Eye opening for individuals who are planning to build a dream home. Very informative. Thank you for your effort and for giving your document to public.
Wow!! I have never seen anyone so openly listing all details with price along with inclusions and exclusion. Its not about being transparent, but it takes a lot of effort and dedication and to put all these details to open public, irrespective of getting business or not. It will definitely help people like me. And I'm so grateful to you for this. It really shows your confidence in your business model. Congrats and Way to go brother. -Abdul
Really impressed...detailed explanation, transparent approach, reasonable costs and payment etc. Iam lost of words to express my happiness after seeing your video. The explanation gives a feeling of trustworthiness and giving confidence to initiate construction immediately without any fear. God bless you.
As per video is excellent but in sites same job will be done as per u mentioned in video , so kindle send contract number need to build 1800 sqt in avadi
Good explanation We are going to plan our building co structuin by next month onwards , we are planning to construct by Porotherm brick, let us know that are you doing construction for Pototherm brick ?
Good candid video ... Thx for providing detailed explanation. Worth watching. One quick question, I have downloaded the document from Google drive, where you have given estimate for 2100 square feet. Does this include Stilt Flooring (SF), FF (1000 square ft) and SF (1000 square ft) and Staircase 100 Square feet? 47 lacs to 56 lacs. Is this correct?
Hi , I'm also looking for same plan. Did you got any info from builder? FYI, 30*40 = 1200sqft Plan is to go by silt ( full parking) + duplex from first floor.
Nanga 2500 sft house plan Enga parking area 550 sqft. Plan panni errukom 12*46 parking area sqft cost evalvu. Varum sir unga kita project pannalam endru errukom nanga coimbatore vadavalli area
Civil works (upto int&ext plastering) cost maximum of 60% of total project value, so your mode of payments is highly favourable for Contractors side. As per your details of payment modes, you get 90% of payment before even starting finishing works. Is it a trap for clients?
@@abdulganirifai The contractor is eligible to receive the 90% of the payment once External plastering is completed. It means by that time, 1.inner putty should be finished 2.electrical piping and wiring completed 3.door frames must be fixed 4.window grills are fixed 5. Compound wall and outer works are completed and plastered finished 6.Plumbing phase-1 works are done . In simple words- “After completion of External plastering Stage” means, SITE IS JUST READY FOR FLOORING works. By receiving that(10th stage) 10% payment, the contractor must 1.purchase and lay tiles 2.remaining partial external works must be completed 3.Gate and external staircase must be completed. 4.Surkhi must be completed After the above works completed, the contractor is eligible to receive the 11th stage- 5% By receiving this amount 1.Doors & windows 2.Switches 3.plumbing fittings On Handing Over Keys- 5%. Note: Personally I am shocked now, to think in your way if a contractor completes plastering and get 90% and ABSCOND. 😂😂😂 Thanks for the comment. Will make a video explaining the break ups of this schedule.
@silentvalleyconstruction Thank you sir for your prompt reply. I verified the sheet attached in the description, serial number 8 is missing that only created the confusion. By the way this was an amazing video guide to both the consumer as well as for rookie builders.
This channel is THE BEST to educate a layman to understand all about one's house construction
Eye opening for individuals who are planning to build a dream home. Very informative. Thank you for your effort and for giving your document to public.
Glad it was helpful!
Wow!! I have never seen anyone so openly listing all details with price along with inclusions and exclusion. Its not about being transparent, but it takes a lot of effort and dedication and to put all these details to open public, irrespective of getting business or not. It will definitely help people like me. And I'm so grateful to you for this. It really shows your confidence in your business model. Congrats and Way to go brother.
-Abdul
Glad you found this useful! And your heartfelt comment encourages us to do more!
Engineer Sir eye opener for Layman People Keep awareness
Really impressed...detailed explanation, transparent approach, reasonable costs and payment etc. Iam lost of words to express my happiness after seeing your video. The explanation gives a feeling of trustworthiness and giving confidence to initiate construction immediately without any fear.
God bless you.
@@RajkumarM-g7l Thank you sir!
Best wishes!
As per video is excellent but in sites same job will be done as per u mentioned in video , so kindle send contract number need to build 1800 sqt in avadi
Very Informative Sir Tqsm❤
Very Good ! Transparent specification and rate !!!! One small clarification. The rate is inclusive of GST ? Or Rxtra? Thanks.... Excellent
@@natarajankolandavel4432 No_Extra Charges in the name of GST if you are abiding our Payment modes.
Sir, 3500 sq ft. Duplex house. Can you able to do it in Namakkal.
Good explanation
We are going to plan our building co structuin by next month onwards , we are planning to construct by Porotherm brick, let us know that are you doing construction for Pototherm brick ?
Good morning sir Thank you for ur guidance 🙏🙏🙏💐💐💐❤
Good candid video ... Thx for providing detailed explanation. Worth watching. One quick question, I have downloaded the document from Google drive, where you have given estimate for 2100 square feet. Does this include Stilt Flooring (SF), FF (1000 square ft) and SF (1000 square ft) and Staircase 100 Square feet? 47 lacs to 56 lacs. Is this correct?
@@SivakumarPonnuswamy if u have a stilt floor then the total Area becomes 3100 sft
@silentvalleyconstruction Thanks for the clarification
சார் தான் எங்களுக்கு சென்னையில் construction பண்ணுகிறார். 👍
Hariharan Sir, Thank u for giving us opportunity to build your Dream Home. ❤
Which area?
@@sankmaathan6184 Vengampakkam !
Good morning sir fantastic Detaiing 🎉
Thank you.
Sir maduraila construct panna mudiuma sir
Sir if we go by silt(parking) +duplex (1+2) will it be considered as 3600 buildup area considering land size is 1200 sqft
Kindly share your plan to 9500385799
Hi ,
I'm also looking for same plan. Did you got any info from builder?
FYI,
30*40 = 1200sqft
Plan is to go by silt ( full parking) + duplex from first floor.
Available in kanchipuram?
Good 🎉🎉🎉Tq
Excellent
Good Morning Sachi Sir
Glad you find this video helpful.
Nanga 2500 sft house plan Enga parking area 550 sqft. Plan panni errukom 12*46 parking area sqft cost evalvu. Varum sir unga kita project pannalam endru errukom nanga coimbatore vadavalli area
@@PixelStudios-d7s what’sApp to 9500385799 for estimates
Civil works (upto int&ext plastering) cost maximum of 60% of total project value, so your mode of payments is highly favourable for Contractors side. As per your details of payment modes, you get 90% of payment before even starting finishing works. Is it a trap for clients?
@@abdulganirifai The contractor is eligible to receive the 90% of the payment once External plastering is completed.
It means by that time,
1.inner putty should be finished
2.electrical piping and wiring completed
3.door frames must be fixed
4.window grills are fixed
5. Compound wall and outer works are completed and plastered finished
6.Plumbing phase-1 works are done .
In simple words- “After completion of External plastering Stage” means, SITE IS JUST READY FOR FLOORING works.
By receiving that(10th stage) 10% payment, the contractor must
1.purchase and lay tiles
2.remaining partial external works must be completed
3.Gate and external staircase must be completed.
4.Surkhi must be completed
After the above works completed, the contractor is eligible to receive the 11th stage- 5%
By receiving this amount
1.Doors & windows
2.Switches
3.plumbing fittings
On Handing Over Keys- 5%.
Note: Personally I am shocked now, to think in your way if a contractor completes plastering and get 90% and ABSCOND. 😂😂😂
Thanks for the comment. Will make a video explaining the break ups of this schedule.
Good sir, it's better to mention clearly in every payment mode to avoid conflicts
Sir total payment mode showing 110% kindly check.
@@Kannanem No Sir, There is No Such mistake. Total 11 Stages:
First 9 stages each 10%
Last 2 stages each 5%
Total : 100%
@silentvalleyconstruction Thank you sir for your prompt reply. I verified the sheet attached in the description, serial number 8 is missing that only created the confusion.
By the way this was an amazing video guide to both the consumer as well as for rookie builders.
Sir will you provide services in Hosur?
No sir. We do in Chennai and Coimbatore only
@@silentvalleyconstruction Thanks
Sir, plot size 21*45 total 945 sqft, indha sizekku neenga construction pannuverngala (duplex house) in Coimbatore
Hi. I am builder from Coimbatore. Do you have plans.?
@@urbanaconcepts Kindly Update your information
We take projects above 2000 sft sir.
Good morning sir
Good Morning sir. Glad our video engaging you.
Form please
Can you plese send the detais that you ahve explained
You can download from the link in Description !
In case of stilt (only parking in ground floor) what is the cost
It varies depending on the plan. You can What’s App 9500385799
சார் எங்களுக்கு தர்மபுரியில் ப்ராஜெக்ட் செய்ய முடியுமா
We are doing projects in Coimbatore and Chennai sir.
1100 sq ft நம்ம ஊறில செய்து தர முடியுமாசார்
We take projects above 2000 sft sir !
Rate. Not. Talking
@@manickaveluv4423 kindly watch from 3.20 mins for Rate