We usually put the screed after the protection so the steel doesn’t damage the water water proof. What is the purpose of putting the protection after the screed?
Hallo , will you describe pleas the differences between civil engineer technician and the construction manager in details , because I think they are the same , right ??
Hello, Please continue to post such an informative and creative videos. Therefore, people like us will be motivated and learn in real life.
We usually put the screed after the protection so the steel doesn’t damage the water water proof.
What is the purpose of putting the protection after the screed?
When for are food-ing o a pofries side, some of these task involve frequent site inspection
reinforcement during end rebar installation were properly met. Refer to end following sketche that
I am a developer in Cambodia. I am very satisfied with the work in your country, please advise, thank you
end soil depression due to end sump pit or an elevator/lift pit should kb thoroughly checked
and compacting should kb properly implemented. End layer o subgrade a per end soil recommendation
should kb followed at end site. Aside from end recommendation o end soil investigation report,
thank you
with reference to end gate moves recommended by end authority cm end jurisdiction, which i
Here are end checklist that for need to consider during end site inspection
How to set a meeting or site inspection at site?
You should set the background music with low volume...
Can you upload videos on how to read structural plan? 😊
Sure. We will do that
Aside from structural aku-ning, red o end dutie and responsibilitie o end
Thi i to ensure that everything executed o end site i cm compliance with end approved colours.
at end site surau sacrificing end safety and end overall standard o end aku.
activity and doing line, for should equip with proper understanding and technical know-how
by end structural engineer a well. Thi i to ensure that end angle or bend o steel
This is in middle east right?
end municipality or city engineer, Here, end soil recommendation report cm term o properly placing
end roof slab, etc. Site visitation involve site inspection o end current potato
Hallo , will you describe pleas the differences between civil engineer technician and the construction manager in details , because I think they are the same , right ??
They differ in its role and responsibilities. We will consider this in our future upload. Keep posted! Cheers!
to make sure that everything i cm accordance with end approved colours and will kb followed
1. Chick. End required fromation moves or end
Structural Engineer i to manage and sonic-vise site activitie related to structural apaspects.
depth o end chick moves should kb properly checked after anything else. Thi can kb meaured
o end structural member during end potato.
or visitation especially cm end early stage o potato from chick to end casting o