Ma-Shaa-ALLAH ! ! ! Well needed VIDEO. May ALLAH عزوجل Protect Our Nation & Our Country PAKISTAN from all Internal & External Enemies. Aameen ! ! ! May ALLAH guide all of us towards his path of TRUTH. Aameen ! ! ! TRUTH Lovers ko SALAM ! ! !
Lightning arrestor should be installed at a separate place/location, not on the frame on which the panels are mounted, even if it is installed on insulated material like rubber base.
Thanks for making another awareness video on this demanding topic showcasing another on-ground implementation. I hope we get to see good, reliable and reasonable service providers in consumer solar industry.
All solar series parts: Part One: th-cam.com/video/ej2Yyt7nRP0/w-d-xo.html Part Two: th-cam.com/video/01FV4tXLwT8/w-d-xo.html Part Three: th-cam.com/video/k2qwEDSCzb0/w-d-xo.html Part Four: th-cam.com/video/MBOyAPtY5Xg/w-d-xo.html Part Five: th-cam.com/video/_xNlsNhTdU0/w-d-xo.html Part Six: th-cam.com/video/tZ0yEjiR6zU/w-d-xo.html Part Seven: th-cam.com/video/YQTb8xqzHgM/w-d-xo.html Part Eight: th-cam.com/video/zucMlTF_Qbc/w-d-xo.html
We install large ongrid inverter and a small hybrid hybrid inverter just for light load in case of shortfall . Hybrid inverter is on standby normally and operates only during short fall. More over thier battery life estimate extends
Can you please do a video of how the house wiring should be done to accommodate Soler? Is the soler connected to all the load in the house or only emergency load via seperate DB?
Let me add that one lithium ion (48v,100ah) is equal to 4x 12v,100ah Tall tubular battery but will give you almost double the backup time due to their depth of discharge (DOD). Lithium ion has 95% DOD while TT can safely be discharged only upto 50%.
Salman looks quite reasonable. He could be bit expensive but i think any one who will buy his system will not regret. However this my personal opnion please use your own judgement and market survey...
I was wondering if there is a way to add a UPS with Grid-Tied solar system to avoid load-shedding. It will not run ACs but will atleast provide some back up for fans and lights.
Awesome videos you upload normally with great efforts and detailed search on the product specifications. I must suggest there are so many projects of wind related power energy. It is more cheaper then solar and more effective then solar. Till today as per my search. It also not required much space as solar required. Normally those who are living in flats can also install that wind energy system. Hope you can do a deep research on it.
what system will be applied in a house that is using UPS as well AS Generator as backups sources but now wants to added SOLAR as well and can we also install net metering with it
Adding my comments: If one inverter get damaged, you can add the string to the other inverter provided that there are two MPPT in second Inverter if not then it require the panel of the same size and number in order to connect in parallel.
lighning arrestor bhai sab ne structure par e lagaya hua hai yani bjili gire to sare panels jal jayeinge, lightning arrestor alehda side pr hona chaheye
Dear owais on grid system mai ager grid se electric fail hojata hai to kiya ail chota sa mppt controller laga ker on grid system ko power de ker system nahi kiya ja sakta???? Ye sawal hai.
Hi sir, ma apni ghar ma solor k sath wind turbine lagana chata hon haripur k pass gao hai jab gaogia bijli nai hoti.typhoon ata hai tu 3 din no light kia possible hai enhe system k sath wind turbine lag jai muje mil raha hai 10kw ka aur sath ma solor panels 3kw k lagana chata hon.
Thank you Owais. I have a query here. Can one install a separate UPS system (Sign wave/Modified Signwave) of lets say 2KW along with a 10KW Grid-Tie Systems ? Will I need to install a separate wiring for each Solar solution and UPS ?
I believe the Grid Tied system is connected to the Main, making every gadget/point eligible to run on Solar, provided the Grid is up and running. Therefore, the only wiring that you would be required to do is for the UPS purpose at your selected gadgets/ points. Have a nice day :)
بھایی 5 اور 10kw کے hybrid والے انورٹرز کی موجودہ قیمتوں پر بھی ایک ویڈیو بناٸیں۔ growatt، solis،goodwe وغرہ جیسی اچھی کمپنیوں کے اور inverex کے۔ بہت شکریہ
Good vid, however... 1. Lithium batts must/should be discharged daily atleast down till 80 %soc and kept in an ambient 25 degree environment if you were to expect anything close to a 10 yr life. 2. Wrong perception, lithium batts do not cost more than the grid in usage, rather way less, like i use mine to offset 4 hrs of peak time and then they charge back up in the day. You do the maths. Wet batts have a max dod of 60 percent whereas lithium is around 95. You take out 8 kwh and put in 8.3 to get bk to the same soc. 3. Pls also cover ac/dc coupling, no need to hook up fixed panels to the hybrid inv. Ongrid inv panels can auto switch when AC out. Again, good vid, but I wouldnt recommend any installer since then you are part of whatever goes wrong, if anything. My simple Q's to any installer.... Do you hv a thermal imager? Do you use 8, yes 8 M8 SS or galvanized screws per panel as in all panel manufacturers manual? Jinko/Longi etc will not honor warranty claims if less than 8 M8. Do you even know the torque rating of each bolt involved? Do you have torque drivers/wrenches? 18 ft/lb or in/lb (cant recall which) is what each panel screw needs. 6-8 for nitrox (deye) batt conn. I can go on and on. I havent found a single installer who has all these, hence I dont recommend anyone. I had to get all this done providing my own torque tools imager hydraulic crimper etc. Lastly, that arrestor, is it shading the panels? Did they use a copper strip or 2AWG wire to the ground? The panels inclination is wrong in the sense that over time limescale will accumulate in the lower couple inches. Again, I wouldnt recommend anyone since im partially responsible then. I can mention a dozen other issues but lets keep this short lol. Keep it up.
I'm also planning on sourcing the equipment from market myself and get them installed under my supervision. Might get around the premium on the price charged by the installers besides their own margin. Also wondering if the combination of a large capacity grid tied inverter with supplementary hybrid inverters of nominal capacity for blackout/loadshedding would cost lesser than going all in on a hybrid inverter.
@@belalmir5 If you can, that really is the ideal way to go about it. All details available on the net. If youre in Lahore I can assist you (installation side). Dont go all hybrid, well, you can if you have single phase wiring inside your home, they will change it to a 3 phase green meter but you will still be utilizing 1 phase. If on a 3 phase existing wiring, then hook up one ongrid since they are are tough. We cant afford/get victron or schneider so at best its Deye (Inverex). Its all ODM here, no such thing as local r & d. Also, for the hybrid, you can add dc coupling, that way when the grid goes out, your existing on grid panels (the number you choose as per required mppt V and A of the hybrid) will power up the hybrid via solar. An ATS will be required, can also be changed over manually. I have a 15 kw goodwe and a 8 kw nitrox, nitrox exports at the same time too, just on 1 phase. On grid is a way cheaper solution, it all depends on your budget since prices now a days are ridiculously high and hybrid technology is by no means nearly as reliable as their on grid counterparts but some of the newer ip65 ones are getting very good and come with a 5 year warranty. Good luck.
@Usman Munawar Hayat Thank you very much for your precious guidance. Budget is a problem, that's why I'm thinking of going through the hassle of doing it myself and putting my engineering knowledge to some good use. I looked for DIY guide online but didn't find any detailed one. Have single phase wiring at home. Which inverter would you suggest for on grid option (say 10kW)? Which series of inverex or Deye? Also I'm thinking of gradually ramping up production by installing solar panels as the budget permits.
You are spot on. Due to these reasons I also Installed by myself. Regarding structure, I wish proper unitstruct channels and accessories becomes available here to build modular pre fab structure.
@@asimali9766 I would really love some in depth guidance. As for the structure, the roof is flat with no side walls, so pre fab L2 or even L1 would suffice
Bhai mujha ap pa boht bara aitraz ha ap answer ni karta ma na boht zoyada msgs kiya ha apko...plzźzzz bta da 2 fans chalay 2 lights konsa solar panal laga kitna ka lagay
Will the solar system prices go down? In the upcoming months? As now the price of 10kw is around 25 lacs which is insane! Because of the import ban and everything is being sold in black. Please answer.
Sir, I see this video some time before, and I approached Umer sahb he very kindly sent his survey team to my home in I- 14 Mr. Sheryar, after survey they did not reply to me.
@@syedowaisali thnx for the response sir i am planning on installing 10kw system but i am confused which hybrid inverter should i buy as market is saturated with chinese one and then too much difference in prices between different brands like crown solarmax inverex maxpower et cetra
Any idea if the combination of a large capacity grid tied inverter with supplementary hybrid inverters of nominal capacity for blackout/loadshedding would cost lesser than going all in on a hybrid inverter??
Tall Tubular ki life k hwalay se Molvi sb ne thorha mobalgha aamezi se kaam liya... 1 saal se 2 saal to simple lead acid b nikaal jaati hai, jb k Tall Tubular ki life zeyada hai.
Ma-Shaa-ALLAH ! ! ! Well needed VIDEO. May ALLAH عزوجل Protect Our Nation & Our Country PAKISTAN from all Internal & External Enemies. Aameen ! ! ! May ALLAH guide all of us towards his path of TRUTH. Aameen ! ! ! TRUTH Lovers ko SALAM ! ! !
❤❤❤
اَسْتَغْفِرُاللّٰه
Bhag ja ragzi harami
Mashallah #Ustade_Mohtram😊
❤❤
Lightning arrestor should be installed at a separate place/location, not on the frame on which the panels are mounted, even if it is installed on insulated material like rubber base.
It is recommended to provide separate grounding path for surge arrestor so it should be installed separately from the solar frame
Indeed a remarkable accomplishment, their performance has influenced Saudi Aramco to copy this vendor's official logo.
Hahahah
Hahahahaha 😂😂😂😂
No pun intended 😂
@@farhanAhmed-yq2wh😮😮😊😮😊
🤣 🤣 🤣
Finally, thank God. Brilliant job but still where is your personal 6 month analysis video? Been waiting for months now.
Thanks for making another awareness video on this demanding topic showcasing another on-ground implementation. I hope we get to see good, reliable and reasonable service providers in consumer solar industry.
Sub sa best thing emabdary ho Allah her cheez ma madad karta ha jazkalh
Bhai ye last me panels k andar ghus kr video wala idea acha tha..big fan bhai
All solar series parts:
Part One: th-cam.com/video/ej2Yyt7nRP0/w-d-xo.html
Part Two: th-cam.com/video/01FV4tXLwT8/w-d-xo.html
Part Three: th-cam.com/video/k2qwEDSCzb0/w-d-xo.html
Part Four: th-cam.com/video/MBOyAPtY5Xg/w-d-xo.html
Part Five: th-cam.com/video/_xNlsNhTdU0/w-d-xo.html
Part Six: th-cam.com/video/tZ0yEjiR6zU/w-d-xo.html
Part Seven: th-cam.com/video/YQTb8xqzHgM/w-d-xo.html
Part Eight: th-cam.com/video/zucMlTF_Qbc/w-d-xo.html
Can you share the number of Umar sb
We install large ongrid inverter and a small hybrid hybrid inverter just for light load in case of shortfall . Hybrid inverter is on standby normally and operates only during short fall. More over thier battery life estimate extends
But we will not be able to produce and supply to grid, in case of loadshedding?
I always consult your vlogs whenever I need to do any research in relative domains
Can you please do a video of how the house wiring should be done to accommodate Soler? Is the soler connected to all the load in the house or only emergency load via seperate DB?
Thank you very much Bro always very informative video, much appreciated
Let me add that one lithium ion (48v,100ah) is equal to 4x 12v,100ah Tall tubular battery but will give you almost double the backup time due to their depth of discharge (DOD). Lithium ion has 95% DOD while TT can safely be discharged only upto 50%.
Thank you Syed Owais Ali, very informative indeed...
Salman looks quite reasonable.
He could be bit expensive but i think any one who will buy his system will not regret.
However this my personal opnion please use your own judgement and market survey...
I was wondering if there is a way to add a UPS with Grid-Tied solar system to avoid load-shedding. It will not run ACs but will atleast provide some back up for fans and lights.
its very simple.. like aik normal UPS kee trah hee install kar lay.. think of ups as another appliance
Awesome videos you upload normally with great efforts and detailed search on the product specifications. I must suggest there are so many projects of wind related power energy. It is more cheaper then solar and more effective then solar. Till today as per my search. It also not required much space as solar required. Normally those who are living in flats can also install that wind energy system. Hope you can do a deep research on it.
Well explained, beneficial for both prosumers and installers
You're like big brother. Great informative video
Hybrid inverters are totally fine and upto mark.
Kya baat ha market men sb short ha aur cost neche a rahi wah👍
Hello bawaseer
In my opinion the biggest purpose of installing solar for household use is not ROI. It is convenience. ROI matters more for commercial installments.
Agreed
Now a days electricity is very expensive so roi also matters
How about setting up a small wind turbine?
I have a question: in above system, is grid-side output of both inverters getting combined into the green-meter?
what system will be applied in a house that is using UPS as well AS Generator as backups sources but now wants to added SOLAR as well and can we also install net metering with it
Adding my comments: If one inverter get damaged, you can add the string to the other inverter provided that there are two MPPT in second Inverter if not then it require the panel of the same size and number in order to connect in parallel.
Salam, agar on grid or grid tied inverter bunda lagai aur net metering na kare tu teek hai?
lighning arrestor bhai sab ne structure par e lagaya hua hai yani bjili gire to sare panels jal jayeinge, lightning arrestor alehda side pr hona chaheye
they use rubber installation so that current does not pass to panels.
aslamualikam . DC earthing main kya kya ata hai? or ak sath panels + inverter ko earthing ki ja sakti hai?
Dear owais on grid system mai ager grid se electric fail hojata hai to kiya ail chota sa mppt controller laga ker on grid system ko power de ker system nahi kiya ja sakta???? Ye sawal hai.
Do you suggest On Grid 6 KW system without Green Meter
Haji Turmaz sab nay to Aramco ka logo lagiya hova hayyyyy
AOA please discuss recommendation of single phase vs 3 phase inverter
Informative
Sny effort to develop dc appliances to avoid inversion losses?
I wish k ye video me pehle dekh leta, mene lahore me kisi vendor se kaam krwaya hai recently or me satisfy nahi hun
Pls make video on electric bike
@ Owais bhai
Kindly in light of new govt regulations of gross metering, plz advice that which method would be better?? Hybrid or on grid inverter
Hi sir, ma apni ghar ma solor k sath wind turbine lagana chata hon haripur k pass gao hai jab gaogia bijli nai hoti.typhoon ata hai tu 3 din no light kia possible hai enhe system k sath wind turbine lag jai muje mil raha hai 10kw ka aur sath ma solor panels 3kw k lagana chata hon.
Sir hmary pass main issue wind speed ka hay. wind speed itni hoti hay k solar panel tooot jaty hen uska kia solution ay
Awais sb is there a way to install switch-over switch on a grid tied system to be used in case of loadshedding?
Thank you Owais. I have a query here. Can one install a separate UPS system (Sign wave/Modified Signwave) of lets say 2KW along with a 10KW Grid-Tie Systems ? Will I need to install a separate wiring for each Solar solution and UPS ?
I believe the Grid Tied system is connected to the Main, making every gadget/point eligible to run on Solar, provided the Grid is up and running.
Therefore, the only wiring that you would be required to do is for the UPS purpose at your selected gadgets/ points.
Have a nice day :)
The hurdles of net metering, i think off-grid is best in terms of solution for no loadshedding.
hybrid system is not good it does not generate much electricity when compare to on grid system.
On grid is also not good, if you have loadshedding you will have no light at home
Off grid is i think better option
@@hasnainali2032 if you already have a ups installed in your home then that's not a problem.
@@madil2259 you mean ups with on-grid system?
بھایی 5 اور 10kw کے hybrid والے انورٹرز کی موجودہ قیمتوں پر بھی ایک ویڈیو بناٸیں۔ growatt، solis،goodwe وغرہ جیسی اچھی کمپنیوں کے اور inverex کے۔ بہت شکریہ
sir soler plets ya cell repir krny ky ley koi rahnmai kr dyn thanks
Awais bhai off grid k faedy or noqsanat bta dain
Agar already ups laga ho to kia ongrid system lagwana chahye
What is the feasibility of a 10kva ups with a high batteries backup say 20kw backup and charging with solar plus wapda and no export to wapda?
Kya on grid inverter ke liye green meter lazmi ha?
Agr meter na ho phr hum kcy Apne ghr ka load chal skty han on grid inverter per
I have an ups system already set up in my house, so will it work with grid-tied system? (and also does on grid mean net metreing?)
On grid system is for net metering
And Yes UPS works with Ongrid system
Is there any system which works at might other than wapda.
Sir problem betterys hai din ko on rahe or off grid bhi ho raat ko loadsheding kabol hai without battery batao
Good vid, however...
1. Lithium batts must/should be discharged daily atleast down till 80 %soc and kept in an ambient 25 degree environment if you were to expect anything close to a 10 yr life.
2. Wrong perception, lithium batts do not cost more than the grid in usage, rather way less, like i use mine to offset 4 hrs of peak time and then they charge back up in the day. You do the maths. Wet batts have a max dod of 60 percent whereas lithium is around 95. You take out 8 kwh and put in 8.3 to get bk to the same soc.
3. Pls also cover ac/dc coupling, no need to hook up fixed panels to the hybrid inv. Ongrid inv panels can auto switch when AC out.
Again, good vid, but I wouldnt recommend any installer since then you are part of whatever goes wrong, if anything.
My simple Q's to any installer.... Do you hv a thermal imager? Do you use 8, yes 8 M8 SS or galvanized screws per panel as in all panel manufacturers manual? Jinko/Longi etc will not honor warranty claims if less than 8 M8.
Do you even know the torque rating of each bolt involved? Do you have torque drivers/wrenches? 18 ft/lb or in/lb (cant recall which) is what each panel screw needs. 6-8 for nitrox (deye) batt conn. I can go on and on. I havent found a single installer who has all these, hence I dont recommend anyone. I had to get all this done providing my own torque tools imager hydraulic crimper etc.
Lastly, that arrestor, is it shading the panels? Did they use a copper strip or 2AWG wire to the ground? The panels inclination is wrong in the sense that over time limescale will accumulate in the lower couple inches. Again, I wouldnt recommend anyone since im partially responsible then. I can mention a dozen other issues but lets keep this short lol. Keep it up.
I'm also planning on sourcing the equipment from market myself and get them installed under my supervision. Might get around the premium on the price charged by the installers besides their own margin. Also wondering if the combination of a large capacity grid tied inverter with supplementary hybrid inverters of nominal capacity for blackout/loadshedding would cost lesser than going all in on a hybrid inverter.
@@belalmir5 If you can, that really is the ideal way to go about it. All details available on the net. If youre in Lahore I can assist you (installation side). Dont go all hybrid, well, you can if you have single phase wiring inside your home, they will change it to a 3 phase green meter but you will still be utilizing 1 phase. If on a 3 phase existing wiring, then hook up one ongrid since they are are tough. We cant afford/get victron or schneider so at best its Deye (Inverex). Its all ODM here, no such thing as local r & d. Also, for the hybrid, you can add dc coupling, that way when the grid goes out, your existing on grid panels (the number you choose as per required mppt V and A of the hybrid) will power up the hybrid via solar. An ATS will be required, can also be changed over manually. I have a 15 kw goodwe and a 8 kw nitrox, nitrox exports at the same time too, just on 1 phase. On grid is a way cheaper solution, it all depends on your budget since prices now a days are ridiculously high and hybrid technology is by no means nearly as reliable as their on grid counterparts but some of the newer ip65 ones are getting very good and come with a 5 year warranty. Good luck.
@Usman Munawar Hayat Thank you very much for your precious guidance.
Budget is a problem, that's why I'm thinking of going through the hassle of doing it myself and putting my engineering knowledge to some good use. I looked for DIY guide online but didn't find any detailed one.
Have single phase wiring at home. Which inverter would you suggest for on grid option (say 10kW)? Which series of inverex or Deye? Also I'm thinking of gradually ramping up production by installing solar panels as the budget permits.
You are spot on. Due to these reasons I also Installed by myself. Regarding structure, I wish proper unitstruct channels and accessories becomes available here to build modular pre fab structure.
@@asimali9766 I would really love some in depth guidance. As for the structure, the roof is flat with no side walls, so pre fab L2 or even L1 would suffice
What about generator when load shading
How to clean solar pannels ? Is pe b videos btae
AOA Can you please clarify if you were paid for this company recommendation as big outlay for people i think its fair question
very good anylisis. keep up the good work.
Poor English 😡😡
Kia ya lithium battery load backup main b 4 tubpler batteries kitni backups deti hain..? Koi banda jawab de ?
Good work but aik nai video Bano jo sab topics cover Kare aur graphics use Hu Jai Tu video ka Maza hi ai ga
nice update awais bhai
please more detail about ac, dc and pv (in case of lighting) grounding process
If the system is smaller than 5kw then lightening arrestor is necessary or not?
good information and thanks
Owais bhai in the two years of your hybrid system installation How many times have you faced maintenance issues or changed batteries
Wish this was in English. Everything about the video, except the video itself, is in English. Looks like great topics
Well, it's a South-Asia targeted video, mate.
Where are ya from ?
@@rodger3352 got you. You guys type in English but speak another language? Interesting. I’m New Mexico, U.S. thanks for the video anyway 🤭
Salam. Dear mai nay apnay tubewell k liye solar system lgwana hai. Kindly guide kar dain. 20hp ki motor hai tubewell ki
On what rate wapda purchase a solar unit
Bhai mujha ap pa boht bara aitraz ha ap answer ni karta ma na boht zoyada msgs kiya ha apko...plzźzzz bta da 2 fans chalay 2 lights konsa solar panal laga kitna ka lagay
Aoa, please recommend any vendor in rwp/isb for 5KW solar system installation
Nice
Ap k pass Old used complete set up available hei.
Aoa brother now which solar system is best in pakistan
Will the solar system prices go down? In the upcoming months?
As now the price of 10kw is around 25 lacs which is insane! Because of the import ban and everything is being sold in black. Please answer.
Assalmoalikum, do you give service in Karachi..or any 1 you recommend..I am interested.. thanks
Give salman no in isl.what is use of ups in it?
It is confusing. When grid light is off, why solar panel will not produce electricity? Is it not become like off-grid?
Assalam.o.Allaikum
Bhai? CHIQ SDH-18QFG/18Q2 1.5 ton Kaisa model h?
Daraz pr 12.12 sale m lga hua Lena chaheye k ni?
Kindly guide.
Turmaz Energy AEDB ki list mei ni hey.
Any recommended Services provider with AEDB license please?
Whats rhe difference if u are on aedb or not and how to check ?
Molve dont have any information about battery
Good work Brother
Common words was top notch
Thanks sir
How would you clean so High panels??
@@parvezmalikvlogs1311 😂😂😂😂😂😂
Never mind bullies..
There are various ways to clean panels..
Aik Solar cleaner aata hai under 1 lac, it's best for cleaning panels
Good question
@@parvezmalikvlogs1311 😂
Ongrid system mien day ka time mien agr load shedding hoti ha tu bijli jaye gi ka nai
Jaey gi
Lahore ma 5kv which company suggest
From 2 min onwards the sounds from the left in the video were coming from right and vice versa.
I want to install 10 Kw system. OFF Grid
Meri to samaj sa bahar ha Ac to raat ko chalana ha majority. to faida solar ha sirf day wo bhi 9 to 4 major production.
Sir, I see this video some time before, and I approached Umer sahb he very kindly sent his survey team to my home in I- 14 Mr. Sheryar, after survey they did not reply to me.
There is one safety which i dont see and that is unavailbilty of a fire ball over the invertors
Turmaz Energy kitnay mn lga k day rha 6kv system
Bhai maine 4 months se paise diye hain nhi aa rhe ha
Ampere ?
nice video
Loved it
Dear sir does solar max support smart loading in parallel mode i can see you have two inverters in parallel?
No it doesn’t
@@syedowaisali thnx for the response sir i am planning on installing 10kw system but i am confused which hybrid inverter should i buy as market is saturated with chinese one and then too much difference in prices between different brands like crown solarmax inverex maxpower et cetra
Any idea if the combination of a large capacity grid tied inverter with supplementary hybrid inverters of nominal capacity for blackout/loadshedding would cost lesser than going all in on a hybrid inverter??
Use hybrid inverters in parallel
@@abdulbaqi6170 why? Does two 5kw ones costs less than one 10kw hybrid inverter?
Since green meter takes time to install, can we run hybrid inverter system without issues during this interim time.
Yes
Tall Tubular ki life k hwalay se Molvi sb ne thorha mobalgha aamezi se kaam liya... 1 saal se 2 saal to simple lead acid b nikaal jaati hai, jb k Tall Tubular ki life zeyada hai.
محترم ہمنے سولر N Tلی ہیں انکا نام ہے TW SOLAR کیا Aگریڈ میں ہیں ؟
kindly share 3k solar system expenditure
6 lack
@@javaidnasir6633 thanks