Building Foundation Part Two: Shale Yeah!

แชร์
ฝัง
  • เผยแพร่เมื่อ 26 มิ.ย. 2024
  • Building foundation continues as load after dump truck load of shale arrived. Needed nine loads to fill this space and level it out.
    Grade Level. Next comes the grader attachment. Shale, yeah!
    This video series continues throughout Summer 2024 on TH-cam. Be sure to subscribe so ya don’t miss it! 😉
    With Zach Smith Contracting, Bobcat Operated by Carlton Coblentz, Building by JAG Buildings, Tulsa.
    Video created with PowerDirector app, music “Cogs in the Machine” by Symphonic Planet
  • แนวปฏิบัติและการใช้ชีวิต

ความคิดเห็น •