Navi Mumbai Coastal Road Project | Finally Work Started | July 2024 Update
ฝัง
- เผยแพร่เมื่อ 30 มิ.ย. 2024
- The City and Industrial Development Corporation (CIDCO) in India is set to begin work on two road projects in Navi Mumbai, the Ulwe Coastal Road (UCR) and Kharghar Coastal Road (KCR), to ensure seamless connectivity to the under-construction Navi Mumbai International Airport. The UCR will connect the Mumbai Trans Harbour Link (Atal Setu) to the Navi Mumbai International Airport and received permission to cut 3,728 mangroves. The KCR will connect the Kharghar node to the CBD Belapur node and is awaiting clearance from the Ministry of Environment, Forest and Climate Change. Both projects are expected to be completed by early 2026.
Connect me on-
Twitter- / jaideepkane
Instagram- / ferroequinologist_jaideep
Do show NH48 ka situation from virar to ghodbunder, your and droneman videos are seen by ministers also. Taking a patient from vasai to mumbai is also sometimes not possible.
Bdw great video as always. Great work keep it up. And loved your podcast and passion for railways
good point, this has to be highlighted nationally.. journey is unbearable
Also NH 160 - It's in pathetic condition because of rains and roadwork
2028 tak pura hoga😊
2026 tak 100% pura honga at least mthl to airport/Amra Marga
A bit long don't u think? 😢
Sahi kaha 2028 May hoga
If congress is elected in Maharashtra, then it will be 2030 😅
Bhai 2026 end तक हो जायेगा.अगर मोदी government रही तो अगर मोदी government pad गयी तो गयो 😂😂
Excellent coverage.
Superb Video. Work going really fast. Cidco does amazing speed
Great video दादा ❤
Short, crisp and to the point. Really liked the video 👍
Jo nisarag hai usse waisey hi rakhey. Very beautiful.
Thank you for the update...
Awesome ❤
Ek number
Thanks for the video, i liked it, so i gave you a thumbs up. From UK.
Nice video bhai
Nice one 👏👏👍👌😊
Very nice
sahi hai
Good video bro
Complete it faster 2026
just suggestion 4:28 while showing NMIA connector you changed orientation(rd direction) of drone would have been better to start clip from same direction to right turn to NMIA..great video ..liked yr podcast with power train.
Atal setu pe thoda to trafic hai, accha laga dekhke
💪🇮🇳💪
GOOD SPACE OF WORK ! HOIL 2026 pryt nkki
Why have wetlands when we can have roads and then complain when it gets flooded
Very nicely explained.
However, sudden increase in volume of background music is creating nuisance.
Sir,
Please make video about Ghansoli -Airoli Palm Beach extension road project
Tumcha podcast baghitla PT war.
Please apdete kashedi ghat tunnel,poladpur site,taneel joint road
Update on Palm beach 2 plz
Please make video showing link road connecting Navi Mumbai international airport to Mumbai Pune expressway 🙏🏻
खंडेश्वर rail to airport naye road I updates ke bare me vedeo banaye
कांदळवने सुरक्षित राहावीत....ती नवी मुंबई ची कवचकुंडले आहेत....जवळच्या दृष्टिकोनातून फक्त फायदा पाहिला जाऊ नये...दूरच्या दृष्टिकोनातून होणारा फायदा ही लक्षात घेतला जावा....
Mangroves will be destroyed because of this road, feeling sad 😢
Jaideep bro.
Does the coastal road strech from Ulwe till Dronagiri ?
kalyan kasara 3rd line drone updates pls
2030 tak pura hogaa confirm✅✅
A bit long don't you think?I think by 2027 starting or ending
Friend good video and very informative. But I need your help for thane nasik highway as their are some issues which can be corrected by your help so do help in this matter
Need your mail id to have conversations
Minimum 2-4 years lagnar ajun
The south side of ulwe costal road(if planned) should be going further from JNPT to Karanja connector to Alibaug future bridge connecting NM to Alibaugh.
Any clarity on Karanja bridge ?
Karanja bridge working going on.
सर्व ठिकाणी कामे चालू आहे. मग भायेंडर ते नायगाव पुल का नाही बनवत. वसई विरार मध्ये लोकल ट्रेन शिवाय दुसरा पर्याय का नाही बनवत पुल. काही समजेल का jk भाऊ 🎉❤
Mumbai coastal road is making progress to virar.
Virar alibaug corridor any updates please????
Karanjade side Ka development dikhao
Wahan kya hai? Airport east enterence?
NMIA is set to open in 2025 then how people will get connectivity to NMIA since coastal road will be still under construction? Is there any other approach road they are planning to open temporarily?
There are already lot of roads in this area, there was not even need of this costal road who will kill all natural beauty in this area. Q
CIDCO work is always very slow....
How to go to atal setu from airport via coastal road ? I dont see any connectivity
That I have mentioned in the Video
Coastal road to Atal Setu entry ramps
Dada, ekda Mumbai Goa Highway cha punha ekda video ganpatiutsav agodar houn jaunde
Yes dada August madhye karnar ahe
Please cover and show Mumbai Goa highway from Pen to Veer. The most delayed part of Mumbai Goa Highway.
Kuch bhi kaam nahi kiya hai! Too slow. Next year tak Phase 1 start ho raha hai airport ka. Agar inhone connectivity nahi banayi toh bahot issues hone wale hai! Iske wajhese flights nahi lenge log agar yaha se flight hua toh, iss se aviation industry affect hoga.
Isn't this coastal road affecting the environment?
Go and protest there standing in those mud flats with all your other activists.
Yes
कितने पेड़ काटे जा रहे और बदले में घास लगाया जा रहा है 😢
Please start working on setting up a narrative also… Indians are a bit sentimental.. A sense of FEAR needs to be created just the way the FOREIGN TH-camRS create….
For Ex - Why these construction didn’t take place before? , Why the other governments didn’t invest heavily in INFRA? What will happen if the governments change? How stays and opposing to these projects will effect a common man? All of this is missing… This needs to be addressed
No one will watch your channel on development works now as Maharashtra has chosen jehadis
why there are no train till alibaug ?