DESIGN OF PILE CAP WITH PILE IN ETABS

แชร์
ฝัง
  • เผยแพร่เมื่อ 2 เม.ย. 2019
  • #Pile #PileCap #Etabs #PileSpring
    MODEL,ANALYSIS & DESIGN OF PILE CAP WITH PILE IN ETABS.
    CORRECTION: Kh & Kv I have put here in kN/m unit, but it will be in kN/mm unit. Horizontal Stiffness can be determined in different ways. Here used simplified procedure.

ความคิดเห็น • 89

  • @abdallahothman717
    @abdallahothman717 3 ปีที่แล้ว +1

    Thank you very much
    I am one of people who learn and get knowledge from you and thank you again .

  • @user-fy1kc1qq2z
    @user-fy1kc1qq2z 7 หลายเดือนก่อน

    Thank you very much for your helpful ETABS Tutorial. All the best.

  • @mdtariqulislam2795
    @mdtariqulislam2795 5 ปีที่แล้ว

    Thank you and may allah returns all of ur efforts

  • @civilengineeringplatform1368
    @civilengineeringplatform1368 5 ปีที่แล้ว

    thank you so much for this tutorial

  • @arifuzzamanmithu7160
    @arifuzzamanmithu7160 5 ปีที่แล้ว

    Assalamualikum.i am a flower of u.you are doing very good job for us .it is very helpful.pls keep it up.may allah bless you.thank you

  • @mogaliess
    @mogaliess 5 ปีที่แล้ว

    بارك الله فيك

  • @mostafaelbaroudy471
    @mostafaelbaroudy471 5 ปีที่แล้ว

    great video

  • @nikkorianto2700
    @nikkorianto2700 10 หลายเดือนก่อน

    What is fhe stiffness modifier of pilecap? Use 0.35 as same as beam or we dont need to cracked pilecap.

  • @fillbertnjoko7875
    @fillbertnjoko7875 2 ปีที่แล้ว +2

    What is the difference between ETABS and SAFE if ETABS can model everything we need (e.g. pile cap, flat slab)?

  • @fatmabela5570
    @fatmabela5570 4 ปีที่แล้ว

    thank you so much for this tutorialربي يجزيك خير

  • @mohammedeliashossain4947
    @mohammedeliashossain4947 3 ปีที่แล้ว

    Brother is there any way to assign point spring as compression only because here in Etabs i have not seen anything like safe to define this as compression only.

  • @sulaimanleman6646
    @sulaimanleman6646 4 ปีที่แล้ว

    Allahu akbar..
    Jazakalloh khair bhay

  • @carlosrobles2002
    @carlosrobles2002 9 หลายเดือนก่อน

    Do you insert kv at the beginning and end of the pile?

  • @basicrevit
    @basicrevit 5 หลายเดือนก่อน

    Boss the value of Kh & Kv, is it in kN/mm? Because in ETABS it is kN/m. Thanks.

  • @engayedalayed7004
    @engayedalayed7004 3 ปีที่แล้ว +6

    MANY THANKS. BUT I NOTICE THAT YOU PUT THE SPRIN VALUES IN KN/m.l since it's calculate by excel sheet in KN/mm.l

    • @8123476450
      @8123476450 ปีที่แล้ว

      Yaa true I noticed that.

  • @guitarplayengineer7935
    @guitarplayengineer7935 2 ปีที่แล้ว

    Did you assigned Kv at top and bottom of the pile?

  • @erzahidahmad8314
    @erzahidahmad8314 2 ปีที่แล้ว +1

    Why is there top reinforcement at pile cap top face??? I mean bottom should be required there but top for which force....if it's just distribution

  • @engrkaribul
    @engrkaribul 4 ปีที่แล้ว +1

    Sir, It is a request to you to make a tutorial on the Laterally loaded pile, shore pile, and earthquake resisting pile designed in ETABS software.

  • @azmat_waseem
    @azmat_waseem 2 ปีที่แล้ว

    Very Informative... Thanks...

    • @Decodebd
      @Decodebd  2 ปีที่แล้ว +1

      My pleasure

  • @krishnakantkarekar7760
    @krishnakantkarekar7760 ปีที่แล้ว

    Excellent Sir...very proper video

    • @Decodebd
      @Decodebd  ปีที่แล้ว

      Thanks, Keep watching.

  • @mdtariqulislam2795
    @mdtariqulislam2795 5 ปีที่แล้ว +8

    Brother , also include excel file so that we can look applied equations

  • @codkhan813
    @codkhan813 3 ปีที่แล้ว

    can anyone guide me about ( in realistic analysis soil is _________ hinge , spring or roller ?)

  • @mehedihassanuzzal5516
    @mehedihassanuzzal5516 3 ปีที่แล้ว +5

    Sir, can I get the excel sheet, please?

  • @abdulmomin9360
    @abdulmomin9360 5 ปีที่แล้ว

    here you have calculated spring value in kN/mm but assigned in kN/m, would you please explain??

    • @Decodebd
      @Decodebd  5 ปีที่แล้ว

      Check in the description, correction given in this regard.

  • @kkb3091
    @kkb3091 5 ปีที่แล้ว +2

    Vaiya, can you provide any reference for calculation of spring constants?

  • @HOWTOEngineering
    @HOWTOEngineering ปีที่แล้ว

    Can u share your excel spread sheet(i use it in study purpose only)?

  • @VikramSingh-dx4oe
    @VikramSingh-dx4oe 14 วันที่ผ่านมา

    Need your excel sheet for pile can you provide?

  • @nermeenfakhoury3960
    @nermeenfakhoury3960 2 ปีที่แล้ว +2

    Hi Mr. DECODE BD,
    Could you please share the excel file with us?

  • @aaengineeringconstruction74
    @aaengineeringconstruction74 3 ปีที่แล้ว

    i need etab 2016 licence error problem plz help me anyone

  • @djamilahad9179
    @djamilahad9179 4 ปีที่แล้ว

    According which code

  • @atiqurrahman8730
    @atiqurrahman8730 5 ปีที่แล้ว +1

    Hello, Humayun Bhai. This is a very insightful video. However, I would like to know pile spring calculations or at least a reference where I can find it.

    • @engrkaribul
      @engrkaribul 4 ปีที่แล้ว

      get the calculation?

  • @engrkaribul
    @engrkaribul 5 ปีที่แล้ว +1

    Sir, can you share the excel file, plz?

  • @allenmascot3222
    @allenmascot3222 4 ปีที่แล้ว

    Please formula for the number of pile required on the sheet

  • @nafissadik.ce1344
    @nafissadik.ce1344 ปีที่แล้ว

    Just amazing !!! May Allah bless you. How can i get the excel file?

  • @civilEngineering1145
    @civilEngineering1145 5 ปีที่แล้ว

    it's better to define the rotation about x and y by kn.mm
    ad approximately equal to (9800) rather than translator about x and y

    • @Decodebd
      @Decodebd  5 ปีที่แล้ว +1

      Yes. There are lots of better way to do it more precisely.

    • @nermeenfakhoury3960
      @nermeenfakhoury3960 2 ปีที่แล้ว

      Hi Mr. Amer,
      May I know how do you calculate it as a rotation about x and y?

  • @farcryrana9327
    @farcryrana9327 5 ปีที่แล้ว

    need excel sheet sir...would u kindly give the link plz..............??

  • @modylil-somr1074
    @modylil-somr1074 5 ปีที่แล้ว

    May i have this excel sheet , please ?

  • @KhurshidAlam-ny1xw
    @KhurshidAlam-ny1xw 4 ปีที่แล้ว

    Sir are you from,

  • @sufiyannagarji6935
    @sufiyannagarji6935 5 ปีที่แล้ว

    pls show the measurements in metre scale its difficult to understand the feet and inches scale

  • @katherineoriettyhernandezm6730
    @katherineoriettyhernandezm6730 3 ปีที่แล้ว +1

    Hello, great video. I
    would like to ask something. If you couldn't assume Kh as 10% of the vertical spring, how can I correctly calculate this Kh.
    I hope you can clarify my doubts!

    • @katherineoriettyhernandezm6730
      @katherineoriettyhernandezm6730 3 ปีที่แล้ว

      And also, Why do I have to consider a Kv right in the intersection between pile cap and the piles top. Not only in the pile's base.
      Thanks again!

  • @dannycrisbalace1472
    @dannycrisbalace1472 5 ปีที่แล้ว

    very nice tutorial.Thank you.. How about the design of bored pile? do you have video also?

  • @joe31121
    @joe31121 5 ปีที่แล้ว +1

    Sir make videos of API program in Etabs

    • @Decodebd
      @Decodebd  5 ปีที่แล้ว

      Will try

  • @MostafaAhmed-nt2ws
    @MostafaAhmed-nt2ws 3 ปีที่แล้ว

    why translation to arabic not found when vidio downloaded ..sad

  • @md.ahashanhabib2863
    @md.ahashanhabib2863 3 ปีที่แล้ว

    please any one give etabs letast etabs software with detailing ribbon

  • @tanmoykhan3417
    @tanmoykhan3417 11 หลายเดือนก่อน

    Can I get the excel sheet

  • @cesolutionstructuralengine6538
    @cesolutionstructuralengine6538 5 ปีที่แล้ว

    Can you give me this file excel ?

  • @mohammedabdlaty3564
    @mohammedabdlaty3564 5 ปีที่แล้ว +2

    you have big mistake dear .you put values for kh and kv in kn/m same values in kn/mm that meaninig you must put 66000kn/m NOT 66.6KN/m. plz correct it

    • @Decodebd
      @Decodebd  5 ปีที่แล้ว +4

      Yes, Thanks for the correction. Unconsciously I forgot change the unit.

  • @krishneelram
    @krishneelram 5 ปีที่แล้ว

    What does NC means in slab design?

    • @Decodebd
      @Decodebd  5 ปีที่แล้ว +1

      Not Calculated. Where it's not applicable to check Punching shear there it shows N/C.

  • @abdelmohsenghoneimy689
    @abdelmohsenghoneimy689 4 ปีที่แล้ว +2

    Please share microsoft excel file

  • @sokunvirak7215
    @sokunvirak7215 4 ปีที่แล้ว +1

    Can Share Excel file bro ?

  • @LWMiraz
    @LWMiraz 4 ปีที่แล้ว

    দুইটি পাইল ক্যাপ ওভারল্যাপ করলে কিভাবে ডিজাইন করা হয়?
    স্যার, এইটার জন্য একটা টিউটোরিয়াল দিলে খুব উপকৃত হতাম।

    • @Decodebd
      @Decodebd  4 ปีที่แล้ว +4

      If 2 pile cap overlaps then provide combined pile cap. For example, 1 pile cap having 4 piles & another pile cap having 3 Piles, if they overlap then provide a Pile Cap of 7 piles.

  • @stephenjoseph7899
    @stephenjoseph7899 5 ปีที่แล้ว +1

    Excel sheet please

  • @frsaj7396
    @frsaj7396 5 ปีที่แล้ว

    excel sheet ples

  • @khansher7904
    @khansher7904 3 ปีที่แล้ว

    Please sir provide the excel sheet

  • @mohamedtahaa2893
    @mohamedtahaa2893 2 ปีที่แล้ว

    excel file please

    • @Decodebd
      @Decodebd  2 ปีที่แล้ว

      Check in resource page of the website www.decode-bd.com

    • @mohamedtahaa2893
      @mohamedtahaa2893 2 ปีที่แล้ว

      @@Decodebd not found file

  • @showmitrabarua2555
    @showmitrabarua2555 ปีที่แล้ว

    Thank you very much for your helpful ETABS Tutorial. All the best.

    • @Decodebd
      @Decodebd  ปีที่แล้ว

      You are welcome!

  • @vaibhavkothari5175
    @vaibhavkothari5175 5 ปีที่แล้ว +1

    Please share microsoft excel file