Stages Before the Track is Fully Ready for Normal Speed Traversal

แชร์
ฝัง
  • เผยแพร่เมื่อ 5 ส.ค. 2024
  • Ballast stones, also known as track ballast, are used along railway tracks to absorb vibrations from passing trains.
    Track laying is the process of installing railway tracks. This project involves upgrading the railway line between Jember and Banyuwangi by replacing the rails and their sleepers to enhance the safety, stability, comfort, and speed of the trains that run on the track.
    After the ballast stones are spread along the track, the next stage involves maintenance using specialized equipment: the Plasser Ballast Regulator (PBR) and the Multi Tie Tamper (MTT). The PBR is used to level the ballast in the center and on the right and left sides of the railway track, while the MTT compacts the ballast beneath the sleepers.
    | Camera : GoPro Hero 10, Nikon P1000
    | Location : Track between Arjasa-Kotok Km 204+9
    | Video Date : July 6th, 2024
    Table of Contents:
    0:00 Pandanwangi Train
    1:00 MTT Starts Work
    5:45 PBR Starts Work
    11:05 Work Results
    11:33 Outro
    #ptkai #keretaapi #keretaapiindonesia #railfans
    Subscribe here ( / @aayusuf7191 )
  • ยานยนต์และพาหนะ

ความคิดเห็น • 8

  • @lilissupriatin9823
    @lilissupriatin9823 25 วันที่ผ่านมา

    Masya Allah Aa Yusuf barokallahufiikum..
    Semoga Sehat selalu..

  • @kinzaalmurabbi-gk4df
    @kinzaalmurabbi-gk4df 16 วันที่ผ่านมา

    🔥

  • @tripstory_id
    @tripstory_id 26 วันที่ผ่านมา

    Persiapan menuju relasi jakarta - banyuwangi langsung tanpa transit. Semoga beneran terwujud 😁👍

  • @Kaarbaa
    @Kaarbaa หลายเดือนก่อน

    desa apa ini kak?

    • @aayusuf7191
      @aayusuf7191  หลายเดือนก่อน

      @@Kaarbaa Desa Bedadung.

  • @fathankece
    @fathankece 29 วันที่ผ่านมา

    Mas diperkirakan berapa bulan/hari lagi sepenuhnya selesai?

    • @aayusuf7191
      @aayusuf7191  29 วันที่ผ่านมา

      Wah mohon maaf, belum tau ya.