Start up and Commissioning of HVAC Rooftop Units & Troubleshooting Factory Issues
ฝัง
- เผยแพร่เมื่อ 11 ก.ค. 2024
- Start up and Commissioning on twenty four HVAC Rooftop Units. Twenty three of the twenty four units had issues from the factory that had to be sorted out. We created and applied unit labels, performed a start up, and documented the process. In this video, we install a SS4 pan float switch, and then got into all the fun that come with modern HVAC unit shipments.
0:00 - Intro
0:25 - Material list
0:58 - Labels
1:03 - Commissioning set up
2:07 - Commissioning - Visual inspections
2:44 - Commissioning - Voltage
3:47 - Commissioning - Jade controller setup
5:46 - Commissioning - Rotation
6:23 - Commissioning - Gas
10:01 - Commissioning - Test ports
11:00 - Commissioning - Tachometer
11:45 - Commissioning - Tanking readings
14:07 - Install a Safe-T-Switch Overflow Shut-Off Switch SS500
16:56 - Troubleshooting Spark tubes
18:03 - Drain pan crack
18:38 - Curb leveling
18:54 - Troubleshooting - Loose connector
19:52 - Troubleshooting - Econo wiring issue #1
20:50 - Fly by
21:04 - Troubleshooting - Econo wiring issue #2
23:02 - Troubleshooting - Econo wiring issue #3
27:13 - troubleshooting - Econo wiring issue #4
27:39 - Outro