2:13-2:14 the next station is closed, this train will not stop a the next station [Canary wharf🚫⛔️] 3:53 the next station is closed, this train will not stop a the next station [North Greenwich🚫⛔️]
North Greenwich. 2 trains per hour terminate there, and often park there and bounce back to increase the number of Jubilee trains in service in the central area. it's likely that train terminated there before it was closed
I can see people inside the train, I’m guessing that part of the line is just a junction where trains can switch tracks and you can see through to the other side.
It wasn't parked, that is North Greenwich, it has adjacent platforms and side by side tracks. This is the only part on the JLE where this happens. What you saw was two trains passing eachother. I don't think it was parked, trains at North Greenwich can be 'parked' at the bay platform.
It’s unclear why. As previously mentioned, it could be the Automatic Train Operation (ATO) that doesn’t let the train go past the station a a fast speed.
OK so north greenwich is closed. Canary wharf is closed. Bermondsey is closed. London Bridge is closed. Westminster is closed. Green park is closed. Bond Street is closed. In 2017
Back in the 70s and 80s trains used to pass through closed stations without slowing down. I'm presuming the ATO system doesn't allow this.
Q which is strange because these stations have platform edge doors
Yea makes no sense to slow down, there are platform edge doors?
Probably because there might be people working also on the PSD, then the driver must be ready to immediately stop the train
Press F for respect rip canwary whatf and North Greenwich are bothvclosed
F
Crud, What a crazy day.
It’s quite cool when tube trains skip stops!
No
@@DunielYTGaming No, its not cool? or just No?
For enthusiasts, yes. Not for locals though I bet haha
southwest455 cause I like all the stations in the London Underground
You get to your destination faster
Why do I feel like the person saying „the next station is closed“ sounds the same as the person saying it for the northern line.
It is.
jubilee line being an express train like some metropolican line for 6 minutes and 40 seconds
Have the issues with the Jubilee trains now been fixed?
What issue?
Ahh most of the poles are painted silver now, but see this video was taken in 2017...
Elizabeth line will too
2:13-2:14 the next station is closed, this train will not stop a the next station [Canary wharf🚫⛔️]
3:53 the next station is closed, this train will not stop a the next station [North Greenwich🚫⛔️]
4:14 why is there a train parked there? The station is closed??
North Greenwich. 2 trains per hour terminate there, and often park there and bounce back to increase the number of Jubilee trains in service in the central area. it's likely that train terminated there before it was closed
Wouldn’t there not be northbound service then
I can see people inside the train, I’m guessing that part of the line is just a junction where trains can switch tracks and you can see through to the other side.
It’s just cause the train stopped at the station 🚉 before it closed cause it needed to terminate
It wasn't parked, that is North Greenwich, it has adjacent platforms and side by side tracks. This is the only part on the JLE where this happens. What you saw was two trains passing eachother. I don't think it was parked, trains at North Greenwich can be 'parked' at the bay platform.
These stations have PSDs. Why don't they just run straight through at full speed? Spacing issues?
It’s unclear why. As previously mentioned, it could be the Automatic Train Operation (ATO) that doesn’t let the train go past the station a a fast speed.
@@trans1t464 Or maybe it needs to slow down to keep spacing between trains?
Wait why did both stations close?
VincentKoh LUMCFan Probably he recorded during station strike.
m.th-cam.com/video/aNQcguV-_O0/w-d-xo.html
London Underground Genius
I don’t think so
Maybe because of covid I don’t know
British Cheese date it got published was before covid clusters in London
@@britishcheese5027 yeah i love cheddar cheese
Why were they both closed?
Good Question!
This is because of a strike on the day that this is recorded(9th January 2017).
@@acnhsasha3085 what is a strike?
@@the_2_td_sthe workers want more money so they don't work (it's a way of protesting)
Jubilee line express service?
What time did you film this? Seems a bit dark outside
@Mohammed-Abdul BASITH 5:48 and onwards
Why were they both closed
Maybe for prepairs
It was because of a strike on the day this was recorded(9th January 2017).
So canary wharf and North greenwich station was closed??.
I hate when the tube strike in 2017.
Only canning town station
I was think around this station. But the central line to mlie end and benthal green station is closed for that.
OK so north greenwich is closed. Canary wharf is closed. Bermondsey is closed. London Bridge is closed. Westminster is closed. Green park is closed. Bond Street is closed.
In 2017
He said. canary wharf and North greenwich both closed, next stop canning town. Station
Why is canary wharf and North greenwich both closed??.
Why was canary wharf and north Greenwich closed?
Aditya Jaokar those stations had industrial action.
@@transportfromolly ohhhh ok
I don't know
A strike
I bet that during strike and covid, some stations are closed, and some tube lines have express services
Next stop Canning Town..............station 😂😂
That train must be one of the very few jubille line trains whuch are not grey trains
@@smg3125 oh damn it
Do we still hv yellow trains on both northern and jubilee lines though?
MAS_ pilot I think so
Northern has all blue I think.
What happened?
That driver sounded so depressed
Must be tired. I believe he had a long day
2x The next station is closed. This train will not stop at the next station.
Press f for respect due to Canwary Wharf is closed
And north greewnich
Trudy Gordon e
Multiple Gamer2862 lol
Trudy Gordon are they still closed?
@@mahammad No
I can't drive
Station is closed
What... they are both closed great.
This was jan 2020
No this was actually 2017
That was 9/1/17
Tilly and Friends From CBeebies
BOOOOOOOOOOO WHY CANARY WHARF AND NORTH GREENWICH CLOSED?
@DunielYT Gaming they were closed as they both had industrial action as there was a strike on the day this was recorded(9th January 2017).