Kindly make a video in detail about the net metering procedure ( K Electric ) . Begins from issuance of token till issuance of green meter . It will help users to understand clearly. JazzakAllah
2nu hi inverters chal jaty hain net metering par.. kyun k net meter three phase hai.. us par ap single phase inverter bhi chala sakty hain or three phase bhi.
Asalam o alikum Bahi me apni shop k liye 6 kv ka Solar system lagna chata hoon shop k liye iesco k kia rules hoty hain kia A2 connection k koi monthly extra tax wagera hota hai ?
Bai mery pas 15 kw ka Solar System lga howa hai mery ghar k Samny bijli k pool lga howa ha 3 fase hai , Kia without transform net meter lag skta ? Jazak Allah
dear it depends apon your sanctioned load. agar wo 10 hai to ap usky 1.5 times (15 kW) tak ka system lgwa sakty hain.. transformer lgwany ki zrurat nhi parti
Aoa, Mohsin bhai, great video, I am in the process of getting a green meter through a solar company (the structure+panels+inverter and relevant apparatus has been installed) but I have noticed that whenever a representative from WAPDA comes over to inspect the system,they always have a file with a KW or even 2.5KW System higher written than what I got installed. I finalized a system of 5KW with the solar company but when someone from wapda comes, they have it listed down as 6KW or even 7.7KW. Can you reply to me in this thread explaining this or if you could make a video on this, it would be highly appreciated. jazakallah.
w.a.s. Alex, hope you are doing great! Thanks for writing your query. That is a strange thing because normally EPC Contractors do it other way around, as they show less capacity in the documents to avoid hassle from Wapda departments. But, you need to cross check this against the submitted copy of net metering file. You can ask your vendor to provide a soft/hard copy of net metering file submitted. Also, you need to ensure with your vendor that the license being issued is of same capacity that your panels are being installed of. But this is not a big issue, once your green meter will be installed, no one will ask you for any clarification against the submitted documents :)
Kindly make a video in detail about the net metering procedure ( K Electric ) . Begins from issuance of token till issuance of green meter . It will help users to understand clearly. JazzakAllah
What happens to the old meter when you install net meter
Kya ham hm total 2 bore kr sktey hain aik Ac aur 2nd lightenting arrestor+dc earthing liye common 1 bore kr sktey??
How much load can be increased without installing transformer in lesco. I have 15 kw ongrid inverter and 22 panel of 575watt
single phase inverter or 3 phase inverter ka kia role hy net mettring m?
2nu hi inverters chal jaty hain net metering par.. kyun k net meter three phase hai.. us par ap single phase inverter bhi chala sakty hain or three phase bhi.
Bahria town Rawalpindi main single phase inverter par net metering ho Katie hai ?
Salam Mr Abdullah, Jee karwai ja sakti hai..
Asalam o alikum
Bahi me apni shop k liye 6 kv ka Solar system lagna chata hoon shop k liye iesco k kia rules hoty hain kia A2 connection k koi monthly extra tax wagera hota hai ?
w.a.s. apka meter three phase me convert hoga. usky taxes zyada hoty hain.. lekin 1 2 kW extra lgwa len taky apka bill zero aye.
Can I use a 5KW Single Phase ongrid solar inverter with a three phase green meter?
yes you can.
Iesco k under invertor b 3 phase chaye ya 1 phase chl jata hai..
behtar hai k 3 phase inverter use karen for net metering. taky balance export ho
@@solarmentor4250 pahly 1 phase py netmetring allow thi but ab suny main a raha k band kr iesco ny is bary koi update ap k pas?
@@solarmentor4250 invertor lgwa chuka hu ab asa suny main aya hai.. Ab kia krna chaye
ho jaye gi net metering. Speedmoney se sab ho jata hai WAPDA me. and there isn't any technical issue that can be generated due to this.
@@solarmentor4250 phr thk hai jinsy lgwya wo kah rhay lag jyae pr mujy doubt tha so shukran..
Bai mery pas 15 kw ka Solar System lga howa hai mery ghar k Samny bijli k pool lga howa ha 3 fase hai , Kia without transform net meter lag skta ? Jazak Allah
Yes
dear it depends apon your sanctioned load. agar wo 10 hai to ap usky 1.5 times (15 kW) tak ka system lgwa sakty hain.. transformer lgwany ki zrurat nhi parti
Aoa, Mohsin bhai, great video, I am in the process of getting a green meter through a solar company (the structure+panels+inverter and relevant apparatus has been installed) but I have noticed that whenever a representative from WAPDA comes over to inspect the system,they always have a file with a KW or even 2.5KW System higher written than what I got installed. I finalized a system of 5KW with the solar company but when someone from wapda comes, they have it listed down as 6KW or even 7.7KW. Can you reply to me in this thread explaining this or if you could make a video on this, it would be highly appreciated.
jazakallah.
w.a.s. Alex, hope you are doing great! Thanks for writing your query. That is a strange thing because normally EPC Contractors do it other way around, as they show less capacity in the documents to avoid hassle from Wapda departments. But, you need to cross check this against the submitted copy of net metering file. You can ask your vendor to provide a soft/hard copy of net metering file submitted. Also, you need to ensure with your vendor that the license being issued is of same capacity that your panels are being installed of.
But this is not a big issue, once your green meter will be installed, no one will ask you for any clarification against the submitted documents :)
@@solarmentor4250 Thanks for the reply, subscribed and will keep on watching.
thanks a lot :)
Can we get net metering without converting to three phase supply ?
not at the moment. Only Three Phase Net Meters are available in all DISCO's of WAPDA
No But joghar ho sakhta hai
Kia rent walay Ghar me net metering ho sakti ha ?
Yes, with the permission of the house owner. Net metering unky nam par hi hogi jinky nam par bill a rha hai
100% yes
Location Burewalla
Salam, I need a quotation for an online solar system of 5KW at my home in Rawalpindi. (How much more will it cost for net metering).
In mepco area net metering is around 1.6 lack
it will cost you around 9.5 lacs with green meter and 10 kW inverter.
Kya ap net metering karwaty hain
Yes
Yes.
Sir apna contact number share kar sakty hain..Karachi mai karwani hy..
03212117655
Brother, I'll suggest you to contact a local vendor from Karachi. We can provide services in Punjab effectively.