ขนาดวิดีโอ: 1280 X 720853 X 480640 X 360
แสดงแผงควบคุมโปรแกรมเล่น
เล่นอัตโนมัติ
เล่นใหม่
is there as specific time where the emu set will be painted or we'll have to wait a bit longer
NaGasgas ba Yung mga salamin bakit malabo?
these trains will be replaced with electric soon . where will they go?
They will be used by PNR. The electric railway will be an elevated one, and this DHL locomotive will be used on the at grade part.
Ganda ng view sr shrane!
I've never seen ma boi shunting
Bumabyahe na po ba si EMU 04? Or pinipinturahan pa po?
Yes paminsan miinsan ginagamit sa commuter para ma fillup lang needs sa commuter.
921 go shunting
is there as specific time where the emu set will be painted or we'll have to wait a bit longer
NaGasgas ba Yung mga salamin bakit malabo?
these trains will be replaced with electric soon . where will they go?
They will be used by PNR. The electric railway will be an elevated one, and this DHL locomotive will be used on the at grade part.
Ganda ng view sr shrane!
I've never seen ma boi shunting
Bumabyahe na po ba si EMU 04? Or pinipinturahan pa po?
Yes paminsan miinsan ginagamit sa commuter para ma fillup lang needs sa commuter.
921 go shunting