  • Santa Mesa station will be reconstructed as part of the North-South Commuter Railway. The two side platforms at the new station building's fifth level will be the highest in the world from ground level at 29.9 m (98 ft), exceeding Smith-Ninth Streets station's 26.7 m (88 ft)
    Santa Mesa was opened on December 22, 1905 as a station originally situated on the Antipolo and Montalban lines. From this station, the Main Line South, as well as its subsequent branch lines which were later abandoned (Naic and Carmona, Cavite; Batangas; Bay, Santa Cruz and Pagsanjan, Laguna; Canlubang, Laguna), branched out southwest from the line heading east southeast to Antipolo and Montalban. Main Line South was constructed not long afterward and was the first railway line of Manila Railroad Company (MRR, later PNR) crossing the Pasig River, with Pandacan and all the oil refineries and other branch lines, including one right to the former site of Philippine Vegetable Oil Company in Santa Mesa, being constructed right after the Pasig River bridge.

ความคิดเห็น • 29

  • @kaarinaeeeeaa
    @kaarinaeeeeaa 3 หลายเดือนก่อน +6

    Atleast di mukhang farm warehouse, tulad ng ibang rail lines natin (bukod sa LRT2)

  • @nestorreyes5253
    @nestorreyes5253 2 หลายเดือนก่อน +3

    Sana langp, pwede mag transport din ng good n products, di alng passengers itong tren. Need po anti ng mrang paraan ng transp ngmga produto para umigi ang ating eknomiya. Long term, sana po.

    • @sephirothcrescent1502
      @sephirothcrescent1502 หลายเดือนก่อน

      magkakaroon po ng subic-clark-manila-batangas railway. yan ung magtatransport ng goods.

  • @ramm1338
    @ramm1338 2 หลายเดือนก่อน +2

    Noticeably, the chaotic way on how houses and some structures were built and the pile of garbages along the way are reflections of the LGUs neglect of other areas around, focusing selectively on what needs to be given attention first.

  • @grilledbalutandmore
    @grilledbalutandmore 2 หลายเดือนก่อน +2

    SANA TANGGALIN MGA CABLE NA NASA MGA DAAN KAHIT MAGANDA MGA PROJECTS ANG SAGWA PA RIN TIGNAN MGA KURYENTE

  • @calebvillar9930
    @calebvillar9930 3 หลายเดือนก่อน +5

    i hope dotr and related project institutions release updated architectural documents for this project.

  • @lionflame21
    @lionflame21 2 หลายเดือนก่อน +1

    Sana gawan ng istasyon ng lrt2 dyan sa altura market, medyo malayo Ang pureza

  • @natsumidesu8019
    @natsumidesu8019 3 หลายเดือนก่อน +2

    Malala talaga yang si ate glo kaya ng makita kong bumisita yan kay inday sa davao eh naghinala nako kaya ayun nga d nagtagal umingay ang confidential fund ni inday, galing mong mag advice ate glo. Hello garci😅😅😅

  • @Tyteagas
    @Tyteagas 3 หลายเดือนก่อน +2

    😂 DUTERTE MALINIS DAW 😂😂ang lagay ba

  • @iamrenzramientos
    @iamrenzramientos 22 วันที่ผ่านมา

    Sana gnyan nga ung design, floorings,etc..Kasi sa existing train stations natin na lrt at mrt ang papangit ng mga stations, pangit ng floorings, stairs, walls wala man lang pintura.

  • @dennisquicksign157
    @dennisquicksign157 3 หลายเดือนก่อน +2

    2022 update pa ito. sa panahon na di pa ginigiba ung magsaysay flyover (dahil sa historical value) kaya ung option noon ng NSCR at nlex connector road ay dadaan sa ibabaw ng LRT2 kaya din sobrang taas ng sta mesa station sa plano. Pero may nabalitaan ako na since dinaan sa ilalim ung NLEX connector, isasabay na rin ung NSCR. at ililipat ung location ng stamesa station doon sa kabilang side ng magsaysay blvd. sa (paltok street) para mapalapit sa LRT2 pureza station.

    • @fameu1007
      @fameu1007 3 หลายเดือนก่อน

      filling ko lang ha hindi nayan ililipat kasi ang goal ng station ay ilapit sa PUP hindi sa lrt 2 pureza saka my napanood ako isang vlog yung jica study na my pinag pipilian kung sa taas or ibabaw o underground idadaan ang nscr pero walang station choices. kung my mababago man yung design station building lang ang babaguhin

    • @dennisquicksign157
      @dennisquicksign157 3 หลายเดือนก่อน

      @@fameu1007 iniba nga nila pati ung station design ng jica nung inaward nila itong contract package sa acciona dmci. noong 2023 kasabay sa presentation din ng walkthrouh ung paglipat ng espana station sa florentino st. pati ung sta mesa station. pero ngayon parang inuulit nila ung mga detailed study nila pati soil testing kaya pwede parin magbago ulit.

    • @dennisquicksign157
      @dennisquicksign157 3 หลายเดือนก่อน

      @@fameu1007 idagdag ko lang noong nilipat ung poste ng NGCP sa magsaysay blvd hindi nila inalis ung mga malalaking transmission lines sa harap ng PUP.

  • @EdithHazel-g9o
    @EdithHazel-g9o หลายเดือนก่อน

    Perez John Smith Brenda Lewis Anthony

  • @bonifacioresurreccion8710
    @bonifacioresurreccion8710 หลายเดือนก่อน

    hindi connected ang MRT 2 sa Sta Mesa Station????

  • @apgdream7958
    @apgdream7958 3 หลายเดือนก่อน +1

    Wow! Very nice update po ito! Ang galing...saludo po ako sa inyo. Thankful sa progress ng NSCR...at least ang pre-construction activities ay unti-unti nang sinisimulan. Once matapos na yung last leg ng NLEX-SLEX Connector Road hanggang sa Skyway Stage 3, for sure, clear na ang area na ito para sa full blast ng construction activities! Marami po talaga tayong pwedeng ipagpasalamat bilang Pilipino! Thank you at excited na rin po ako sa mga susunod pa ninyong vlog updates. Ingat po and salamat ng marami sa beautifully done videos!

  • @TammyJackson-r7d
    @TammyJackson-r7d 11 วันที่ผ่านมา

    Maryam Shoal

  • @floydemepearcy7161
    @floydemepearcy7161 3 วันที่ผ่านมา

    Hills Rapids

  • @MaryBlackwell-h8n
    @MaryBlackwell-h8n 8 วันที่ผ่านมา

    Nolan Inlet

  • @merrileeleonard6372
    @merrileeleonard6372 3 หลายเดือนก่อน

    Snippet: Hinde pa pala na organize ang Sta. Mesa hang-gang ngayon. Marami parin behind time na mga electrical wires sa streets na dapat ng e-cabling sa panahon ngayon. Ang dapat mag ayos ng bansa ay kung sinong naka opo na presidenti sa Malanyang Palace, at ang kanyang mga appointed leaders. Responsibility nila ang lahat -- dahil sa kanila galing ang funding or money pang bayad ng pag re-building ng bayan at mga gusali; townships; infrastructure; elevated highways; bldg more housing; pintura; landscaping; at re-arranging ng lahat ng housing communities; sila rin ang mag tang-gal ng mga squatters and more. Eto ang trabaho ng leaders na benigyan ninyo ng leadership positions -- may mga Responsibility silang lahat! Kung may maketa kayong mga embornal at traffic lights na sira-sira na -- e-report sa MMDA or DOTr at sa other sub-system offices under the sitting president responsibility & Job Description. Tayoy mag tulong-tulong sa pag ayos ng ating boong tahanan -- the Philippines Isle. In Christ Jesus We Believed. Carry on. ju2024

  • @avenouj
    @avenouj 2 หลายเดือนก่อน +2

    Nakakahiya mga pinaggagawa ng previous leaders...
    Tatay digong lang talaga SAKALAM❤

  • @EsterlitaManlapaz-n4u
    @EsterlitaManlapaz-n4u 2 หลายเดือนก่อน

    👆👉

  • @toppy_ctp
    @toppy_ctp 3 หลายเดือนก่อน

    Thanks for this update! Good Job!!😂

  • @philotto7844
    @philotto7844 3 หลายเดือนก่อน +1

    Yong ayuda Kong ginawang product Dami Sana trabaho

  • @Edwinibis1988
    @Edwinibis1988 3 หลายเดือนก่อน

    Kahirapan at poor infrastructures oo si ninoy dahilan