EP5 POOL AND BACKYARD - 2 days of concrete demo

แชร์
ฝัง
  • เผยแพร่เมื่อ 14 ต.ค. 2024
  • With some rain delays we get 2 days of concrete demo. The inground gunite / concrete pool is getting a 100% remodel. The interior white plaster is to be removed and replaced with Aqua Blue Pebble finish. The Quick Clean in floor cleaning system is being removed. The bond beam (the raised back wall), the coping, the waterline tile, all will be redone. All the pool equipment is to be replaced. All the concrete decking will be removed and replaced.
    This work is taking place in the Bay Area in California. The work is being performed by Pacheco Landscape & Pool Construction out of Clayton, California. We met with many swimming pool remodelers. Pacheco was not the cheapest however, we felt good about the experience and knowledge after meeting with the owner. Cris has been at the job site every day so far.
    Keywords: Pebble Tech Quartz Pebblecrete Pebble Sheen Stone Scapes Stonescapes Diamond Brite Plaster QuikClean Pentair Hayward A&A Paramount Dolphin Polaris Jandy travertine

ความคิดเห็น • 2

  • @mmotorcycles9497
    @mmotorcycles9497 7 หลายเดือนก่อน +1

    Man it keeps getting worst looking. I know it will all be good but crazy how it’s going

    • @KensGarage1
      @KensGarage1  7 หลายเดือนก่อน

      Yes, in this video we are definitely still in the DESTRUCTION phase. Stay tuned 🙂