Even More PRR Changes
ฝัง
- เผยแพร่เมื่อ 22 ก.ย. 2024
- Detailed description of all the changes:
1 - Ragan Interlocking now has proper track work
2 - Highspeed curves between chester/ragan are now sharper and work well with ORTS tilt feature
3 - Wilmington station is rebuilt off track charts
4 - Distance Between Landlith and wine has been reduced (had to settle with shorter curves for proper track distancing)
4a - Wilmington Shops can now be properly rebuilt
5 - Holly redone with 3000d turnouts and 4_7 crossovers
6 - Track between Bell and Holly was re-done and is scaled better
7 - Claymont high level station is now in service
8 - Better spacing between Chester/Highland Ave/Marcus Hook/Claymont stations
9 - Speeds reflect a mix of Acela/Regional speeds
10 - Hook interlocking exists and will connect to said power plants and factories located in the Marcus hook area (ongoing track work)
11 - Signals reflect locations in real life
That covers the heavy duty changes, scenery will be added slowly overtime starting with roads/buildings and finally vegitation. As a Bonus the NFS autorack yard located behind Wilmington Shops will be added and will connect at Ragan.