RHC CHB Load Calculator Tool as per NSCP 2015
ฝัง
- เผยแพร่เมื่อ 25 ก.ค. 2024
- If you find this tool is helpful you can donate via g-cash & PayPal. Thank you & God bless!
Gcash:
Ruel Cepeda
09454689202
Paypal:
ruelcepeda022813@gmail.com
Join our TH-cam community for just P49 only.
/ @rhcengineering
Free Excel Download here:
pobrengengineer.blogspot.com/...
Sir we normally use the Interior partition walls loads is 1.0kpa on slab as per NSCP yours is different computation confusing.
Please check & read again section 204.3 Partition Loads.
204.3 Partition Loads
"Floors in office buildings and other buildings which
partition locations are subject to change shall be design
to support, in addition to all other loads, a uniform
distributed dead load equal to 1.0 kPa."
If I'm not mistaken, it is a movable partition yung tinutukoy mo na 1.0kPa.
As per the NSCP "partition locations are subject to change" means not permanent. So if you have CHB walls you cannot directly assume 1.0kPa as your additional load to the superimposed dead load, you need to compute its approximate surface load.
nice boss
Thanks bossing, solid supporter ka talaga san Pobreng Engineer YT channel hehehe.
@@rhcengineering hahaha uu boss
@@kcince6372 Hahaha thanks bossing.
Hi Sir very informative, please make more videos, new subscriber here
Thanks.
Question po sir regarding chb on slab. Same lang po ba yan ng floor load if ang location ng chb is govern sa kabilang side? Example yung wall layout is near sa short side dimension/beam, technically mas malaki ang load na ibibigay kay short beam. Magkakaiba na po ang forces na icacarry ng bawat perimeter beams. Hoping na maenlighten po ako. Salamat
yes, much better if you will adopt the maximum load.
Sir, pwede po papasa nung file na excel?, Salamat po.
sir my detail kab jan ng grandstand concrete design?
Wala lods.
paano naman po if ang length ng chb wall is 4m? may formula ba na gagamitin located on the beam or same lang din?
Yang tool na yan pwede yan.
Pwede rin manual calculation, kung located sa beam yung chb multiply mo lang yung height ng chb sa pressure load mo para makuha mo yung equivalent uniform distributed load na iaapply sa beam.
Ano po ang ibig sabihin nung 800,600,and 400? In between full grout and no grout? Code ba yan? Like 800 means half grout?
Yes grout content yan as per the NSCP code.
sir how could i download this i already been subscribed and a join a membership level 2?
hello sis direct pm mo nalang ako here facebook.com/ruel101791
May manual solving po ba kayo sir?
Weight of wall divide by the floor area lang yan bro.
how to dl po yungnexcel
Nasa community po
Sir how to download the excel file?
Oks bro send ko sayo yung mga DL link.
pm mo ako here facebook.com/ruel101791
Hi po sir,, pwede po ako pahingi po ako ng excel file.tnx po
Nasa youtube community po