Slide rail install day 2

แชร์
ฝัง
  • เผยแพร่เมื่อ 12 ก.ย. 2024
  • This was what we did on day two of our slide rail install. This is going to be a dry watch (no voice-over)

ความคิดเห็น • 8

  • @chopboss
    @chopboss 10 หลายเดือนก่อน +1

    Amazing video as always. I really miss ur vids bro, do you think you will start uploading more often?

    • @TheLeverMonkey
      @TheLeverMonkey  10 หลายเดือนก่อน +1

      I have been working almost every day. And I have a bunch of family issues going on as well. I will do my best to find time. I still have four more days on the slide rail system I can make.

    • @chopboss
      @chopboss 10 หลายเดือนก่อน +1

      @@TheLeverMonkey ah true I see. Hope all is going well with you and your family brother! Sounds good, I’ll be looking forward to that! All the best, God bless🙏🏻👍🏼

  • @csweet4810
    @csweet4810 10 หลายเดือนก่อน +1

    What is the project at hand. How deep will it be. All dug from the side ?

    • @TheLeverMonkey
      @TheLeverMonkey  10 หลายเดือนก่อน +1

      this was some time ago. going 25 feet and yes all is dug out from the side.

  • @ericamlin1460
    @ericamlin1460 10 หลายเดือนก่อน

    👍

  • @jordanduarn7998
    @jordanduarn7998 10 หลายเดือนก่อน

    What keeps the spreaders from sliding all the way down?

    • @TheLeverMonkey
      @TheLeverMonkey  9 หลายเดือนก่อน +1

      The pressure of the dirt behind them. That is why we backfill the top panel, to help keep it in place.