I-35 NEX September 2024 UPDATE

แชร์
ฝัง
  • เผยแพร่เมื่อ 23 ม.ค. 2025
  • "35 seconds behind I-35 NEX" is a snapshot of the progress on the I-35 NEX project. The bridge deck of the elevated lanes on westbound I-410 near Perin Beitel is almost complete. Check out the column caps that are under construction on southbound I-35 and Thousand Oaks Drive, and the bridge beams stretching from Toepperwein Road and Shin Oak Drive on I-35. See how much headway we've made in those and other locations.

ความคิดเห็น •