SAP - CV01N - Creating a Document

แชร์
ฝัง
  • เผยแพร่เมื่อ 10 พ.ย. 2024

ความคิดเห็น • 13

  • @snaketubeful
    @snaketubeful 2 ปีที่แล้ว

    Hello,
    You mentioned attaching the document to a BOM.
    after the Document is created, how do you attach it to a BOM?

  • @a2zuser1
    @a2zuser1 ปีที่แล้ว

    Hi, After creating document using CV01N, how do you link that doc to a material number?

  • @JuaraKids
    @JuaraKids 2 ปีที่แล้ว

    how to attach documnet to tasklist and see them on work order?

  • @ahmetkahraman225
    @ahmetkahraman225 4 ปีที่แล้ว

    How can i add this document to be printed out with a preventive maintenance order

  • @undefinepoet8272
    @undefinepoet8272 4 ปีที่แล้ว

    Hello, Brother hope you Are doing Good,im ABAPer I got Requirement regarding Enhancement, is Whenever user Create New version of the document if the previous version has not been Released one message will generate "only single version of the document allowed' , then the second user should allow create new document.

  • @dupreei
    @dupreei 5 ปีที่แล้ว

    I have created the document as you showed, but how to added/attached it to a task list operation in IA06, so when the plan triggers the work order the attachment prints besides the operation instructions?

    • @elitevisiontechnology2809
      @elitevisiontechnology2809  5 ปีที่แล้ว

      There is a way to do it. But depending on how you're SAP is configured with the server. My current company configuration is not set up correctly, so I can't really put a video together. Shoot me an email at kevin@elitevisiontechnology.tech and I can walk you through it.

    • @dupreei
      @dupreei 5 ปีที่แล้ว

      @@elitevisiontechnology2809 actually after attached the PRT as document in the task list operation, I did a manual call on IP10, the new order came with the document on the operation's PRT, it also printed the attachment just went hit print button. But, do know any other way to attach documents to operations in task list and be able to print them on the work order?

    • @elitevisiontechnology2809
      @elitevisiontechnology2809  5 ปีที่แล้ว

      kevin@elitevisiontechnology.tech
      You would have convert your image, document, or file into a bitmap. And then :
      insert->graphic
      Into the operation text

    • @JuaraKids
      @JuaraKids 2 ปีที่แล้ว

      well i have same question. my current company is set different as my previous..

    • @VeeruGopae5439
      @VeeruGopae5439 7 หลายเดือนก่อน

      ​@@elitevisiontechnology2809 Hi ​ @elitevisiontechnology2809 I have small doubt can we able to create .url files?

  • @raju123211
    @raju123211 5 ปีที่แล้ว

    Version is 00 but I want to create a new document with version 05 directly...