Setting up a new Evo Downtube
ฝัง
- เผยแพร่เมื่อ 5 ก.ย. 2021
- Unboxing and setting up a brand new downtube for an Evo Shearing Plant.
• Firstly, remove the downtube from the packaging and check to ensure no transportation damage has occurred.
• Remove the plastic cover from the end of the downtube.
• Ensure that this hole is located just below the ferrule before continuing.
• Insert a screwdriver into the hole and unscrew the cog from the end.
• Slide the short tube assembly onto the long tube assembly, lubricating with oil.
• Reinstall the cog that was removed to secure the short tube assembly in place.
• Remove the screwdriver from the hole, add some oil and screw the ferrule in place.
• Once done, tighten by using a pair of vice grips on the tip section only, never tighten from below this area.
• Next, generously lubricate the downtube.
• Your new downtube is now ready for installation!
• Insert the downtube into the Evo and ensure this light sits flush within the sleeve.
• The Evo may need to be switched on and off to allow the downtube to be raised into position.
• Once in position, clamp it in place.
Heiniger Australia: www.heiniger.com.au
Heiniger New Zealand: www.heiniger.co.nz - แนวปฏิบัติและการใช้ชีวิต
Cheers Team just replaced our 60+ Wolsleys today. Watched your videos to make sure we had everything togeather right. Although not at the end of a handpicked feeling pretty confident I can maintain the gear :)
Desearía escuchar en castellano Perú,
How come my down tube looks completely different can i send pictures as it looks diffent on that section