Sir i have a question . As u said EIGRP will calculate path based on the cost .. Lower the cost ..higher the bandwidth but at the end you said it take the low bandwidth which means higher cost thn ? Plz clear the confusion
the cost in EIGRP is called Metric. and Metric = bandwidth + delay ; the delay is the total or the sum of all delay along the paths and the bandwidth is the minimum or the lowest bandwidth along the path.
5:30 if i am not wrong, EIGRP chooses the lowest bandwidth till u reach a destination, as contrary to what u taught. u said correct in 12:16 though
Hello Sikandar, If I am not wrong In EIGRP metric calculation you have said 10^8 instead of 10^7
yes 10^7
YES, 100,000,000/64*256
S u r right
metric calculation = (10^7/bw) + (delay/10) * 256
Sir i have a question . As u said EIGRP will calculate path based on the cost .. Lower the cost ..higher the bandwidth but at the end you said it take the low bandwidth which means higher cost thn ? Plz clear the confusion
the cost in EIGRP is called Metric. and Metric = bandwidth + delay ; the delay is the total or the sum of all delay along the paths and the bandwidth is the minimum or the lowest bandwidth along the path.
thanks teacher
Thanks sir
Not clear video ..
But translate good
it's difficult... :(
Thanks sir