WCE Seksyen 3: KESAS - Jalan Sungai Jati - Jalan Kebun - Sungai Klang - Lebuhraya Persekutuan

แชร์
ฝัง
  • เผยแพร่เมื่อ 13 ต.ค. 2024
  • The West Coast Expressway (WCE) / Lebuhraya Pantai Barat (LPB) is an interstate controlled-access highway running along the west coast of Peninsular Malaysia.
    The 233-kilometre (145-mile) expressway is currently under construction, with several sections open for public use.
    Once completed, the expressway will run between Changkat Jering, Perak and Banting, Selangor, following federal routes 5 and 60 for most of its route.
    The expressway will operate in three sections, with sections of federal route 5 completing the missing connections; these sections will be upgraded to limited-access roads.
    The expressway is expected to be fully completed by the end of 2024, except for a 10 km stretch from Section 7B which is expected to be completed by June 2026.
    The expressway is being built by Konsortium Lebuhraya Pantai Barat. Approval was given by the government for the construction, which was to begin from 20 December 2013 and was to be completed within five years.
    It originally was given route code E28 but later changed to E32, and E28 was used by Sultan Abdul Halim Muadzam Shah Bridge.
    The project was delayed and actual construction began in May 2014. Currently, a 9.7-kilometre (6.0 mi) segment between Kapar and Bukit Raja, a 19-kilometre (12 mi) segment from Hutan Melintang to Teluk Intan and a 45-kilometre (28 mi) segment from Lekir to Beruas are opened to traffic.
    Once the expressway is completed, it will be the fourth longest in Peninsular Malaysia, after the North-South Expressway Northern Route, the East Coast Expressway and the North-South Expressway Southern Route.
    #wce #shahalam #selangor #malaysia #fawwazmedia
    --------------------

ความคิดเห็น • 51

  • @Ranjauwalk
    @Ranjauwalk 6 หลายเดือนก่อน +13

    lambat betul WCE Selangor ni, huhu. terbaik WCE Perak.

  • @izzaniielachannel
    @izzaniielachannel 6 หลายเดือนก่อน +6

    Terima kasih admin atas perkongsian

  • @fiq3566
    @fiq3566 6 หลายเดือนก่อน +16

    Mau 5 tahun lagi siap ni. Yang berturap tu awal sangat turap, bukan boleh lalu lagi, dah pudar tarnya baru boleh dapat lalu. 🥴

  • @996Eddie
    @996Eddie 6 หลายเดือนก่อน +6

    Very good video

  • @safuanmj9261
    @safuanmj9261 6 หลายเดือนก่อน +2

    Jika boleh cuba share dari kesas ke banting pulak... Ramai yang nak tengok ni... Tq tuan

  • @husnymazlan8155
    @husnymazlan8155 6 หลายเดือนก่อน +11

    Assalamualaikum dan salam sejahtera.
    Saya ingin melihat tentang perkembangan pembinaan laluan Seksyen 3 Lebuhraya Persisiran Pantai Barat (WCE) antara bermula dari Persimpangan Bertingkat Lebuhraya Shah Alam (KESAS) hingga ke Lebuhraya Persekutuan berhampiran Kompleks Membeli Belah Aeon Bandar Baru Klang masih lagi yang sama ataupun kerja-kerja pembinaan seksyen berkenaan masih lagi berjalan di kawasan Seri Andalas, Sungai Kandis dan sama waktu dengannya. Itu saja
    Selamat Menjalani Ibadah Ramadhan Al-Mubarak
    Salam dari Mat Puncak Alam (Husnie)

    • @agilfulizan4667
      @agilfulizan4667 6 หลายเดือนก่อน

      Sungai kandis ni pintu masuk keluar wce ke atau laluan dia sahaja

    • @husnymazlan8155
      @husnymazlan8155 6 หลายเดือนก่อน

      @@agilfulizan4667 Tak tahulah saya

  • @hrixhisham
    @hrixhisham 6 หลายเดือนก่อน +4

    Saya nampak ada kawasan rumah dan kilang masih tak terusik lagi... Mungkin masih dalam rundingan... Payah ni kalau masih belum dapat win win situation.... Yg betul nya tinggi pampasan baru la cepat selesai...

  • @LordDarknessCS
    @LordDarknessCS 6 หลายเดือนก่อน +2

    Terbaik tuan , siap ada perjalanan drone lgi kat tepi , Bahagian selangor ni lambat sebab kilang² & rumah susah nak pindah ada masalah

  • @firdausinvesting
    @firdausinvesting 6 หลายเดือนก่อน +3

    Mcm mana tu ada kawasan in between tu ada kilang2 lgi.. boleh ke nak amik tanah tu?.. kenapa x kosong2 lg operasi kilang2 tu.. bila nk siap section tu mcm tu...
    Thanks for the video.. skrg dah nampak kenapa area sini slow gila..

  • @danielkamil4108
    @danielkamil4108 6 หลายเดือนก่อน +2

    Mantapla video siap ada peta

  • @atharali3516
    @atharali3516 6 หลายเดือนก่อน +9

    Belambak kilang / perumahan di kawasan laluan hway yg masih tersergam indah😅😅. WCE ni bukan baru. Dari zaman Samy Velu menteri Kerjaya lagi. Takkan tak settle² lagi?

  • @erwadisoib8507
    @erwadisoib8507 6 หลายเดือนก่อน +3

    Pagi ni 25.03.2024 .... Laluan Motor yang baru
    telah dibuka sepenuhnya di persimpangan WCE Dan Kesas

  • @haziqfaris3319
    @haziqfaris3319 6 หลายเดือนก่อน +10

    Salam tuan. Mohon update Banting - KESAS & Ijok - Tanjong Karang juga. Jasa mu dikenang. Terima kasih.

    • @Afiqqq._
      @Afiqqq._ 6 หลายเดือนก่อน +1

      dak kuala langat ke tuu ? 😂

    • @haziqfaris3319
      @haziqfaris3319 6 หลายเดือนก่อน

      @@Afiqqq._ aku area puncak alam. Ade jgk kdg2 gi area kuala langat haha. Da rase jem dkt dua2 area aku mention kat atas tu.

    • @firdausinvesting
      @firdausinvesting 6 หลายเดือนก่อน +1

      Betul.. kasi lps sampai tanjung karang jadi la.. part banting federal x siap pun x pa.. haha

  • @mohdsyafikmohdsyafik-v9l
    @mohdsyafikmohdsyafik-v9l 5 หลายเดือนก่อน +1

    cepatlh sikit siapkan drp sentosa ke skve..skrg dkt 40minit nk ke saujana putra kluar skve lalu jln kebun...😂makin teruk jamednya

  • @FaizAris
    @FaizAris 6 หลายเดือนก่อน +5

    😊❤️👍🏻

  • @muhdfauwazel-emin2132
    @muhdfauwazel-emin2132 6 หลายเดือนก่อน +2

    banyak highway dibina, masalah utama tetap sama jugak. TRAFFIC JAM@KESESAKKAN LALU LINTAS.

  • @marsita1
    @marsita1 6 หลายเดือนก่อน +1

    Bila naked siap? Banyak tanah yg belum di ambil alih . Kalau begini tak kan selesai projek ini.

  • @daengzool6023
    @daengzool6023 6 หลายเดือนก่อน +2

    Tolong jgn bawa laju laju kawasan Bruas. Takut terlanggar haiwan liar terancam.

  • @ramzen1976
    @ramzen1976 6 หลายเดือนก่อน +11

    Pengambilan tanah x selesai lagi sbb diorg mtk pampasan yg tinggi. Cmne nk siap camni. Mgkin 2 tahun lg la kot.

    • @amirism91
      @amirism91 6 หลายเดือนก่อน +9

      xpe siapkan bahagian banting sampai kesas dulu. at least org banting nak ke manjung ke boleh ikut highway lain mcm lksa, federal pastu masuk balik wce

    • @azizdabro1975
      @azizdabro1975 6 หลายเดือนก่อน +2

      ​@@amirism91Ada Jalan pintas selepas kluar hiway kesas...masuk jln kebun - kg jawa...teluk menegun - sg rasau - bkt Raja - wce nnksb👍

    • @khairulamri2686
      @khairulamri2686 6 หลายเดือนก่อน +2

      pengambilan tanah nmpmnye masih betul selesai makan masa lama lg lh nk siap area ne😅😅

    • @speedbird388
      @speedbird388 6 หลายเดือนก่อน +1

      Tuan tanah cekik harga la tu kan

    • @sheikhmuhammadshazwansshah7391
      @sheikhmuhammadshazwansshah7391 6 หลายเดือนก่อน +1

      ​​@@amirism91 setuju. Mana seksyen wce yg siap nak bukak dulu, bukak je dulu

  • @mecmike94
    @mecmike94 6 หลายเดือนก่อน +2

    Bang boleh update 8 conlay & Oxley tower?

  • @chonghongyi5935
    @chonghongyi5935 6 หลายเดือนก่อน +2

    Camne nak sambung higway tu? 3:56 - 4:40

  • @muhammadfaris7288
    @muhammadfaris7288 6 หลายเดือนก่อน +7

    Rasa projek seksyen 3 dh mula ni...tol sg kandis tgh buat..cuma bahagian meroboh je lmbt

    • @zaman50man73
      @zaman50man73 6 หลายเดือนก่อน +6

      Banyak kilang haram situ kasi roboh kalau degil bakar saja jika perlu

    • @agilfulizan4667
      @agilfulizan4667 6 หลายเดือนก่อน

      Maknanya ada pintu masuk ke keluar d tol sg kandis ni

  • @balicat4127
    @balicat4127 6 หลายเดือนก่อน +2

    Yang nak alihkan rumah ngan kilang tu ambil masa tu turun naik mahkamah tu

  • @limraymond1862
    @limraymond1862 6 หลายเดือนก่อน +2

    banting lama lagi😢😢😢😢

  • @nizamsaadanpbs8740
    @nizamsaadanpbs8740 5 หลายเดือนก่อน +1

    pd sy, WCE Seksyen 3 ni plg slow

  • @MeerSyad
    @MeerSyad 6 หลายเดือนก่อน +3

    Salam admin, tlg amik view EKVE plak area ampang

    • @hafizredhuan10
      @hafizredhuan10 6 หลายเดือนก่อน +1

      EKVE mcm terbengkalai je,teman xdengar cerita dah sejak thn lepas 🤔

    • @MeerSyad
      @MeerSyad 6 หลายเดือนก่อน +1

      @@hafizredhuan10dkt area ampang nmpk lah jgak kerja skit2😅 tpi belah lain sendu jer nengok, lagi2 area ukay perdana tu

    • @hafizredhuan10
      @hafizredhuan10 6 หลายเดือนก่อน +1

      @@MeerSyad ooo🥲

    • @MeerSyad
      @MeerSyad 6 หลายเดือนก่อน +1

      @@hafizredhuan10 katenya tahun ni nk buka berperingkat tapi nampak gaya cm dalam mimpi jelah😂

  • @sahabattabahas
    @sahabattabahas 6 หลายเดือนก่อน +3

    Bayar je pampasan mahal2...pastu cas tol mahal ckit....dorg gak yg lalu nanti

  • @fakrul7483
    @fakrul7483 6 หลายเดือนก่อน +8

    Seksyen yg paling bermasalah...cam mustahil boleh siap 2025. Silap2 5 tahun lg pn lom tentu siap.

    • @amirism91
      @amirism91 6 หลายเดือนก่อน +4

      selagi tak setel pampasan berjuta selagi tu xsiap

    • @azizdabro1975
      @azizdabro1975 6 หลายเดือนก่อน +10

      Area kg jawa tu MCM kilang X tersusun X teratur berselerak..betul ke berlesen tu..klau kilang Haram..wat pe nk bagi muka...runtuhkan aje..kalu berlesen demand tinggi X seperti pihak valuer syorkan..jgn bagi lesen operasi dah..nyusahkan org awam nk Guna tunggu hiway X siap2 area Ni!!

    • @caicai1123
      @caicai1123 6 หลายเดือนก่อน +16

      To-date, the land acquisition issues for WCE has been significantly completed. The land
      hearing process for the remaining eight lots of land relating to Section 3 (Shah Alam
      Expressway (KESAS) - Federal Highway Route 2) has concluded and the payments to the
      land owners has also been disbursed. WCE has commenced the process of taking possession
      of these related land.

    • @shukriwafiq5220
      @shukriwafiq5220 6 หลายเดือนก่อน +3

      ​@@caicai1123cepat sikit roboh smua bangunan tu dah berapa tahun org klang shah alam tunggu ni

    • @muhammadfaris7288
      @muhammadfaris7288 6 หลายเดือนก่อน +2

      @@shukriwafiq5220 excavator pun sebijik je yg meroboh..jenuh nk tggu siap😅