  • A section of rail between Gore and Charlton went through a sleeper replacement program late last year.
    After a period of settling, the Track Tamper & Regulator crew came through to realign the track, so the temporary speed restrictions could be lifted.
    The track must have been out of alignment, as it took three passes of the Tamper & Regulator until the alignment was satisfactory.

ความคิดเห็น • 6

  • @darrylbond5238
    @darrylbond5238 25 วันที่ผ่านมา +1

    These things are always fascinating to watch!

    • @TravellingRailSpotter
      @TravellingRailSpotter  25 วันที่ผ่านมา +1

      Yes. Was also the first time the siding in Gore had been used in a while.

  • @TrainSpottingNewZealand
    @TrainSpottingNewZealand 25 วันที่ผ่านมา

    Awesome catch , Nice to be able to see it in action

    • @TravellingRailSpotter
      @TravellingRailSpotter  25 วันที่ผ่านมา +1

      Thanks, was also the first time the siding in Gore had been used in a number of years.

  • @NC.Trainspotting
    @NC.Trainspotting หลายเดือนก่อน

    Interesting to see it in action, I only saw it in the sidings when I recorded 931 and 932 the day before you filmed this.

    • @TravellingRailSpotter
      @TravellingRailSpotter  หลายเดือนก่อน +1

      Yes there are certainly a interesting piece of kit, & the fact that they are continuously moving. I remember years ago seeing the ballast cleaner working down here. I'm unsure if i have seen one down here since.