate this…thanks
When the water overflows from the dumpings... WASH AWAY EVERYTHING... DO YOU IMAGINE MR. VLOGGER... 😭😭😭
wouldn't it have made more sense to just let the bulldozer push all the dirt down the hill and close the gap! lord help them
thankyou just what i was thinking can only presume the digger driver was trying to make work for him self
I see truck loads of soil getting washed down the river and ending up doing nothink.
How long is that going to last? It will be all gone in the next heavy rain.
Do you see the 4 big pipes placed under the bridge?
Of course he did and those 4 “big” pipes won’t be able to handle the water flow now let alone a heavy rain event. It will wash away like it even wasn’t ever there.
@@davidwilken3584 let us know when it happens
@@KatariaGujjar those four pipe are what you'd use for your drive way, not a river crossing. By the way not a bridge, more a dam with weak spillway.
Lmao I'm not engineer but l give it 2 rain storms even if it had 8 culverts
Water current is strong. Use bulldozer to push big volume of filling materials. Slow work and lots of materials wash out.
Amazing work
Please show more than just the filling and the crossing! There must be more than this! Thank You
@,Barry Rollins , think again outletpipes will be put on top to maintain water leval in the dam and let out excess water but it will not last long
O rio enche a água transborda por cima leva tudo meu Deus
Like to see the completed project
It is.🤣
@markh8916 So would they. They ran out of dirt. 🤣🤣🤣🤣
Proyek ngurug kali 👍👍🙏🙏 nice sharing 🙏🙌
great video
Verdadeiro serviço porco lascado! Não aguenta meia hora de chuva.Esse responsável por essa obra, é de uma inteligência que tem que ser estudado pela Nasa!😂😂😂
pensei a mesma coisa.. pelo tamanho do vale do córrego, quando der uma chuva, nao fica nada disso ai...
Sabemos que o que está em volto deste projeto não é uma solução para a comunidade, mas sim, um desvio de verbe. Com certeza, a verba disponivel é e USD 1 mi. Dai USD 500mil são estudos de viabilidade, impacto ambiental e estudo sobre sitio arqueológico (qualquer fato que estamos vivendo aqui, não é mera coincidencia). Dai restam só USD 500mil para a obra. Disto tem ainda USD 200mil gasto em propaganda, novos estudos, etc e etc. Sobram só USD 40mil para a obra. E é isto.
Podes ver no momento 13:40 - o fotógrafo de preto, que receberá em conta USD 10mil mas só ficará com USD 2mil.
No momento 14 adiante: uma pessoa com a enxada (é o que deu o voto para o prefeito local). Outro do lado olhado é o chefe (amigo do sobrinho do prefeito) e o terceiro do lado é o gerente da obra (o sobrinho do prefeito.)
Hanya menghamburkan uang saja😅
I wonder which engineer that says those 4 pipes are able to handle water from such a wide river..😮
Almost all watchers do not like this kind of project... Do you agree...
Why is this video disjointed? The channel was blocked earlier, now we have rewound the video! The digger driver must be the company boss!
😂😂😂
I guarantee the first not so heavy rain and it's overflowing.
@@mwenengofero I don't think it's for a road. Look at the steep bank. Now, it may be for a road, but I would have dug out the bank so you know what you are working with, but hey, they think 4 pipes is going to work.
I ain't no civil engineer, but, that bridge will be down before the sunset.
They do not need an engineer. Most rural roads have bridges of this type. In the first flood, everything will end
A nice thing about water is that you can see where it wants to go, yet these people decided to put the culverts in the wrong spot, not very bright.
I don't think that Road will support more than a few ducks it will be nothing but mud and will be down stream quickly
As he is trying to close the gap , the dirt is washing away 😅
I'm Subscribed to many dozer and heavy equipment sites. This was a good quality and sound was good. I really like start to finish video's. But for a short video, I found it quite good. Your crew seemed quite skilled. Great job. I'm Subscribed now.
Thanksgiving
The excavator definitely slows the project down.
Would have got the Dozer to do the job.
Dosnt sound to healthy ether
@@pouwakaruwhiu8349 right, but maybe to share some work for excavator?, if it's not the case, then the contractor is stupid😔🤔🤦🙈🙏
Наконец адекватной ответ русского, молодец!
@@pouwakaruwhiu8349 But then they wouldn't have lost so much dirt washed down the river.
Ótimo vídeo
👍
Nice one
now they need to build a bridge over the river/canal/stream 20-30 feet above the water line during flood season using concrete and steel with engineered abutments to hold up a suspension bridge big enough to support fully loaded semi trailer trucks two wide end to end the length of the bridge...in other words they need some infrastructure from their government..hopefully their government or other governments will see this and send them the help they need to grow their townships/villages into cities...too grow their economy...
ស្ទឹងបុិនមេឃ ដាក់លូបុិនៗភ្លៅ😂😂😂😂😂😂😂😂
Proyek yang sangat luar biasa
That should last about a week or so. Pipes way too high, there should have been flow at the beginning of the video. Smart!
4 pipa tidak akan mampu menahan kekuatan alam saat musim penghujan🤔🤔
To the Archair Road Builders ...They know EXACTLY what they are doing. 😅
very bad idea when rain come, you will have problem
Whatever was going on there does not make both environmental and economic sense. Never block/obstruct a natural waterway in any land development activity or project. A simple concrete and steel bridge would be feasible for the width of the river.
Não precisa ser engenheiro para achar vários erros nessa obra
mấy ông này thông minh quá !!! từ dòng sông to mấy ổng biến thành 4 cái ống nhỏ ??? nếu cơn mưa lớn nước dân một cơn lủ quét qua thì sao ta ??? hảy là người thông minh đứng biến mình thành trẻ trâu ngáo đá .😂😂😂
Crazy job and crazy ideas , this river is very big , but they put the hole very small ,
Any civil engineer would not accept this practice! So many issues.
I wonder what they will do next after that. Perhaps they will install ten I-beams and add some riffraff to support the pressure when the water gets wild.
I’m presuming that this project has not been designed by a qualified engineer?
Vdd kkkkkkk
There's about 8 channels here, they keep changing the names but it's all the same crew. That's the first culverts I've seen them use. There are no environmental rules whatsoever
You right 100%.
You Think
Looks like a high school project.
@speedingpontiacsle425 More like kindergarten.
omg,.. the water channel is too small, are you sure the architect graduated from college? what if it rains heavily and the water volume and pressure increases?
why pipes for fornix are posed one meter upper the water level, they want create a new lake ?
ចប់បណ្តោយ ស្ទឹងប៉ុនណាប៉ុនណីមកធ្វើផ្លូវឆ្លងកាត់ដាក់លូតូចមួយ គេត្រូវធ្វើស្ពានឆ្លងបានត្រូវ បានអីលូ2ម៉ែត្របួនជ្រុង3ទៅ4កង់អីទៅ ឃុំ ស្រុកណាទេ😄😄
It would be best to build a steel bridge crossing the river... 🌉🌉🌉
@Roger Santiago l think they are making a dam and if water is excess will flow over theud wall made for storing water not a road
Temprary bridge not for whole time
Kenapa gak di bikin jembatan aja. Jgn melawan air. Hujan dikit aja akan musnah
The Flow of the River is toward those pipes but they should be much Lower
Where are their brains?
👏👍
At least they got a cat and one is wearing a hard hat 🤣🤷 I wanna see where that road is now. 5 months later.
Why they don't make a bridge to connect both sides.this is not enough especially during rainy seasons.. watching FROM Philippines...
It's temporary solution with permanent budget 😉
Amazing aktivity👍👍👍👍 good job brother and always succes👌
ADORO ESSES VÍDEOS, SÓ QUE ADORARIA ACOMPANHAR A SEQUÊNCIA DOS MESMO.
FICO CURIOSO PARA SABER O RESULTADO DO TRABALHO.
JÚLIO MESSI
VISCONDE DO RIO BRANCO - MG
Queria ver a agua começando a pasar pelas manilhas!!
Ini baru jln sip tu kalau sudah jadi sukses selalu jangan lupa mampir di Razak jambi
that road will wash away if the rain come.
seyretmek keyifli
ฝีมือมากครับ
Those pipes may not withstand the water I see running down that river bed, I’m no engineer but that’s just obvious,
That road will wash away in the next down pour. Those pipes are in the wrong place and way too small!!!
Humanda na lahat ng mga nakatira sa lugar na yan dahil siguradong baha na ang lugar na yan pag nag tag ulan.
First heavy rain comes along, it will all be washed away.
Yes.
Rain please don't wash away the dumpings... I beg you... Huhuhu... 😭😭😭
Hé Mark ben jij ook waterbouwkundig ir of ben je er bang voor dat dit gebeurt ?
@@baseuwen9564 speak English Please 🙏
@@mark109s he said, hey Mark are you also a hydraulic engineer, or are you afraid of this happening?
បើធ្វើជាទំនប់យូរអង្វែង ត្រូវប្រើលូធំៗឲ្យល្មមតាមបរិមាណទឹកឡើង។
untill the first heavy rain washes it all away
Waste of efforts, money and time for a fruitless amateur project. 😢😮😊
I reject this project... It should be a steel bridge... The best
Must be a very high altitude as these Dozers and Excavators quickly lose power under the finest of strains.
One can't block water.Its face problem in rainy season.This is wrong method. It's better to construct RCC bridge.
they shall be building a bridge instead of blocking the canal. are these guys having no idea what they are doing?
Deus abençoe vcs que não leve essa Terra só Deus
Реку песком не перекрывают ? Студенты !😂😂😂😂😂😂
ល្អបង
Mantap bg
I dont believe this kind of constraction, maybe it well last without flood😅
This is a disaster waiting to happen. I wonder how many people down stream are going to perish when it lets go in a heavy rainfall
Họ đắp con đường tạm qua sông,để vận chuyển vật liệu đi đi xây dựng một công trình gì đó thôi, đây không phải là xây dựng một hồ thủy lợi
Sayang ang gastos dyan 100% guguho yan pag nagtag ulan tatangayin lahat ng itinambak na lupa napakatalino ng nag plano nyan.😂😢😅
Re video like this.
Ésa maquinaria está asiendo el paso luego montan el puente original 😊👏👏👏👍👀🫶🙄
This must be a temporary road
I also assume it so. It.must be a temporary diversion road.
100% done by bulldozer, well no, pretty much most of it is done by the cat 312 that sits in the middle of the picture for most of it, we barely see said dozer apart from a few times.
Where does the water go next through those 4 small pipes not a foundation at all dirt can’t hold water
Maybe I should start typing my comments, what I want to say is that this site lies. About a project being completed.
Good good J
Good job mantep lor
CLEARLY this isnt meant to last forever. Its probably a lot easier to just do this after rain season than it is to build a big ass engineered bridge.
Look in the background... you think they can afford a fuckin bridge on every river crossing?
This comment section doesnt pass thr vibe check
👏👍
Hallo teman,...👋👍👍💯🙏
Dirt? Really? Blocking a creek with dirt at its base? I shake my head at such idiocy.
Children's game
Nice
Culver are too small
Dondesta este parte de trabajar
5. 4meter culverts would of been better. Think there just playing with diggers tbh
Hope to see it in action by the next rain😂😂😂
This sand one day heavy rain 🌧️ will wash it go down with the River
溝这么一宽又那么深放置那4个灰涵能通得了那条的水:很神奇
Das ihr nicht die Hellsten seid beweist ihr mit jedem Video
😢😮Not enough planning for this job pipes to small for such a wide river, doubt road will last, poor workmanship
👍👍👍👍👍👍
road? you mean dam?
Eu acho que na primeira chuva, leva tudo embora