Dc4375 - Last run before rebuild

แชร์
ฝัง
  • เผยแพร่เมื่อ 16 ธ.ค. 2024

ความคิดเห็น • 9

  • @SpottingWithSam
    @SpottingWithSam 20 วันที่ผ่านมา +1

    She was driven in, and I'm sure once she's finished she'll be driven out. Great video.

    • @OfficialSEIC2K6
      @OfficialSEIC2K6 15 วันที่ผ่านมา

      It's gonna be nice when DC #4375 is unveiled in 2025 wearing a fresh coat of paint and joining the DAs in mainline excursions

    • @trainfixer1981
      @trainfixer1981  15 วันที่ผ่านมา

      Indeed Sam!

  • @OfficialSEIC2K6
    @OfficialSEIC2K6 15 วันที่ผ่านมา +1

    DC #4375 has a nice 645E prime mover. It doesn't really look too good though. She was driven in on her own power. She's operational though but she requires some work before she can be put on the mainline. Fruit Salad livery has been chosen for DC #4375. Its expected to be in service in 2025

    • @trainfixer1981
      @trainfixer1981  15 วันที่ผ่านมา

      Currently it is non operational. The cab has been replaced with one from another loco, among many other parts. It should be close to new when done.

  • @blairhinton7535
    @blairhinton7535 หลายเดือนก่อน

    Your next project. Its basically a DA in drag isn't it?

    • @OfficialSEIC2K6
      @OfficialSEIC2K6 15 วันที่ผ่านมา

      It was originally a DA from Canada but it was rebuilt in Australia by Clyde Engineering with a completely different carbody and the newer at the time 645 prime mover

    • @trainfixer1981
      @trainfixer1981  15 วันที่ผ่านมา

      @@OfficialSEIC2K6 Nope same carbody from Da1540.

    • @trainfixer1981
      @trainfixer1981  15 วันที่ผ่านมา

      Yes it's the current project. Slightly "modernised Da" yes!