ABB Kabeldon Dry Cable Termination for 145kV - IEC 60840 - Dry Outdoor CableTermination

แชร์
ฝัง
  • เผยแพร่เมื่อ 14 พ.ค. 2012
  • ABB Kabeldon Dry Cable Termination for 145kV
    With the brand new cable termination the installation can be done in less than one hour.
    Combining proven and reliable technology with innovative thinking and world class engineering, ABB in Alingsås has developed and qualified (according to IEC 60840, Um 145 kV) a self supporting dry outdoor cable termination.
    Pre-assembled
    The pre-assembled termination - a composite insulator with integrated base part, support pipe, stress relief cone and insulating compound - is delivered as one unit from factory and ready to be installed right out the box. Fewer components to install minimizes risk for mistakes - safety by simplicity.
    Pre-filled at factory
    The termination is pre-filled with an insulating material (silicone compound) under secure conditions at factory. This means no time consuming filling of insulating material at site. It also means no risk for leakage, less environmental impact.
    Assembly time - less than an hour
    The installation time at site will be remarkably short. After cable preparation the cable termination is completed within the hour. Compared to conventional oil filled termination that take at least five hours this is a significant reduction in time.
    Thorne & Derrick UK (tel 0191 4901547) are national distributors and worldwide exporters of LV-HV Cable Installation, Cable Jointing & Electrical Equipment - we service UK and global businesses involved in cable installations, cable jointing, substation and electrical construction at LV, 11kV, 33kV and EHV. T&D service utilities, power, construction, rail, mining, offshore, oil, gas, petrochemical and hazardous area industries.
    For more products please visit www.cablejoints.co.uk
    VIDEO : ABB Kabeldon 145kV Dry Cable Termination - IEC 60840 - See more at: www.cablejoints.co.uk/blog/art...
  • วิทยาศาสตร์และเทคโนโลยี

ความคิดเห็น • 12

  • @MrKushalindia
    @MrKushalindia 8 ปีที่แล้ว

    Thanks for sharing this video....very informative.

  • @eduardotrujillo9252
    @eduardotrujillo9252 10 หลายเดือนก่อน

    Thanks a lot!

  • @oscarlopez8261
    @oscarlopez8261 4 ปีที่แล้ว

    Muy bien videos y muy buena instalación saludos a persi

  • @zanelile2991
    @zanelile2991 6 ปีที่แล้ว

    Nice video - but, how many times do we get to terminate, are splice, cable, in a nice clean well lit, shop with an over head lift?

  • @abankitbahuguna
    @abankitbahuguna 4 ปีที่แล้ว

    Nyc

  • @cnccarving
    @cnccarving 6 ปีที่แล้ว

    but you have to make the parts first to assembly it..
    assembling likely nothing to designing and making it

  • @kickinwinghotboi883
    @kickinwinghotboi883 8 ปีที่แล้ว +1

    What are things like this used to power?